FG To Take Over Expansion Of Lagos-badagry Road by atlwireles: 8:36pm On Sep 22, 2014
Lagos - The Federal Government is to take over reconstruction and expansion of the Lagos-Badagry Expressway, the Minister of Works, Mr Mike Onolememen, said on Monday.

The minister said this in Lagos during a slide presentation of work on the Oshodi-Apapa Expressway by Julius Berger Plc.

The presentation took place at the company’s office complex in Ijora.

Onolememen said that a new project design that involved five other ECOWAS member-countries was being undertaken.

He gave the assurance that the project would soon be implemented.

The minister said that a regional effort would be the best way to handle the road project.

He said that he was the Chairman of a five-member Country Project Steering Committee on the project.

“We will definitely get into the construction stage; at that time, all the challenges the Lagos State Government is having on that road will be a thing of the past because we will construct that road,“ he said.

The minister directed Julius Berger to complete rehabilitation of the Apapa/Oshodi Expressway in the next eight weeks.

“Take remedial works into consideration; three months is too far and would be chaotic, considering the ember months; maybe, you should look for ways to get less construction time.

“Let us see if we can terminate the emergency works by November,“ he said.

While inspecting the road, the minister said that rigid pavement was being used to reconstruct the road to cater for new load capacity which was not envisaged when the road was built in the 1970s.

He said that the Federal Government decided to take drastic measures to rehabilitate the road due to public outcry, following perennial gridlock on the road in June and July.

He said that the completion of a trailer park in Lagos was important as it would accommodate about 500 trucks and decongest the highway.

“Given the clemency of weather, Julius Berger should be able to finish emergency repairs in another eight weeks.

“The new design takes cognizance of heavy traffic.

“Rigid pavement would be used to fight the menace of surface and underground water prevalence on the road,“ he said.

The Lagos State Government embarked on expansion of the Lagos-Badagry Road from four to 10 lanes on April, 2009.

Construction of a light rail line and a Bus Rapid Transit corridor is part of the project, to enhance tourism and economic activities on this axis. (NAN)

- See more at: http://www.vanguardngr.com/2014/09/fg-take-expansion-lagos-badagry-road/#sthash.kfk2dy9j.dpuf

6 Likes 1 Share

Re: FG To Take Over Expansion Of Lagos-badagry Road by Richhommie(m): 8:41pm On Sep 22, 2014
They should take over. That road is taking ages to complete.

2 Likes

Re: FG To Take Over Expansion Of Lagos-badagry Road by aljharem(m): 8:50pm On Sep 22, 2014
Good move !
Re: FG To Take Over Expansion Of Lagos-badagry Road by Nobody: 8:51pm On Sep 22, 2014
If taking over the road will make them faster,please they should go ahead. I am tired of complaining about that road.

1 Like

Re: FG To Take Over Expansion Of Lagos-badagry Road by atlwireles: 8:53pm On Sep 22, 2014
What of all the debts accumulated by the state of Lagos because of this road? cheesy cheesy cheesy cheesy At least now, there is hope for my tenants in Ojo.

11 Likes

Re: FG To Take Over Expansion Of Lagos-badagry Road by 2cato: 9:09pm On Sep 22, 2014
When it comes to that road the lasag govt have lost focus. Fg should collect it from tihem so that funding and handling will be direct from Fg

6 Likes

Re: FG To Take Over Expansion Of Lagos-badagry Road by BlackPikiN(m): 9:23pm On Sep 22, 2014
What about all the money borrowed by the state govt to construct that road? E don fly out of window be that?

11 Likes 1 Share

Re: FG To Take Over Expansion Of Lagos-badagry Road by brownlords: 9:26pm On Sep 22, 2014
Meaning they are done with all roads in the country?
Re: FG To Take Over Expansion Of Lagos-badagry Road by talktimi(m): 9:33pm On Sep 22, 2014
Some loans have entered voicemail be dat

4 Likes

Re: FG To Take Over Expansion Of Lagos-badagry Road by phlemzy: 9:33pm On Sep 22, 2014
The debts attached to the road will be taken over as well so dat FG can get all the lauds when the job is finally completed.
Re: FG To Take Over Expansion Of Lagos-badagry Road by Firefire(m): 9:48pm On Sep 22, 2014
Good move.

