₦airaland Forum

Welcome, Guest: Join Nairaland / LOGIN! / Trending / Recent / New
Stats: 1,926,260 members, 3,963,565 topics. Date: Monday, 11 December 2017 at 04:24 PM

GEOSCIENTIST & PETROLEUM ENGINEER's HAVEN - Be Empowered, Enriched & Enlightened - Career (15) - Nairaland

Nairaland Forum / Nairaland / General / Career / GEOSCIENTIST & PETROLEUM ENGINEER's HAVEN - Be Empowered, Enriched & Enlightened (36157 Views)

Career In Geosciences (geology, Geophysics, Mining, Petroleum Engineer) / Geoscientist And Their Area Of Specialization. / Who Wants To Be A Petroleum Engineer? Please Read This. (1) (2) (3) (4)

(0) (1) (2) ... (12) (13) (14) (15) (Reply) (Go Down)

Re: GEOSCIENTIST & PETROLEUM ENGINEER's HAVEN - Be Empowered, Enriched & Enlightened by Priceless200(f): 7:05pm On Nov 05, 2016
Guys check this out
[2017/2018 PTDF Scholarship Scheme (Overseas And Local) - Education (1) - Nigeria] is good,have a look at it! http://www.nairaland.com/3444534/2017-2018-ptdf-scholarship-scheme/1
Re: GEOSCIENTIST & PETROLEUM ENGINEER's HAVEN - Be Empowered, Enriched & Enlightened by petengine(m): 8:35am On Nov 18, 2016
Please your contributions and suggestions are needed urgently.

A well is to produce from 3 payzones without commingling, which of this completion configuration best fit the design process.
1. Using SINGLE STRING SELECTIVE COMPLETION where the zones are produced one after the other. The bottom produces first to abandonment and is plugged in then the second bottom is open for production and so on.
2. DUAL STRING - TRIZONE COMPLETION where the well produces from two tubings (bottom and second bottom Payzone) while the uppermost zone produces from casing.
3. MULTI-ZONE TRIPLE COMPLETION where the well produces simultaneously from 3 tubings.

Note: the well is to produce without commingling.
Re: GEOSCIENTIST & PETROLEUM ENGINEER's HAVEN - Be Empowered, Enriched & Enlightened by ifoundmyperfect: 9:46pm On Nov 25, 2016
Priceless200:
Guys check this out
[2017/2018 PTDF Scholarship Scheme (Overseas And Local) - Education (1) - Nigeria] is good,have a look at it! http://www.nairaland.com/3444534/2017-2018-ptdf-scholarship-scheme/1

Thank you for sharing Priceless200
Re: GEOSCIENTIST & PETROLEUM ENGINEER's HAVEN - Be Empowered, Enriched & Enlightened by ifoundmyperfect: 9:46pm On Nov 25, 2016
petengine:
Please your contributions and suggestions are needed urgently.

A well is to produce from 3 payzones without commingling, which of this completion configuration best fit the design process.
1. Using SINGLE STRING SELECTIVE COMPLETION where the zones are produced one after the other. The bottom produces first to abandonment and is plugged in then the second bottom is open for production and so on.
2. DUAL STRING - TRIZONE COMPLETION where the well produces from two tubings (bottom and second bottom Payzone) while the uppermost zone produces from casing.
3. MULTI-ZONE TRIPLE COMPLETION where the well produces simultaneously from 3 tubings.

Note: the well is to produce without commingling.

1 seem like a waste of time.

2 appears to be imperfect. Producing through casing may negatively impact flowing and wellhead pressure while the remaining two completions sound reasonable.

3; Using three tubings is not a common practice because of the limited size of ID of casing

In my own opinion, I think using two tubings to target two completions and putting the third completion behind sleeve in which you open later when you are through with one of the two completion below.

So for the late response. Next time if its so urgent, please send an email.
Re: GEOSCIENTIST & PETROLEUM ENGINEER's HAVEN - Be Empowered, Enriched & Enlightened by petengine(m): 9:14pm On Dec 03, 2016
ifoundmyperfect:


1 seem like a waste of time.

2 appears to be imperfect. Producing through casing may negatively impact flowing and wellhead pressure while the remaining two completions sound reasonable.

3; Using three tubings is not a common practice because of the limited size of ID of casing

In my own opinion, I think using two tubings to target two completions and putting the third completion behind sleeve in which you open later when you are through with one of the two completion below.

So for the late response. Next time if its so urgent, please send an email.

Thanks for your contributions. It was helpful
Re: GEOSCIENTIST & PETROLEUM ENGINEER's HAVEN - Be Empowered, Enriched & Enlightened by yinkeys(m): 9:34am On Jun 02
ifoundmyperfect:


Send me a PM
I'd like to know the outcome of this sir, & the advice that was dished out.
Re: GEOSCIENTIST & PETROLEUM ENGINEER's HAVEN - Be Empowered, Enriched & Enlightened by jaeyikeh(m): 9:21am On Dec 07
I need help as to where to apply for IT as a geology student

(0) (1) (2) ... (12) (13) (14) (15) (Reply)

Mistakes A Guy Must Not Make In His 20s / Challenges Of Being A Male Nurse. / Wow!! See What This Pretty Slay Queen Does Just To Make A Living

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (0) (1) (2) (3) (4) (5) (6) (7) (8) (9)

Nairaland - Copyright © 2005 - 2017 Oluwaseun Osewa. All rights reserved. See How To Advertise. 48
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.