Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,150,487 members, 7,808,801 topics. Date: Thursday, 25 April 2024 at 05:03 PM

Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him (1943 Views)

Amaechi's Brother, Dede Amaechi Is Dead: Buhari Commiserates With Rotimi Amaechi / Rotimi Chibuike Amaechi Greeting His Party Leader Tinubu - Photo / 'Amaechi Is A Thief': APC Members Protest In Rivers, Urge FG To Prosecute Him (2) (3) (4)

(1) (Reply) (Go Down)

Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by 6pax: 5:05pm On May 27, 2017
lets celebrate the living legend himself honorable Rotimi chibuike Amaechi, he is 52 today. two times chairman Nig. gov forum, two times gov, two times speaker of nig. speakers, two times speaker



Early life and education
Amaechi was born 27 may 1965 in Ubima, Ikwerre Local Government Area of Rivers State to the family of late Elder Fidelis Amaechi and Mrs Mary Amaechi. His first and last names are Igbo meaning “God is strength or power” and “who knows tomorrow” respectively. He was raised in Diobu, a densely populated neighborhood in Port Harcourt, and had his early education at St Theresa's Primary School from 1970 to 1976. He earned his West African Senior School Certificate in 1982 after attending Government Secondary School Okolobiri.

Chibuike received a Bachelor of Arts degree (Honours) in English Studies and Literature from the University of Port Harcourt in 1987, where he was the President of the National Union of Rivers State Students (NURSS). He completed the mandatory National Youth Service corps in 1988. He thereafter joined the Services of Pamo Clinics and Hospitals Limited owned by Peter Odili, the former Governor of Rivers State where he worked until 1992. He is married to Judith Amaechi and they have three boys.

Early political career

Amaechi cut his early teeth in politics as Secretary of the now defunct National Republican Convention in Ikwerre Local Government Area of Rivers State. Between 1992 and 1994, he was Special Assistant to the Deputy Governor of Rivers State, Sir (Dr.) Peter Odili, and also a member of the Board of West Africa Glass Industry as well as Risonpalm Nigeria Limited. Dr. Peter Odili believed in him as a young man with potential in politics, and adopted him as a political son, guiding and nurturing him in politics, and consequently facilitating his election into the Rivers State House of Assembly in 1999.

This relationship between him and Odili translated into a harmonious relationship between the Executive and Legislative arms of government in Rivers State, until when Rotimi Amaechi launched a campaign against the State Government, and verbally attacked the image of the State Governor, in an effort to succeed Peter Odili as Governor in 2007.

He was the Rivers State's Secretary of the Democratic Party of Nigeria (DPN) caretaker committee after in 1996 during the transition programme of General Sanni Abacha junta.
Speaker (Rivers State House of Assembly) 1999-2007
Further information: 4th Rivers State House of Assembly and 5th Rivers State House of Assembly

In 1999, he contested and won a seat to become a member of the Rivers State House of Assembly to represent his constituency. He was subsequently elected as the Speaker of the House of Assembly. Amaechi was elected the Chairman of Nigeria's Conference of Speakers of State Assemblies. He was reelected into the State House of Assembly in May 2003 and was also re-elected as the Speaker. In 2003 when the National Assembly moved to hijack the legislative functions of the State house of Assembly as enshrined in the constitution, he and his colleagues took the matter to Nigeria's supreme court and the court gave a judgment that the control and supervision of local government is the prerogative of the State House of Assembly.
Governorship

He contested and won the People's Democratic Party primary for Rivers State Governor in 2007. His name was substituted by the party, an action which he challenged in court. The case eventually got to the Supreme Court.

He became Governor on October 26, 2007 after the Supreme Court ruled that he was rightful candidate of the PDP and winner of the April 2007 Governorship election in Rivers State.

He was reelected for a second term of four years in April 2011.

His administration invested in infrastructure development, construction of roads and bridges, sticking to the vision of connecting all parts of the state by road. The governor was also committed to urban renewal and modernization of transportation services. His administration began building a monorail to provide mass transportation within the city of Port Harcourt.

