These Are Stages Involved In Building A House by odicity: 7:41am On Nov 20, 2015
Stages involved in Building a house

Most people that are nursing the dream of erecting a building structure are often curious about the stages involved in building their dream home. We want to give an overview of those stages

1.Seek advice from your Architect/Engineering on what type and size of land the can suit your dream house

2.look for a land speculator or agent, that will help you in getting the land that can soothes your purpose. make sure you see the land and get all necessary original document related to land before payment. you can arrange with a lawyer to help you in preparing and checking the documents to make sure you are not buying a land from the wrong person,and to avoid land with dispute.

3. You need meet with your local town planning authority in your area to make sure that land is meant for the purpose you have in mind and they can give first hand information about development pattern in that area.Land under Government acquisition will be found through this process.

4.you need to arrange with a Land surveyor to establish and draw out the site boundary, the surveyor will also put the position beacons on the boundaries.

5.The drawings of the land surveyor will be used to produce at befitting building plan for you, a set of plans building plan usually three will have to be used to seek for building plan approval.

6.Clear the site manually or mechanically(bulldozer)

7. You can now move to site, for about 2-3 bedroom bungalow at starting, get two trips of sand and a trip of gravel,

8. locate a secured place where you can keep your bags of cement

9. Acquire a tank or drum where water can always be stored for use.

10. Buy about 1000 blocks for a starter. you can choose from five,six and nine inches block as required or suggested by your builder.

11. Setting out time, in some case bricklayers uses blocks to set out a foundation most especially when it is a small building and the ground is level, The Builder can collaborate with bricklayer to do this in a some complex plan. They will have to buy woods, ropes, nails and you have to pay for the services or based on contract or as agreed.

12. After the setting out have be done foundation excavation commences, after excavation concrete is poured on the foundation and leveled. the leveling is done by a mason to ensure uniformity of foundation

13. Block laying begins. Blocks are laid by the bricklayers on the concrete to about three or more courses (Coaches) as required, this serving as the d.p.c level. It is then filled with red sand and rammed (compacted or made hard). an over-site concrete or (German floor) is poured round to cover the d.p.c (in waterlogged, sloppy or sandy area you may need to apply reinforcements or Iron at the edges of building and nylon-like membrane is used to cover some site especially when there is a threat of water problems).

14. At this stage blocks are laid to window base, four courses(coaches) or layers after marking out the doors, then after the four coaches(courses) you mark out the windows and go another five coaches(courses), the entire opening in the house is now ready for concrete lintel.

15. At this stage Iron benders or welders are involved, they will have to make their estimate the carpenter and the bricklayers are all going to work here the welder is responsible for cutting and bringing in the Iron, the carpenter makes the frame or form work to contain the concrete.The bricklayer with laborers pours(casts) into the boxes(form work) which are properly filled with concrete.

16. At least two or more layers of blocks are laid on the lintel after this the building is ready for roofing.

17. At this stage carpenters are contacted, the timber or steel in the case of larger projects are estimated and cost. Roofing material could be chosen from aluminum, asbestos, plastics, galvanized zinc.

18. The electrification and plumbering works can begin. You can now contact your electrician and plumber. you can ceiling simultaneously or after electrification. Your soak-away pig can now be Dug and connection of pipe services will be handled by the plumber,

19. At this stage door frames, wardrobes by furniture maker, windows and other accessories can commence

20. Tillers or terrazzo contractors can be contacted if need be.The tilling and plastering works can go on simultaneously. two to three trips of plaster sand will be needed for plastering a moderate size.


http://deljconsult.com/stages-involved-in-building-a-house/

32 Likes 11 Shares

Re: These Are Stages Involved In Building A House by Spy360(m): 1:13am On Oct 21, 2016
odicity:
Stages involved in Building a house

Most people that are nursing the dream of erecting a building structure are often curious about the stages involved in building their dream home. We want to give an overview of those stages

1.Seek advice from your Architect/Engineering on what type and size of land the can suit your dream house

2.look for a land speculator or agent, that will help you in getting the land that can soothes your purpose. make sure you see the land and get all necessary original document related to land before payment. you can arrange with a lawyer to help you in preparing and checking the documents to make sure you are not buying a land from the wrong person,and to avoid land with dispute.

3. You need meet with your local town planning authority in your area to make sure that land is meant for the purpose you have in mind and they can give first hand information about development pattern in that area.Land under Government acquisition will be found through this process.

4.you need to arrange with a Land surveyor to establish and draw out the site boundary, the surveyor will also put the position beacons on the boundaries.

5.The drawings of the land surveyor will be used to produce at befitting building plan for you, a set of plans building plan usually three will have to be used to seek for building plan approval.

