Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,148,595 members, 7,801,713 topics. Date: Thursday, 18 April 2024 at 08:56 PM

Fourth Mainland Bridge Is Coming Soon - Properties - Nairaland

Nairaland Forum / Nairaland / General / Properties / Fourth Mainland Bridge Is Coming Soon (1361 Views)

21 Things To Know About Proposed Fourth Mainland Bridge By Dennis Isong / 795 Houses To Be Demolished For Lagos Fourth Mainland Bridge / The Grandeur Abijo G.R.A 3 minutes from ajah bridge, [ XMAS PROMO 13M) WITH FR (2) (3) (4)

(1) (Reply) (Go Down)

Fourth Mainland Bridge Is Coming Soon by Realestatepro(m): 9:07am On Dec 08, 2017
The proposed 4th mainland bridge is set to be one of the highlights of the Governor Ambode-led Lagos state government. 


Like the 1st, 2nd and 3rd bridges, it is aimed at connecting the mainland of Lagos to the island, reducing traffic on the roads and generally making transportation within Lagos easier.

Here are 10 interesting facts you need to know about this bridge:

1. Began with Tinubu

The idea for the 4th mainland bridge first came up in the Asiwaju Bola Ahmed Tinubu administration, almost 14 years ago, so it is not at all a new idea. However, back then, the needed indices to achieve the construction were not available.

2. MOU was signed in May 2015

In May 2015, Governor Akinwunmi Ambode took a bold step by signing a Memorandum of Understanding (MoU) with a consortium of firms and finance houses for the construction of the 4th mainland bridge.

3. Obstacles

During its conception and design, the government had to stop several times, when faced with about 3,000 structures that will affect the bridge’s right of way since its conception.

4. 2,200 houses saved

To continue the construction, a new alignment design concept was produced. This new concept will save about 2,200 houses from being destroyed. This means that there will be a huge reduction in amount that will be spent on compensation.

5. Total length of bridge

The 4th mainland bridge when completed will be 38 kilometres long. Coming almost 50 years after the state’s existence and 26 years after the delivery of the third mainland bridge by the ex-military President Ibrahim Babangida.

6. Longest bridge

The project when completed will give birth to the longest of all the bridges connecting Lagos Island to the mainland, the 4th mainland bridge.

7. Places it will pass through

According to Ganiyu Johnson, the Commissioner for Works and Infrastructure, the bridge will pass through Ibeju Lekki, Langbasa, and Baiyeku towns, on the Lagoon estuaries to Itamaga, in Ikorodu.

8. Details

The bridge will serve as a complement to the Eko, Carter and Third Mainland Bridges and serve to deflood traffic. It will also have a four lane dual carriage way bridge.

Each lane, comprising three lanes with two metres wide shoulder on each side, and a generous median on each side to accommodate future expansion and light rail facility.

9. Special feature

Explaining a special feature, which he describes as “the heart.” Johnson said:

“This two level bridge will not only function as a means of transportation on its upper level, but would also stimulate and accommodate social, commercial and cultural interaction of pedestrians never before experienced in these parts on such terrains on its lower level to give a typical “Lagos Life” feel, with its tropical environment and intimate street level exchanges.”

10. Cost

The 4th mainland bridge will cost N844.4 billion. The project is to be financed by Africa Finance Corporation, Access Bank and other private investors who have already signified intention to be part of the construction, while Visible Assets Limited would be the coordinating firm.


https://www.naija.ng/921517-top-10-facts-need-know-proposed-4th-mainland-bridge.html
Re: Fourth Mainland Bridge Is Coming Soon by Realestatepro(m): 9:14am On Dec 08, 2017
How prepared are you to enjoy this massive development coming to Lagos?

What parts of Lagos have you invested in to position yourself at an advantage?

it might interest you to know that ikorodu and Ibeju Lekki are the two places where you should invest heavily and own a piece of real estate.

The fourth mainland bridge will pass through ibeju lekki directly to ikorodu and it will greatly open up ikorodu axis to multiple economic development.

be wise, secure your future today
Re: Fourth Mainland Bridge Is Coming Soon by mammanbawa: 9:22am On Dec 08, 2017
Good thing some homes will not be destroyed, bad thing some will be destroyed.
Re: Fourth Mainland Bridge Is Coming Soon by Realestatepro(m): 11:00am On Dec 08, 2017
mammanbawa:
Good thing some homes will not be destroyed, bad thing some will be destroyed.


that's right
Re: Fourth Mainland Bridge Is Coming Soon by Realestatepro(m): 11:40am On Dec 08, 2017
contact us for genuine lands at ikorodu axis. 08134845536

Re: Fourth Mainland Bridge Is Coming Soon by Realestatepro(m): 3:23pm On Dec 08, 2017
we also have genuine and affordable properties at ibeju Lekki axis.
Call or whatsapp 08134845536

Re: Fourth Mainland Bridge Is Coming Soon by Realestatepro(m): 7:11pm On Dec 20, 2019
2019 is almost ended... What have you achieved this year?
Don't make the same mistakes in 2020.
The main cause of lack of progress is lack of planning.
Start planning for 2020 or the same thing will reoccur next year
Re: Fourth Mainland Bridge Is Coming Soon by Realestatepro(m): 9:04am On Dec 26, 2019
Happy boxing day from us.
Remember out hotlines are 08134845536
Re: Fourth Mainland Bridge Is Coming Soon by Realestatepro(m): 12:03pm On Jan 06, 2020
2020 is already here.... Do you still want to remain a tenant?
Start working towards becoming a landlord this year. 08134845536
Re: Fourth Mainland Bridge Is Coming Soon by Realestatepro(m): 4:37pm On Jun 10, 2020
Re: Fourth Mainland Bridge Is Coming Soon by Realestatepro(m): 8:12am On Jul 07, 2021
Have you bought a property at Ikorodu, ibeju lekki and Epe to position yourself to enjoy the dividends of this massive infrastructure that's currently loading?
Give us a call today 08134845536
Re: Fourth Mainland Bridge Is Coming Soon by Realestatepro(m): 11:52am On Apr 26, 2023
Buy land, God isn't creating it anymore.
Give us send a WhatsApp message to get started today 08134845536
Re: Fourth Mainland Bridge Is Coming Soon by Realestatepro(m): 1:34pm On May 12, 2023
Sometimes you have to aim away from your target to hit it.
Sounds crazy, right?

But it's true! In real estate investment, you need to be flexible and adaptable to changing market conditions.

You can't just stick to one strategy and hope for the best.
You have to diversify your real estate portfolio, explore new opportunities, and take calculated risks.

That's how you achieve your goals in the long run.

Call us for real investment at the best locations 08134845536

(1) (Reply)

For Sale :: 70 Percent Completed House With 2 Units Of 3 Bedroom Flats ( Photos) / Buy Land In Ajah With C Of O Where Nigerians In Diaspora Are Investing,videos / How I Survived The 8-story Building Collapse That Trapped 50 People In Owerri

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 20
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.