Some power plant projects (Afam, Trans Amadi, Onne) were also built to improve power supply in the State.

Chibuike Amaechi holds the national honour of the Commander of the Order of the Niger (CON). He is a Christian Catholic and a Knight of St. Johns.
2015 Presidential Election

Amaechi was appointed the Director-General of the All Progressives Congress 2015 Presidential Campaign.

2015-Till Date Ameachi was recently appointed the Honorable Minister for Transportation, Federal Republic of Nigeria

1 Like

Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by Scatterscatter(m): 5:07pm On May 27, 2017
Celebrate him for what Na?

5 Likes

Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by 6pax: 5:09pm On May 27, 2017
Scatterscatter:
Celebrate him for what Na?
for bringing unprecedented development to Rivers state
Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by doublewisdom: 5:09pm On May 27, 2017
Celebrate him for looting Rivers State dry? Abi for spending public resources on Wole Soyinka and his daughter? Amaechi is a scoundrel of history.

5 Likes 1 Share

Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by Lanretoye(m): 5:10pm On May 27, 2017
no budget no minister,all the ministers are just chilling.

1 Like

Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by Scatterscatter(m): 5:10pm On May 27, 2017
6pax:

for bringing unprecedented development to Rivers state

Ehn Ehn... Please elucidate
Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by Kondomatic(m): 5:11pm On May 27, 2017
6pax:
for bringing unprecedented development to Rivers state
Rivers State:

1 Like

Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by SalamRushdie: 5:17pm On May 27, 2017
He and his kids will be always be remembered as betrayers of Nigerian Christians and minorities ..Bleep ROTIMI Ameachi..He and his kids will never be forgiven for choosing greed over common interest..let him go to Kano and celebrate his birthday an Google the fool Called Joe garba

1 Like

Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by 6pax: 5:18pm On May 27, 2017
Scatterscatter:


Ehn Ehn... Please elucidate
he gave us the best public schools
best public hospitals
best road network
best agro initiatives
best security aparatus
employed over 13,000 graduates at a go
thousands of scholarship abroads
olmpics size game village
greater ph city
in fact the list is endless






www.nairaland.com/attachments/2081316_sch1_jpegc79e4f2e8ee186c02a7d9820d6623312
Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by Scatterscatter(m): 5:30pm On May 27, 2017
6pax:

he gave us the best public schools
best public hospitals
best road network
best agro initiatives
best security aparatus
employed over 13,000 graduates at a go
thousands of scholarship abroads
olmpics size game village
greater ph city
in fact the list is endless






www.nairaland.com/attachments/2081316_sch1_jpegc79e4f2e8ee186c02a7d9820d6623312

Just these in 8years? lipsrsealed
Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by 6pax: 5:32pm On May 27, 2017
the biggest sports village in Nigeria with 40,000 fifa standard capacity stadium, two Olympic standard swimming pools, volley ball court, basket ball court, etc
www.nairaland.com/attachments/3795636_113142836_jpeg994811eed529afe6d48d91425ad47d62




Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by 6pax: 5:35pm On May 27, 2017
Scatterscatter:


Just these in 8years? lipsrsealed

name any other governor that did better smiley
Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by Nobody: 5:36pm On May 27, 2017
Na only you go celebrate am.... his entire family may not be living in the state including Amaechi. lipsrsealed lipsrsealed lipsrsealed lipsrsealed
Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by yarimo(m): 5:37pm On May 27, 2017
Happy birthday to my next role model after TINUBU
Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by Scatterscatter(m): 5:38pm On May 27, 2017
6pax:


name any other governor that did better smiley

Fayose
Okorocha
Benue state governor

Just to mention a few
Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by 6pax: 5:44pm On May 27, 2017
Scatterscatter:


Fayose
Okorocha
Benue state governor

Just to mention a few
lol, grin
knew ur a jocker cheesy
Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by sekundosekundo: 5:45pm On May 27, 2017
LOOTimi Amaechi is a criminal and connot be celebrated till he returns Rivers State looted money.