6.Clear the site manually or mechanically(bulldozer)

7. You can now move to site, for about 2-3 bedroom bungalow at starting, get two trips of sand and a trip of gravel,

8. locate a secured place where you can keep your bags of cement

9. Acquire a tank or drum where water can always be stored for use.

10. Buy about 1000 blocks for a starter. you can choose from five,six and nine inches block as required or suggested by your builder.

11. Setting out time, in some case bricklayers uses blocks to set out a foundation most especially when it is a small building and the ground is level, The Builder can collaborate with bricklayer to do this in a some complex plan. They will have to buy woods, ropes, nails and you have to pay for the services or based on contract or as agreed.

12. After the setting out have be done foundation excavation commences, after excavation concrete is poured on the foundation and leveled. the leveling is done by a mason to ensure uniformity of foundation

13. Block laying begins. Blocks are laid by the bricklayers on the concrete to about three or more courses (Coaches) as required, this serving as the d.p.c level. It is then filled with red sand and rammed (compacted or made hard). an over-site concrete or (German floor) is poured round to cover the d.p.c (in waterlogged, sloppy or sandy area you may need to apply reinforcements or Iron at the edges of building and nylon-like membrane is used to cover some site especially when there is a threat of water problems).

14. At this stage blocks are laid to window base, four courses(coaches) or layers after marking out the doors, then after the four coaches(courses) you mark out the windows and go another five coaches(courses), the entire opening in the house is now ready for concrete lintel.

15. At this stage Iron benders or welders are involved, they will have to make their estimate the carpenter and the bricklayers are all going to work here the welder is responsible for cutting and bringing in the Iron, the carpenter makes the frame or form work to contain the concrete.The bricklayer with laborers pours(casts) into the boxes(form work) which are properly filled with concrete.

16. At least two or more layers of blocks are laid on the lintel after this the building is ready for roofing.

17. At this stage carpenters are contacted, the timber or steel in the case of larger projects are estimated and cost. Roofing material could be chosen from aluminum, asbestos, plastics, galvanized zinc.

18. The electrification and plumbering works can begin. You can now contact your electrician and plumber. you can ceiling simultaneously or after electrification. Your soak-away pig can now be Dug and connection of pipe services will be handled by the plumber,

19. At this stage door frames, wardrobes by furniture maker, windows and other accessories can commence

20. Tillers or terrazzo contractors can be contacted if need be.The tilling and plastering works can go on simultaneously. two to three trips of plaster sand will be needed for plastering a moderate size.


http://deljconsult.com/stages-involved-in-building-a-house/
Thanks. I plan to build a simple twin self contain house in half plot. I have a trusted bricklayer, do I need to get a contractor having known the process? I have time now.

4 Likes 1 Share

Re: These Are Stages Involved In Building A House by sonety2k(m): 2:51am On May 02, 2017
cool
Re: These Are Stages Involved In Building A House by Nobody: 7:26am On May 02, 2017
This is a good thread
Re: These Are Stages Involved In Building A House by money121(m): 7:26am On May 02, 2017
Ok
Re: These Are Stages Involved In Building A House by Teewhy2: 7:26am On May 02, 2017
Knowing a process of building a house is different from knowing the technicalities behind the process. A lot of people make things mistake just because they want to safe money but at the long run they spent more.
I know of a building where by the owner claim to know the process but at the end of the day he didn't consider the road level, so after the area has a significant level of development most of the rain water from the street flows into the man's compound. The road is yet to be tarred but already the compound is already lower than the road.
Most people that rent the ground flats don't spend more than a year before leaving because water enters their apartment. He is planning to do major renovation now and it is like penny wise pound foolish.


Are you building on a swampy area, want to do pile foundation /Need Roof parapet.
Reduce the building load by making use of polystyrene material for your roof parapet and slab.
Click below to get more information

https://www.nairaland.com/3726763/alternative-building-material-expanded-polystyrene

2 Likes

Re: These Are Stages Involved In Building A House by money121(m): 7:28am On May 02, 2017
Another Successful Roofing Project @ Owo in Ondo State..
Please what are you waiting for.. Call/WhatsApp 080-85-310-359 For your Next Roofing Project

Steptiles Aluminum 0.55mm guage

Roof meters 388m
Cladding 99m
flat Sheet 76m

Total Amount Spent for the materials: 1,204,500

Re: These Are Stages Involved In Building A House by DollarAngel(m): 7:28am On May 02, 2017
cool
Re: These Are Stages Involved In Building A House by Tenim47(m): 7:32am On May 02, 2017
money121:
Another Successful Roofing Project @ Owo in Ondo State..
Please what are you waiting for.. Call/WhatsApp 080-85-310-359 For your Next Roofing Project

Steptiles Aluminum 0.55mm guage

Roof meters 388m
Cladding 99m
flat Sheet 76m

Total Amount Spent for the materials: 1,204,500


we're planning how to lay a foundation here
.
thanks cool

4 Likes

Re: These Are Stages Involved In Building A House by obezaleel(m): 7:33am On May 02, 2017
please what's the meaning of d. p. c?
Re: These Are Stages Involved In Building A House by Flashmove: 7:34am On May 02, 2017
All these na write up for someone who have cash .