All the BOND/LOAN collected by LASG has gone into thin air… Well done Fashola & Tinubu. God is watching you people.

11 Likes 3 Shares

Re: FG To Take Over Expansion Of Lagos-badagry Road by oduastates: 9:54pm On Sep 22, 2014
That road has always been a federal road. A road which most our west african neighbours use has been left to rot

5 Likes

Re: FG To Take Over Expansion Of Lagos-badagry Road by Firefire(m): 9:59pm On Sep 22, 2014
oduastates: That road has always been a federal road. A road which most our west african neighbours use has been left to rot


Egba mi,

See wetin this guy dey yan ?


ACN now APC have FAILED COMPLETELY. angry


PROMISED & FAILED PARTY OF Treasury Looters

5 Likes 1 Share

Re: FG To Take Over Expansion Of Lagos-badagry Road by Firefire(m): 10:04pm On Sep 22, 2014
Richhommie: They should take over. That road is taking ages to complete.


All the Loan & Bond collected have been diverted... Hence, the continuous delay. sad sad

6 Likes

Re: FG To Take Over Expansion Of Lagos-badagry Road by Firefire(m): 10:10pm On Sep 22, 2014
10-lane Lagos-Badagry road to be ready June – Fashola on January 08, 2013

LAGOS — GOVERNOR Babatunde Fashola of Lagos State, Tuesday, said the first section of the 10-lane Lagos-Badagry Expressway will be completed this June.

This came as the governor flagged-off the track work of the blue light rail at Alaba Suru, Coker-Agunda Local Council Development Area, LCDA, of the state.Fashola who spoke during an inspection of the projects across the state, noted that the level of work on the National Art Theatre and Alaba-Mile 2 rail stations were in advance stage.

According to him, “in order to finish the road, the contractor did not go on vacation during the festive period, all these are geared towards ensuring that the project is delivered on time for residents’ use.”

The governor explained that the first section of the road which begun from National Theatre, Orile-Iganmu to Mile 2 Bus Stop Amuwo-Odofin Local Government, would be fully completed with the tracks laid.He said “While the construction work continues on the rail project from Orile-Iganmu to Marina, the expansion work on the road from Mile 2 to Okokomaiko will also be intensified.

This is what we do with the loan collected by the state government.We don’t use our loan to pay salaries and other recurrent expenditure; all we do with our loan is to provide capital projects that would benefit the residents.

”Fashola declared that “when the project is completed, the state would be at par with other major cities of the world.”

The governor added the type of transport system he desired for the state was that in few years, his “dream transportation system would have begun to manifest in the state.

http://www.vanguardngr.com/2013/01/10-lane-lagos-badagry-road-to-be-ready-june-fashola/

SIX (6+) YEARS HAVE GONE ALREADY

Fashola, continue deceiving them.

14 Likes 3 Shares

Re: FG To Take Over Expansion Of Lagos-badagry Road by Firefire(m): 10:23pm On Sep 22, 2014

6 Likes 1 Share

Re: FG To Take Over Expansion Of Lagos-badagry Road by Firefire(m): 10:29pm On Sep 22, 2014
The APC propagandist will avoid this thread like a plague

7 Likes

Re: FG To Take Over Expansion Of Lagos-badagry Road by Nobody: 10:32pm On Sep 22, 2014
If taking over would enhance early completion, so be it.
Re: FG To Take Over Expansion Of Lagos-badagry Road by Firefire(m): 10:50pm On Sep 22, 2014
Tales Of Agony On Lagos-Badagry Road

The reconstruction of the Lagos-Badagry Expressway into a 10-super-highway, complete with light rail, is taking longer than even the Lagos State Government that is championing this laudable project anticipated. Financing is not going as planned and the government is not getting support from any other source within the country either. All of a sudden, there is a growing sense of despondency among residents on that axis of the city, which is also felt by those who do business out there

Traveling through the Lagos-Badagry road requires some form of patience and bravery because it’s a task that could take up to four or five hours.

