Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. (14719 Views)

Crowd Hailing Fayose At The Commissioning Of Ikere-Ekiti Township Road / Iara Oshiomhole At The Commissioning Of Uju Romi Ultra Modern Market (Pics) / President Jonathan Commissions Phase 1 504MW Alaoji Power Station, In Abia- Pics (2) (3) (4)

(1) (2) (3) (4) (Reply) (Go Down)

Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by Longeria(m): 12:45pm On Mar 24, 2015
Commissioning Of Phase 1 504 Alaoji Power Station, Aba.


Watch it live here.



www.nta.ng/live /

4 Likes

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by Ozigbondu(m): 12:48pm On Mar 24, 2015
GEJ is working haters are in their enclave busy hating......GEJ everywhere you go.......GEJ till 2019

60 Likes 2 Shares

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by Longeria(m): 12:52pm On Mar 24, 2015
Ozigbondu:
GEJ is working
GBAM

35 Likes

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by john124(m): 12:54pm On Mar 24, 2015
Cool smiley

11 Likes 1 Share

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by Nobody: 12:54pm On Mar 24, 2015
Even till election day, he willl kip on doing d good work we ask him to do. A self-less leader!

44 Likes 1 Share

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by john124(m): 12:55pm On Mar 24, 2015
Ozigbondu:
GEJ is working
#hardfact

15 Likes

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by hillsate: 12:58pm On Mar 24, 2015
Seriously, with all the commissioning of power stations nation wide by GEJ, how come power is not improving.

41 Likes 3 Shares

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by Longeria(m): 12:58pm On Mar 24, 2015
According to power minister, when completed, Alaoji Power Station will generate over 1200 mega watts.
This is just the first phase.

22 Likes 1 Share

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by steppin: 1:01pm On Mar 24, 2015
Our Oga(GEJ) is working.
Haters can cry as usual.
GEJ carry go..

28 Likes

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by eliteweb(m): 1:01pm On Mar 24, 2015
Good one.

UP GEJ...

16 Likes

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by JackBaueress(f): 1:03pm On Mar 24, 2015
Longeria:
According to power minister, when completed, Alaoji Power Station will generate over 1200 mega watts.
This is just the first phase.
So it has not even been completed since how many years? grin Commissioning an incomplete project 3days to election is a fraud!


Buhari sai President! cheesy cheesy

50 Likes 4 Shares

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by john124(m): 1:03pm On Mar 24, 2015
hillsate:
Seriously, with all the commissioning of power stations nation wide by GEJ, how come power is not improving.
It takes time to effect my dear. Nigeria Is a big country, to verify this ask an engineer

14 Likes

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by Longeria(m): 1:03pm On Mar 24, 2015
GEJ has finished commissioning the project.





GEJ TILL 2019.

17 Likes 1 Share

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by christejames(m): 1:07pm On Mar 24, 2015
What does the opposition has over Jonathan? ...nothing!! There just like the toothless bulldog barking away its time. GEJ, keep the transformation coming cause good Nigerians are already ready to tell you a big thank you this coming Saturday by voting you in for continuity.

14 Likes

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by SkyBlue1: 1:10pm On Mar 24, 2015
All these eleventh hour commisioning that do not result in real effects, only the gullible will buy it. I have never seen Jonathan seemingly work so hard, and all because of threat of losing election. Only goes to show that there is absolutely no guarantee that anything will change if he is returned to power and all of this is just for show to win more votes. PDP has to lose this election for Nigeria to progress.

21 Likes

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by Longeria(m): 1:11pm On Mar 24, 2015
JackBaueress:
So it has not even been completed since how many years? grin Commissioning an incomplete project 3days to election is a fraud!


Buhari sai President! cheesy cheesy
Illiterate, can't you read? This is phase 1,it generates 504 mega watts which will be connected to national grid while work continue on the second phase.

34 Likes 2 Shares

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by Longeria(m): 1:14pm On Mar 24, 2015
SkyBlue1:
All these eleventh hour commisioning that do not result in real effects, only the gullible will buy it. I have never seen Jonathan seemingly work so hard, and all because of threat of losing election. Only goes to show that there is absolutely no guarantee that anything will change if he is returned to power and all of this is just for show to win more votes. PDP has to lose this election for Nigeria to progress.
I see pain in your blood.

Sorry in advance.