The spirit of the police officer your thugs beheaded will eventually destroy you and rape your wife to death.

Judas of Ubima.

Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by 6pax: 6:06pm On May 27, 2017
constructed the longest km of roads and bridges in Rivers history with sub drainage system and pedestrian walk
Dualization of Rumuokuta-Choba East-West Road, Obi Akpor (N10.3bn, 88% completed)

Construction of Eleme junction flyover (N7.3bn, 100% completed)

Construction of Omofo-Agaba Ndele Road (N4.8bn, 90% competed)

Dredging works/Roads at Opobo New Layout (4.52bn, 100% completed)

Construction of Ozuzu to CSS Isu-Ogida Owu Egbu(N2.79bnhuge, 100% completed

Dualization of Airport-Isiokpo/Omarelu Road (N35.15bn, 98% completed)

Dualization of Ada George Phases 1 and 2/ Choba phase 2 NTA/ChobaAirport (N17.04bn, 80% completed).

Dualization of Rumuola/Rumuokuta Road and (N2.78bn, 100% completed).

Dualization of First Bank/Rumuomasi Road (N3.58bn, 100% completed)

Dualization of slaughter-Trans Amadi/Rumuobiakani Road (N6.53bn, 100% completed)

Shore protection and land reclamation of Egbomung/Oluk-Ama(N2.18bn, 90% completed)

Construction of Bridge at Bolo Creek with approaches (N4.81bn, 100% completed)

Dualization of Eneka-Igbo Etche link Road (N2.24bn, 70% completed)
Construction of Apani internal Roads (N2.57bn, 100% completed)

Construction of Nyokhana-Kenkhana Link Road with Bridge from Luuwa to Bere (N2.93bn, 40% completed)

Construction of Odiolugbani-Enito 1 and 2-Oshie Road (N4.51bn, 80% completed)

Expansion of Mbiama-Akinima Road (N1.98bn, 100% completed)

Construction of Okeh-Ihie-Apani-Omarelu Road (N6.86bn, 97% completed)

Construction of Bori internal Roads phase 3 (N1.71bn, 81% completed)

Construction of Abua/Okoba Close Rumuibekwe with extension to Elelenwo (N2.19bn, 75% completed)

Construction of Ikuru town- Atlantic Ocean Road (N2.38bn, 80% completed)

Construction of Okeh-Mba-Umuaturu-Akpoku Obite, 21km with Bridge (N5.02bn, 100%completed)

Reconstruction of Town Market (N3.52bn, 100% completed)

Dualization of Rumukrushi-Eneka-Igwuruta Road (N13.87bn, 95% completed)

Construction of Abuloma-Woji Road Bridge (N13.63bn, 50% completed)

Construction of Akpajo-Woji Road/Bridge (N11.06bn, 56% completed)

Construction of Ada George/East West Road junction flyover with Rotary turning and service lanes (N5.34bn, 80% completed)

Dualization of Elekahia-Rumuamasi Road (N6.50bn, 100% completed)

Dualization of Azikiwe Road (UTC) junction-Lagos Bus stop (N6.29bn, 89% completed)

Completion of Airport-Igwuruta-Rumuokoro Road (N1.59bn, 100% completed)
Reconstruction of Woji Road in GRA Phase 2 with drains and construction of Sani Abacha/NTANwogba Storm Water Drainage (N2.06bn, 75% completed)

Reconstruction of Ikwerre Road from Education to Agipflyover (N5.88bn, 100% completed)

Reconstruction/As[halt overlay of Igwuruta-Ohokoho-Okehi Road (N1,44bn, 100% completed)

Reconstruction of Ken Saro Wiwa Road and flood control works around Ken Saro Wiwa Road/Ezimgbu Link Road-Aba Road, Port Harcourt and construction of Relief Road linking Aba Road to Ken SaroWiwa Road at Worlu street junction (N10.85bn, 90% completed, 30% Canal)