The Lagos-Badagry road by law is designated a federal road because it is an international highway linking the nation to the West African region. It is of a higher stature than all other interstate roads that also belong to the federal government. Besides, the federal government built Lagos roads and infrastructure by virtue of its status then as the nation’s administrative capital.

Regardless, Lagos is exercising its usual visionary leadership to reconstruct the road with the assistance of the World Bank at a cost of about N220 billion (about US$ 1.5 billion). Where is this FUND

When the reconstruction and expansion project began in 2009, there was hope that it would take only a short time to complete since the Orile-Mile II stretch was done with ‘incredible’ speed taking into consideration how government works.

Regardless, the Lagos-Badagry expressway reconstruction Lot II, stretching from Mile II to Badagry that was contracted to China Civil Engineering and Construction Corporation (CCECC) is now at snail-speed to the discomfort of commuters.


http://www.thisdaylive.com/articles/tales-of-agony-on-lagos-badagry-road/167453/

1 Like

Re: FG To Take Over Expansion Of Lagos-badagry Road by talktimi(m): 11:30pm On Sep 22, 2014
Firefire: Tales Of Agony On Lagos-Badagry Road

The reconstruction of the Lagos-Badagry Expressway into a 10-super-highway, complete with light rail, is taking longer than even the Lagos State Government that is championing this laudable project anticipated. Financing is not going as planned and the government is not getting support from any other source within the country either. All of a sudden, there is a growing sense of despondency among residents on that axis of the city, which is also felt by those who do business out there

Traveling through the Lagos-Badagry road requires some form of patience and bravery because it’s a task that could take up to four or five hours.

The Lagos-Badagry road by law is designated a federal road because it is an international highway linking the nation to the West African region. It is of a higher stature than all other interstate roads that also belong to the federal government. Besides, the federal government built Lagos roads and infrastructure by virtue of its status then as the nation’s administrative capital.

Regardless, Lagos is exercising its usual visionary leadership to reconstruct the road with the assistance of the World Bank at a cost of about N220 billion (about US$ 1.5 billion). Where is this FUND

When the reconstruction and expansion project began in 2009, there was hope that it would take only a short time to complete since the Orile-Mile II stretch was done with ‘incredible’ speed taking into consideration how government works.

Regardless, the Lagos-Badagry expressway reconstruction Lot II, stretching from Mile II to Badagry that was contracted to China Civil Engineering and Construction Corporation (CCECC) is now at snail-speed to the discomfort of commuters.


http://www.thisdaylive.com/articles/tales-of-agony-on-lagos-badagry-road/167453/
OTURUGBEKEoooooooo shocked shocked shocked

1 Like

Re: FG To Take Over Expansion Of Lagos-badagry Road by Firefire(m): 11:35pm On Sep 22, 2014
talktimi: OTURUGBEKEoooooooo shocked shocked shocked

no be small thing oooo angry


Suffering & Smiling on that road na PART VII embarassed

1 Like

Re: FG To Take Over Expansion Of Lagos-badagry Road by Sall(m): 11:52pm On Sep 22, 2014
To start with the road is not the responsibility of Lagos state government. its the useless fg and the rest of west African government responsibility.now Lagos state has spent hug amount of its taxe payers money on the road and election is fast approaching fg has realize it can take over the construction of the road clurless government.

4 Likes

Re: FG To Take Over Expansion Of Lagos-badagry Road by NgeneUkwenu(f): 12:03am On Sep 23, 2014
They can't even try it! He is just making a political statement to hoodwink people as 2015 approaches!

Common rehabilitation of less than 30KM of Apapa-Oshodi expressway is taking them ages, almost 4 years yet they are looking a for a road to take over.

When are they taking over Enugu-ph expressway?

When are they taking over Odukpani-Ikot ekpene expressway?

When are they taking over Aba-ikot ekpene-umuahia expressway?

When are they taking over-Abakaliki-Afikpo Federal highway?

When are they taking over Amasiri-Isu-Enugu Federal highway?

When are they taking over Ore-Sagamu expressway?

When are they taking over calabar -ogoja Feederal highway?

So many dilapidated roads begging for attention!


That minister is smoking weed! Does he even know the technicalities and agreement lagos state signed with different parties before embarking on the construction?