29 Likes 2 Shares

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by Abagworo(m): 1:17pm On Mar 24, 2015
Credit for Alaoji and Geometric goes to Obasanjo. Jonathan has been frustrating both plants. Geometric has long been completed but sabotaged by Sambo and Emeka Offor.

11 Likes 1 Share

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by VolvoS60(m): 1:18pm On Mar 24, 2015
SkyBlue1:
All these eleventh hour commisioning that do not result in real effects, only the gullible will buy it. I have never seen Jonathan seemingly work so hard, and all because of threat of losing election. Only goes to show that there is absolutely no guarantee that anything will change if he is returned to power and all of this is just for show to win more votes. PDP has to lose this election for Nigeria to progress.

^^^

+10

4 Likes

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by JackBaueress(f): 1:18pm On Mar 24, 2015
Longeria:

Illiterate, can't you read? This is phase 1,it generates 504 mega watts which will be connected to national grid while work continue on the second phase.
Dunce, that is a political gimmick. Jonathan is a fraud. Commissioning an incomplete project 3days to election na wayo!

Say no to political fraudsters!

14 Likes 3 Shares

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by SkyBlue1: 1:19pm On Mar 24, 2015
Longeria:

I see pain in your blood.
Sorry in advance.

No need to apologise to me I am fine, you lie in the bed you make. If you willingly choose to continue rewarding failure and incompetence in your life then that is your business. Hopefully other Nigerians think differently.

12 Likes

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by JackBaueress(f): 1:20pm On Mar 24, 2015
Abagworo:
Credit for Alaoji and Geometric goes to Obasanjo. Jonathan has been frustrating both plants. Geometric has long been completed but sabotaged by Sambo and Emeka Offor.
busted! Jonathan na wayo man. cheesy

11 Likes 1 Share

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by Longeria(m): 1:21pm On Mar 24, 2015
Abagworo:
Credit for Alaoji and Geometric goes to Obasanjo. Jonathan has been frustrating both plants. Geometric has long been completed but sabotaged by Sambo and Emeka Offor.
I can see your frustration. If you don't have anything to say, kindly do the needful.

18 Likes

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by Longeria(m): 1:24pm On Mar 24, 2015
JackBaueress:
Dunce, that is a political gimmick. Jonathan is a fraud. Commissioning an incomplete project 3days to election na wayo!

Say no to political fraudsters!
I can see your frustration.
Instead of making noise, tell us how Buhari is planning to make one naira to one dollar.

Liars.

14 Likes

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by Nobody: 1:26pm On Mar 24, 2015
JackBaueress:
Dunce, that is a political gimmick. Jonathan is a fraud. Commissioning an incomplete project 3days to election na wayo!

Say no to political fraudsters!



Jude or whatever you are called please continue hating because on Monday 30 Buhari your father will be crying his eyes out.

11 Likes

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by Longeria(m): 1:26pm On Mar 24, 2015
JackBaueress:
busted! Jonathan na wayo man. cheesy
Cry me a river.


GEJ TILL 2019.

18 Likes

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by Longeria(m): 1:32pm On Mar 24, 2015
Dominiquez:




Jude or whatever you are called please continue hating because on Monday 30 Buhari your father will be crying his eyes out.
Don't mind her.

9 Likes

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by kolaaderin: 1:35pm On Mar 24, 2015
john124:

It takes time to effect my dear. Nigeria Is a big country

And it takes time for generated power to walk on foot around the country.
What we are saying is that there is no propositional improvement at peoples home, its all a shame

5 Likes

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by missbehave247(m): 1:51pm On Mar 24, 2015
Transformation by GEJ

5 Likes

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by izenco2005(m): 1:51pm On Mar 24, 2015
Gen. Muhammadu Buhari, on Monday said he would ensure that the Naira was equal to the dollar in value, if voted into office







grin grin
jonny till Buhari go school

9 Likes

Re: Commissioning Of Phase 1, 504MW Alaoji Power Station - Aba, Live On NTA. by sammyj: 1:52pm On Mar 24, 2015
If them like let this clueless administration commission 1trillion MW na wash wash. He will lose gallantly come March 28 because we have decided to vote for CHANGE all the way.

KAI GEJ

SAI Buhari !!!

9 Likes 1 Share

(1) (2) (3) (4) (Reply)

FG To Hand Over Offa Robbery Case To Kwara State Government / Gbajabiamila, Other African Speakers Push for Debt Cancellation / Malami Lacks Unilateral Power To Amend Lawyers’ Professional Conduct – Akpata

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 30
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.