Expansion/resurfacing of Kpopie-Bodo city Road (N3.91bn, 62% completed)

Shore/protection works at Ndoni (N2.82bn, 100% completed)

Dualization of Isiokpo-Ubima-Omarelu Road (15.34bn, 82% completed)

Construction of Okrika Ring Road (N4.02bn, 100% completed)

Construction of Unity Road, Ogoni-Andoni-Opobo Road (N31.00bn, 70% old and 30% new completed)

Expansion of Okporo Road (N2.61bn, 100% completed)

Reconstruction of Edeoha-Ikata-Ochigba Road (N2.09bn, 66% completed)

Reconstruction of Ozuoba-Ogbogoro-Rumuolumeni Road (N5.22bn, 65% completed)

Dualization of Chief G.U. Ake Road (N9.95bn, 100% completed)

Construction of Nyowii-Dae-Lueku-Bagha-Seme Lueku-scholl to land Road (N3.78bn, 60% completed)

Expansion of Amadi-Ama-Abuloma Road with Spur to Okuruama(N4.22bn, 100% completed)

Expansion of Olu Obasanjo Road to six lanes and Rehabilitation of Omoku street, Okomoko street and Okomoko street Spur (N3.07bn, 100% completed)

Design and Reconstruction of Rumuwoji (mile one) Ultra ModernMarket (N2.99bn, 100% completed)

Dualization of Epirikom-Rumuolumeni Road (N9.88bn, 57% completed)

Construction of Elioparanwo Road (N2.57bn, 65% completed)

Repair of the collapsed Airforce Base flyover Retaining walls and construction of Dual carriage access Road to the Airforce Base flyover (N2.00bn, 100% completed)

Reconstruction of Roads in D Line Port Harcourt (N7.55bn, 55% completed)

Reconstruxtin of Omuanwa-Elele Road and Elele internal Roads (N2.48bn, 100% completed)

Reconstruction of Eastern Bypass, Amadi-Ama OginigbaRoad (N2.89bn, 100% completed)

Construction of Flyover at Olu Obasanjo Eliozu junction (N1.68bn, 100% completed)

Construction of East/West Bypass and other lik Roads in Ahoada town (N1.17bn, 100% completed)

Construction of Oro Ekpo Odoli/Awabie and ChindaStreet (1.66bn, 100% completed)

Construction of Timothy Lane, Rumuola/Ohiamini Access Road PH plus Retaining wall (N1.62bn, 100% completed).

Construction of Omuanwa internal Roads (N1.50bn, 100% completed)

Construction of Rukpokwu-Eneka/Eneka Eliozu Link Roads (N1.32bn, 100% completed)

www.nairaland.com/attachments/3797406_3492941ama101jpege1faa1a15a3d68752f2d50ea8bd8811e_jpegb9d239b3628ade087f92ec67d1e3151a

www.nairaland.com/attachments/3119862_cr3w4oswiaaa13v_jpeg6923ce521c2d7aaefd31185910a06c31
www.nairaland.com/attachments/3119861_cr3lklswwaa696f_jpegfad0d191638e99e226c659b18774693e
www.nairaland.com/attachments/3119860_crr0s8twiaedia_jpegb83f5a3a3f037978f763fa16b37322e3
Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by DOUBLEWAHALA: 6:13pm On May 27, 2017
Is it wike dat did beta?

