Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,150,480 members, 7,808,752 topics. Date: Thursday, 25 April 2024 at 04:22 PM

DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] - Properties - Nairaland

Nairaland Forum / Nairaland / General / Properties / DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] (10439 Views)

For Sale::: Executive 3bedroom Flat Bungalow @ Ikorodu (pictures) / DIY: Construction Of A 3-bedroom Bungalow [ikorodu North LGA Isiwu] / DIY: Construction Of A 3-bedroom Bungalow [ikorodu North LGA Isiwu] (2) (3) (4)

(1) (2) (Reply) (Go Down)

DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by BITSWORKS: 6:13am On Mar 31, 2016
BITSWORKS Nigeria is a multi-discipline construction company comprising of architects, builders, civil engineers and interior designers. We currently have a brief for a client to construct a low budget 3-bedroom bungalow on a half plot of land in Ikorodu. The Site is a virgin land, the size is 18m(60ft) x 18m(60ft). We will share the floor plan,elevations and 3D views once permission has been given by the client.

Size of land - 324.00 sqm
Total area of building - 88.92 sqm
Total unbuilt area - 235.08 sqm
Percentage of site covered. - 36.4%
Percentage unbuilt - 63.6%

Client - Private individual, nairaland referral
Estimated budget for construction - N5million
PROJECT timeline - 4 months

Mobilization to site and site clearing/grubbing started on Wednesday 30th of March 2016, here are some pictures taken on site. Strip foundation will be used due to the nature of the soil and topology. Settting-out and foundation excavation will start immediately

Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by BITSWORKS: 1:33pm On Mar 31, 2016
Foundation excavation work ongoing.

Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by BITSWORKS: 1:50pm On Apr 01, 2016
Foundation footing casting ongoing. The depth of the foundation excavation is 18" deep and the land slopes slightly in two directions so the foundation will be stepped accordingly.

The thickness of the foundation footing is 4inches but to ensure a leveled and plumb surface for the foundation blockwork, it varies a bit but just slightly.

Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by M4gunners: 2:23pm On Apr 01, 2016
Following.
Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by BITSWORKS: 7:20pm On Apr 01, 2016
More foundation footing works pictures.

Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by BITSWORKS: 9:40pm On Apr 01, 2016
Foundation blockwork setting in progress, the first coach being laid.

Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by TalentManager: 9:55pm On Apr 01, 2016
Solid blocks & structure
Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by BITSWORKS: 1:54pm On Apr 02, 2016
The foundation is finally taking shape and we should be done by evening. We will be doing 4 coaches on the low side and 3 coaches on the high side of the slope.

Materials used for foundation footing and blockwork

1. 550nos 9inch blocks (N140/bags)
2. 20 bags of cement (N1600/bag)
3. 1 trip of 10tons granite (1/2 inch size)
4. 1 trip of 10tons sharp sand
5. 1500 liter of water

We leased the water tank at N500 per day for 3 days and bought 1500 liter of water at N2000.

Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by BITSWORKS: 11:57pm On Apr 05, 2016
Foundation work completed. We will start the backfilling immediately.

The carpentary formwork and reinforced iron work for the foundation columns is in progress.

Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by BITSWORKS: 1:28pm On Apr 08, 2016
Work has been temporarily stopped due to a dispute between the omo-onile and the client. Safety first for my team and we are waiting for the ALL CLEAR signal.

1 Like

Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by BITSWORKS: 5:49am On Apr 10, 2016
Work has resumed back on site after negotiations were concluded on issues raised.

The columns have been worked on and casted. We used left-over materials from the foundation footing and only purchased 16mm and 10mm reinforced iron with binding wire.

Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by BITSWORKS: 6:08am On Apr 10, 2016
Back-filling of the foundation pit is also in progress and for this stage we decided to apply the *principle of killing 3 birds with one stone* to achieve one of our major aim for this project, making building cost as minimal as possible without compromise on quality and building standards.

1. Make available backfilling material and cut down on cost of procurement.
2. Make available storage for water and eliminate cost on leasing a water tank.
3. Construct our septic tank and soak-away while achieving the two goals above.

It took a while to convince the client as he wasn't ready to construct the septic tank/soak-away yet based on his cashflow but after carefully analysing the pros and cons and long term benefits, he saw reason and is genuinely glad now.

So far, we have been able to fill 3 pits with just 4ft depth of excavation and we are goin down to 8ft and we haven't dug the soak-away yet.

Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by freshvine(f): 7:26am On Apr 10, 2016
Following up on this professional details
Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by olumyde5(m): 5:45pm On Apr 13, 2016
Nice job, following
Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by BITSWORKS: 5:49pm On Apr 14, 2016
Four bays have been filled so far and the soakaway digging has commenced. We estimate we will be able to fill up one more bay with the excavated sand and then we can buy filling sand for the 3 remaining bays.

Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by gateleo(m): 6:34pm On Apr 14, 2016
nice work... pls keep us updated...
Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by ola2nde(m): 6:53pm On Apr 14, 2016
Nice one
Following attentively
Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by BITSWORKS: 7:00pm On Apr 18, 2016
Blockwork, flooring and plastering for the septic tank has been completed and we can now use the SP to store water for construction purpose. The blockwork for the soakaway is also completed.

Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by BITSWORKS: 10:33pm On Apr 21, 2016
The client decided to start the perimeter fence to give more sense of belonging and added security from encroahment. So we stareted with the fence footing excavation today.

1 Share

Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by BITSWORKS: 1:54pm On Apr 27, 2016
The perimeter wall work is ongoing and we are laying just 500 blocks for now. There was a dispute over the land boundary and the surveyor made an error which resulted in having just 4feet setback at the rear instead of the 6feet earmarked.

Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by nineville(m): 11:00pm On May 13, 2016
Hi,
Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by nineville(m): 11:00pm On May 13, 2016
Hi, what is d update? nice job!
Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by msogunro: 12:21am On May 14, 2016
BITSWORKS:


It took a while to convince the client as he wasn't ready to construct the septic tank/soak-away yet based on his cashflow but after carefully analysing the pros and cons and long term benefits, he saw reason and is genuinely glad now.

So far, we have been able to fill 3 pits with just 4ft depth of excavation and we are goin down to 8ft and we haven't dug the soak-away yet.

Approximately how much was it to complete the soak-away/septic tank?
Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by BITSWORKS: 8:35am On May 14, 2016
nineville:
Hi, what is d update? nice job!

Thanks for the compliment, the client is mopping up funds for the german floor and blockwork so we are on temporary hiatus.
Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by BITSWORKS: 2:43pm On May 14, 2016
msogunro:


Approximately how much was it to complete the soak-away/septic tank?

The total cost approximately are:

9inch block - 500nos @N140 = N70,000
6inch block - 200nos @N130 = N26,000
Iron reinforcement with artisan wage = N40,000
Wood formwork with artisan wage = N20,000
Labour for digging, blockwork, flooring, plastering, casting = N90,000
*Assume sand and granite likely already available from previous work

Hope you find this useful.
Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by alfablondy1: 3:48pm On Jun 20, 2016
Op nice one
what is the cost for workmanship for the setting up of your foundation?
Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by BITSWORKS: 7:06am On Aug 20, 2016
alfablondy1:
Op nice one what is the cost for workmanship for the setting up of your foundation?
Cost for the foundation workmanship to the present stage is N120,000.
Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by DInkMan(m): 11:36pm On Aug 20, 2016
is your wages inclusive? your contact pls
Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by BITSWORKS: 8:50am On Aug 21, 2016
DInkMan:
is your wages inclusive?
your contact pls

My professional fee is not included in the labour wage. Contact details are 08188569130 (Call and Whatsapp).
Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by BITSWORKS: 5:10pm On Oct 31, 2016
We are back to site on the 31st of October 2016 after a hiatus of about 5 months.

Backfilling has been concluded and we are about to commence with the German floor and blockwork.

2 Likes

Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by Babs612000(m): 6:32am On Nov 01, 2016
BITSWORKS:
We are back to site on the 31st of October 2016 after a hiatus of about 5 months.

Backfilling has been concluded and we are about to commence with the German floor and blockwork.
. Good to be back on the site.
Please can you tell us the size of the building in feets and how many tons of filling sand did you use.
Re: DIY: Construction Of A 3-bedroom Bungalow [Ikorodu North LGA Isiwu] by jt2010: 7:00am On Nov 01, 2016
BITSWORKS, can you plz provide your contact details or email me at pscad79@gmail.com.

(1) (2) (Reply)

The Making Of "The Port Harcourt Duplex + Penthouse" / Recovery Of Premises, Landlord And Tenant Relationship / Premium & Affordable Properties In Lekki For Sale

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 28
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.