Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,148,645 members, 7,801,877 topics. Date: Friday, 19 April 2024 at 03:21 AM

BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla - Properties - Nairaland

Nairaland Forum / Nairaland / General / Properties / BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla (8888 Views)

Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos / BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Ikrd / Bitsworks Project Memoirs: Construction Of 4 Units Of 2 Bedrooms Flat Ikorodu (2) (3) (4)

(1) (2) (3) (4) (5) (Reply) (Go Down)

BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 12:50pm On Aug 04, 2017
BITSWORKS Nigeria is a multi-discipline construction company comprising of architects, builders, civil engineers and interior designers.

We currently have a brief for a client to construct 4 units of 2 bedrooms flats on a plot of land in Mowo-Nla, Ikorodu. This is a virgin land with two plots side by side and it is a fairly flat terrain. We will be constructing on just a plot for now but we will be building a perimeter wall to secure both lands.

We will share the floor plan, elevations and 3D views once we have finalized on the design and permission has been given by the client.

Size of land - 1296 sqm
Total area of building -

Estimated budget for construction - currently unknown
PROJECT timeline - 12 months

We are currently constructing the perimeter wall and since its still part of the project, we will showcase and highlight the construction process here in the interim, until we start the main dwelling unit construction.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 1:15pm On Aug 04, 2017
Excavation work for the foundation footing trench started on the 11th of July and concluded on the 13th of July due to intermittent rainfall.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 1:21pm On Aug 04, 2017
More foundation trench excavation work pictures.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 6:22pm On Sep 02, 2017
Foundation footing blinding for the perimeter wall ongoing.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 6:26pm On Sep 02, 2017
More pictures of the blinding work.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 6:35pm On Sep 02, 2017
Block setting work in progress, we used 6" blocks all through with columns at intervals. The client earmarked 9 coaches all round with 2 entrance gates but due to the sloppy nature of the site, some places will have more than 9 coaches.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 6:55pm On Sep 02, 2017
More pictures of block setting work, 5 coaches plus achieved all around already.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by yak(m): 11:51pm On Sep 03, 2017
good work. am following. hope you don't mind me asking questions from time to time
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by yak(m): 11:51pm On Sep 03, 2017
good work. am following. hope you don't mind me asking questions from time to time
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 6:01am On Sep 10, 2017
yak:
good work. am following.
hope you don't mind me asking questions from time to time

Thank you. Yes you are free to ask any question.
Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 6:04am On Sep 10, 2017
Block setting now at 9-12 coaches all round the 2 plot perimeter.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 6:13am On Sep 10, 2017
Casting of the columns between the runs of block setting took place once we were done with the block work.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 6:18am On Sep 10, 2017
More pictures of the columns casting stage.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 6:26am On Sep 10, 2017
Staging of the entrance gate, we have two gates planned for the 2 plots of land. Both gates will grant access to each plot once the center demarcation wall has been erected but that's much later.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 6:32am On Sep 10, 2017
After the staging of the gates, the carpentry formwork and reinforcements work is done and it is then casted. We used a concrete mix of 1:2:4 .

The size of the gate pillar post (columns) is 22" x 22". This will add beauty to the facade of the gate later on when it is finished in artificial stones or tiles.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 8:54am On Sep 10, 2017
Gate columns all done and being allowed to cure. We won't remove the wood and bamboo bracing for another 2 weeks.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 3:23pm On Jun 08, 2018
We are back to site this month to continue the project.

Land clearing and grubbing started today in preparation for the foundation work starting next week.

The client also prefers blocks moulded on site so we will be mobilizing our block making equipment to site this weekend to start moulding blocks.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 12:21pm On Jun 12, 2018
Site has been cleared and the moulding of 9" blocks have commenced.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 8:24am On Jun 15, 2018
Block moulding ongoing.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 1:16pm On Jun 19, 2018
Setting-out and excavations of the foundation started on the 18th of June 2018.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 2:40pm On Jun 19, 2018
Aerial pictures of the foundation excavations. Shots by BITSWORKS-1.

1 Like

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 12:08pm On Jun 20, 2018
Foundation footing (blinding) casting in progress.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 1:44pm On Jun 20, 2018
More blinding pictures.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 3:49pm On Jun 20, 2018
Wrapping up with the foundation footing. Due to the topography of the land, we had to step the foundation footing.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 5:26am On Jun 21, 2018
Aerial pictures of the foundation layout. Shots by BITSWORKS-1.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 11:44am On Jun 21, 2018
First coach block setting for the foundation is laid on the footing(blinding)

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 3:25pm On Jun 21, 2018
Foundation block setting in progress.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 5:01pm On Jun 21, 2018
Foundation block setting....slow and steady progress.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 1:20pm On Jun 22, 2018
Wrapping up the rear unit foundation work.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 4:27am On Jun 23, 2018
Starting work on the front unit foundation.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 5:17am On Jun 23, 2018
Still ongoing.

Re: BITSWORKS PROJECT MEMOIRS: Construction Of 4 Units Of 2 Bedrooms Flat Mowo Nla by BITSWORKS: 8:27am On Jun 24, 2018
Wrapping up the front unit foundation block setting.

(1) (2) (3) (4) (5) (Reply)

HOT Hot 6 Bedroom Mansionate With 3 Sitting Areas Adeniyi Jones Ikeja. Lagos.. / Acres Of Land For Sale@benin City V.close To Gele-gele Seaport / Lekki Ocean View Estate Along Coastal Road Ibeju Lekki

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 28
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.