Building house now is not easy at all.

Cement 3k per bag in some locations

minimum wage salary in Nigeria #18K

I Just stopped my own for now.....let water soak it first make i rest.... ....... Decking loading....

4 Likes

Re: These Are Stages Involved In Building A House by money121(m): 7:35am On May 02, 2017
Tenim47:


we're planning how to lay a foundation here
.
thanks cool

Incase you get to that stage..
Kindly call/WhatsApp 08085310359

1 Like

Re: These Are Stages Involved In Building A House by MidasTouche01(m): 7:38am On May 02, 2017
Spy360:

Thanks. I plan to build a simple twin self contain house in half plot. I have a trusted bricklayer, do I need to get a contractor having known the process? I have time now.

You have a trusted bricklayer and u know the process?

Sir, lists like this are meant to put u in trouble, please employ the service of a competent Architect, he/she will transform your dream house into a reality.... that's what we do...

#MasterThinkers

1 Like 2 Shares

Re: These Are Stages Involved In Building A House by solarview(m): 7:39am On May 02, 2017
Also make provision for alternative energy source (Solar) installation. Create a nice and ventilated corner for inverter and battery
Re: These Are Stages Involved In Building A House by shams040(m): 7:42am On May 02, 2017
*EGC & ASSOCIATES*

*Our AIM*:
To bring to your finger tips the best in *Town Planning and GIS Mapping Services* and related fields of endeavours including EIA among others

Our Objectives:

1. Processing and perfection of title documents(survey plan, consent, C of O among others);
2. Building plan design and approvals;
3. Layout design and approval;
4. Technical report writing for residential; commercial, industrial and institutional uses eg EIA, TIA;
5. Project development and management;
6. G I S & Remote Sensing Mapping;
7. Academic & Business Research Analyst;
8. 3D Modelling and Animation;
9. Offering professional advice on land and landed property matters; and
10. Solid Waste Management.

www.egcandassociates.org.ng
Re: These Are Stages Involved In Building A House by Barselonia(m): 7:45am On May 02, 2017
Spy360:

Thanks. I plan to build a simple twin self contain house in half plot. I have a trusted bricklayer, do I need to get a contractor having known the process? I have time now.
U still need an advice of a professional, even if it's on consultancy level
Re: These Are Stages Involved In Building A House by Barselonia(m): 7:47am On May 02, 2017
obezaleel:
please what's the meaning of d. p. c?
Damp proof course:
moisture control applied to building walls and floors to prevent moisture from passing into the interior spaces.

7 Likes 2 Shares

Re: These Are Stages Involved In Building A House by jeftalene(m): 7:49am On May 02, 2017
Cool tho'

Meanwhile you can see latest prices of all building materials in Nigeria, lots of useful construction tips and contact a professional contractor at www.engineerosaz..com
Re: These Are Stages Involved In Building A House by shady16: 7:52am On May 02, 2017
cool
Re: These Are Stages Involved In Building A House by Nobody: 7:57am On May 02, 2017
Good one.
Re: These Are Stages Involved In Building A House by emmaliver(m): 7:57am On May 02, 2017
F
Re: These Are Stages Involved In Building A House by freeDR(m): 7:58am On May 02, 2017
Cool
Re: These Are Stages Involved In Building A House by jeftalene(m): 7:59am On May 02, 2017
obezaleel:
please what's the meaning of d. p. c?

Damp Proof Course

It can be taken as the level at which 'dampness' or moisture or water is stopped from seeping into the building from the ground or it is also used to describe the material used for achieving this, especially when placed in walls. Such materials can also be referred to as a Damp Proof Membrane (DPM).

See more useful construction tips at www.engineerosaz..com

1 Like

Re: These Are Stages Involved In Building A House by Skah: 8:04am On May 02, 2017
Oga, seek the service of a professional. Employ a Quantity Surveyor.
Re: These Are Stages Involved In Building A House by obinna2nv(m): 8:07am On May 02, 2017
Please house like how much would it cost to reroof a 6bedroom bungalow with sit out? Just an estimate. Thanks.
Re: These Are Stages Involved In Building A House by Ikenna17(m): 8:08am On May 02, 2017
FP after almost 2years. It's never too late to succeed in life....