Where were they till Lagos State government intervened on that road?

Foolish minister, foolish president!

17 Likes 2 Shares

Re: FG To Take Over Expansion Of Lagos-badagry Road by kelvincoll(m): 12:31am On Sep 23, 2014
Sall: To start with the road is not the responsibility of Lagos state government. its the useless fg and the rest of west African government responsibility.now Lagos state has spent hug amount of its taxe payers money on the road and election is fast approaching fg has realize it can take over the construction of the road clurless government.

The FG neva said twas d responsibilty of LASG to build the road neither did it force d burden on Oga Fashola, there had a agreement between both parties, While I register my displeasure with d FG not taking up this lmportant transnatinal road project does it justify huge amount\ time wasted and inabilty on LASG to deliver on d project even after different timelines had elapsed? Moreso the road is bcontructed with LOANs obtained not TAX PAYERs MONEY. All we need is a permanent solution irrespective of whicheva party handles or deliver

3 Likes

Re: FG To Take Over Expansion Of Lagos-badagry Road by talktimi(m): 8:15am On Sep 23, 2014
NgeneUkwenu: They can't even try it! He is just making a political statement to hoodwink people as 2015 approaches!

Common rehabilitation of less than 30KM of Apapa-Oshodi expressway is taking them ages, almost 4 years yet they are looking a for a road to take over.

When are they taking over Enugu-ph expressway?

When are they taking over Odukpani-Ikot ekpene expressway?

When are they taking over Aba-ikot ekpene-umuahia expressway?

When are they taking over-Abakaliki-Afikpo Federal highway?

When are they taking over Amasiri-Isu-Enugu Federal highway?

When are they taking over Ore-Sagamu expressway?

When are they taking over calabar -ogoja Feederal highway?

So many dilapidated roads begging for attention!


That minister is smoking weed! Does he even know the technicalities and agreement lagos state signed with different parties before embarking on the construction?

Where were they till Lagos State government intervened on that road?

Foolish minister, foolish president!
and fo0lish she.male. You know your way to Abuja, quietly go to aso rock and the ministers office and call those men fools to their face. This is an fg road and there's nothing you can do about it except maybe commit suicide

2 Likes

Re: FG To Take Over Expansion Of Lagos-badagry Road by talktimi(m): 8:18am On Sep 23, 2014
kelvincoll:

The FG neva said twas d responsibilty of LASG to build the road neither did it force d burden on Oga Fashola, there had a agreement between both parties, While I register my displeasure with d FG not taking up this lmportant transnatinal road project does it justify huge amount\ time wasted and inabilty on LASG to deliver on d project even after different timelines had elapsed? Moreso the road is bcontructed with LOANs obtained not TAX PAYERs MONEY. All we need is a permanent solution irrespective of whicheva party handles or deliver
they conveniently dodged the part about 1.5 billion dollars loan for the project yet they're here hyperventilating

3 Likes

Re: FG To Take Over Expansion Of Lagos-badagry Road by thunderrider: 10:07am On Sep 23, 2014
APC doing what they know how to do best

shocked shocked shocked shocked

2 Likes

Re: FG To Take Over Expansion Of Lagos-badagry Road by thunderrider: 10:08am On Sep 23, 2014
APC doing what they know how to do best


shocked shocked shocked shocked
Re: FG To Take Over Expansion Of Lagos-badagry Road by naughtylagosguy(m): 11:38am On Sep 23, 2014
Okay.
Re: FG To Take Over Expansion Of Lagos-badagry Road by jeron1(m): 11:38am On Sep 23, 2014
K
Re: FG To Take Over Expansion Of Lagos-badagry Road by kurajordan(m): 11:38am On Sep 23, 2014
.
Re: FG To Take Over Expansion Of Lagos-badagry Road by opeyemisteph: 11:40am On Sep 23, 2014
Do I believe this?

(1) (2) (3) (Reply)

Hennessy Unveils The New Venom F5,Which Could Be The 1st Road Car To Hit 300mph / How Do You Verify Prices When Your Mech Gives You A List Worth 70k / How My Rewire Tried To Trick Me By Turning Off VSC Light Without Fixing VSC

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 45
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.