2 Likes

Re: These Are Stages Involved In Building A House by Ajewealth123(m): 8:15am On May 02, 2017
Spy360:

Thanks. I plan to build a simple twin self contain house in half plot. I have a trusted bricklayer, do I need to get a contractor having known the process? I have time now.
you need a contractor sir.
Contact Delabas constructions sir
Re: These Are Stages Involved In Building A House by Ajewealth123(m): 8:16am On May 02, 2017
Spy360:

Thanks. I plan to build a simple twin self contain house in half plot. I have a trusted bricklayer, do I need to get a contractor having known the process? I have time now.
you need a contractor sir.
Contact Delabas constructions sir
Some bricklayers are good but you need an engineer on site sir
Re: These Are Stages Involved In Building A House by iamnicer: 8:20am On May 02, 2017
GREAT INFO
Re: These Are Stages Involved In Building A House by dharmillic(f): 8:22am On May 02, 2017
odicity:
Stages involved in Building a house

Most people that are nursing the dream of erecting a building structure are often curious about the stages involved in building their dream home. We want to give an overview of those stages

1.Seek advice from your Architect/Engineering on what type and size of land the can suit your dream house

2.look for a land speculator or agent, that will help you in getting the land that can soothes your purpose. make sure you see the land and get all necessary original document related to land before payment. you can arrange with a lawyer to help you in preparing and checking the documents to make sure you are not buying a land from the wrong person,and to avoid land with dispute.

3. You need meet with your local town planning authority in your area to make sure that land is meant for the purpose you have in mind and they can give first hand information about development pattern in that area.Land under Government acquisition will be found through this process.

4.you need to arrange with a Land surveyor to establish and draw out the site boundary, the surveyor will also put the position beacons on the boundaries.

5.The drawings of the land surveyor will be used to produce at befitting building plan for you, a set of plans building plan usually three will have to be used to seek for building plan approval.

6.Clear the site manually or mechanically(bulldozer)

7. You can now move to site, for about 2-3 bedroom bungalow at starting, get two trips of sand and a trip of gravel,

8. locate a secured place where you can keep your bags of cement

9. Acquire a tank or drum where water can always be stored for use.

10. Buy about 1000 blocks for a starter. you can choose from five,six and nine inches block as required or suggested by your builder.

11. Setting out time, in some case bricklayers uses blocks to set out a foundation most especially when it is a small building and the ground is level, The Builder can collaborate with bricklayer to do this in a some complex plan. They will have to buy woods, ropes, nails and you have to pay for the services or based on contract or as agreed.

12. After the setting out have be done foundation excavation commences, after excavation concrete is poured on the foundation and leveled. the leveling is done by a mason to ensure uniformity of foundation

13. Block laying begins. Blocks are laid by the bricklayers on the concrete to about three or more courses (Coaches) as required, this serving as the d.p.c level. It is then filled with red sand and rammed (compacted or made hard). an over-site concrete or (German floor) is poured round to cover the d.p.c (in waterlogged, sloppy or sandy area you may need to apply reinforcements or Iron at the edges of building and nylon-like membrane is used to cover some site especially when there is a threat of water problems).

14. At this stage blocks are laid to window base, four courses(coaches) or layers after marking out the doors, then after the four coaches(courses) you mark out the windows and go another five coaches(courses), the entire opening in the house is now ready for concrete lintel.

15. At this stage Iron benders or welders are involved, they will have to make their estimate the carpenter and the bricklayers are all going to work here the welder is responsible for cutting and bringing in the Iron, the carpenter makes the frame or form work to contain the concrete.The bricklayer with laborers pours(casts) into the boxes(form work) which are properly filled with concrete.

16. At least two or more layers of blocks are laid on the lintel after this the building is ready for roofing.

17. At this stage carpenters are contacted, the timber or steel in the case of larger projects are estimated and cost. Roofing material could be chosen from aluminum, asbestos, plastics, galvanized zinc.

18. The electrification and plumbering works can begin. You can now contact your electrician and plumber. you can ceiling simultaneously or after electrification. Your soak-away pig can now be Dug and connection of pipe services will be handled by the plumber,

19. At this stage door frames, wardrobes by furniture maker, windows and other accessories can commence

20. Tillers or terrazzo contractors can be contacted if need be.The tilling and plastering works can go on simultaneously. two to three trips of plaster sand will be needed for plastering a moderate size.


http://deljconsult.com/stages-involved-in-building-a-house/

You can also check out my post here >>> https://www.tolet.com.ng/blog/how-to-build-a-house/
Re: These Are Stages Involved In Building A House by Flashmove: 8:39am On May 02, 2017
dharmillic:


You can also check out my post here >>> https://www.tolet.com.ng/blog/how-to-build-a-house/

Please add ( ï ) to your domain name to become Toilet

make i check so so that you will not attack me like DSS....

(1) (2) (3) (Reply)

How Much Will It Cost To Lay The Foundation (only) Of A 3 Bedroom Flat / Why Do Affluent Areas In Nigeria Do This? / Osibona: My Ikoyi Building Projects Are Driven By Grace,Peace & Faith(Throwback)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 85
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.