Mind u wike is doin som of dos little little effort to pave his way thru 2nd term






Wike sold monkey and bought dog

He banned timariv and introduced parking marshal
Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by ikennaoma(m): 6:38pm On May 27, 2017
Happy birthday sir
Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by 6pax: 7:12pm On May 27, 2017
lalasticlala where are thou sad
Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by luvinhubby(m): 7:25pm On May 27, 2017
6pax:
constructed the longest km of roads and bridges in Rivers history with sub drainage system and pedestrian walk
Dualization of Rumuokuta-Choba East-West Road, Obi Akpor (N10.3bn, 88% completed)

Construction of Eleme junction flyover (N7.3bn, 100% completed)

Construction of Omofo-Agaba Ndele Road (N4.8bn, 90% competed)

Dredging works/Roads at Opobo New Layout (4.52bn, 100% completed)

Construction of Ozuzu to CSS Isu-Ogida Owu Egbu(N2.79bnhuge, 100% completed

Dualization of Airport-Isiokpo/Omarelu Road (N35.15bn, 98% completed)

Dualization of Ada George Phases 1 and 2/ Choba phase 2 NTA/ChobaAirport (N17.04bn, 80% completed).

Dualization of Rumuola/Rumuokuta Road and (N2.78bn, 100% completed).

Dualization of First Bank/Rumuomasi Road (N3.58bn, 100% completed)

Dualization of slaughter-Trans Amadi/Rumuobiakani Road (N6.53bn, 100% completed)

Shore protection and land reclamation of Egbomung/Oluk-Ama(N2.18bn, 90% completed)

Construction of Bridge at Bolo Creek with approaches (N4.81bn, 100% completed)

Dualization of Eneka-Igbo Etche link Road (N2.24bn, 70% completed)
Construction of Apani internal Roads (N2.57bn, 100% completed)

Construction of Nyokhana-Kenkhana Link Road with Bridge from Luuwa to Bere (N2.93bn, 40% completed)

Construction of Odiolugbani-Enito 1 and 2-Oshie Road (N4.51bn, 80% completed)

Expansion of Mbiama-Akinima Road (N1.98bn, 100% completed)

Construction of Okeh-Ihie-Apani-Omarelu Road (N6.86bn, 97% completed)

Construction of Bori internal Roads phase 3 (N1.71bn, 81% completed)

Construction of Abua/Okoba Close Rumuibekwe with extension to Elelenwo (N2.19bn, 75% completed)

Construction of Ikuru town- Atlantic Ocean Road (N2.38bn, 80% completed)

Construction of Okeh-Mba-Umuaturu-Akpoku Obite, 21km with Bridge (N5.02bn, 100%completed)

Reconstruction of Town Market (N3.52bn, 100% completed)

Dualization of Rumukrushi-Eneka-Igwuruta Road (N13.87bn, 95% completed)

Construction of Abuloma-Woji Road Bridge (N13.63bn, 50% completed)

Construction of Akpajo-Woji Road/Bridge (N11.06bn, 56% completed)

Construction of Ada George/East West Road junction flyover with Rotary turning and service lanes (N5.34bn, 80% completed)

Dualization of Elekahia-Rumuamasi Road (N6.50bn, 100% completed)

Dualization of Azikiwe Road (UTC) junction-Lagos Bus stop (N6.29bn, 89% completed)

Completion of Airport-Igwuruta-Rumuokoro Road (N1.59bn, 100% completed)
Reconstruction of Woji Road in GRA Phase 2 with drains and construction of Sani Abacha/NTANwogba Storm Water Drainage (N2.06bn, 75% completed)

Reconstruction of Ikwerre Road from Education to Agipflyover (N5.88bn, 100% completed)

Reconstruction/As[halt overlay of Igwuruta-Ohokoho-Okehi Road (N1,44bn, 100% completed)

Reconstruction of Ken Saro Wiwa Road and flood control works around Ken Saro Wiwa Road/Ezimgbu Link Road-Aba Road, Port Harcourt and construction of Relief Road linking Aba Road to Ken SaroWiwa Road at Worlu street junction (N10.85bn, 90% completed, 30% Canal)

Expansion/resurfacing of Kpopie-Bodo city Road (N3.91bn, 62% completed)

Shore/protection works at Ndoni (N2.82bn, 100% completed)

Dualization of Isiokpo-Ubima-Omarelu Road (15.34bn, 82% completed)

Construction of Okrika Ring Road (N4.02bn, 100% completed)

Construction of Unity Road, Ogoni-Andoni-Opobo Road (N31.00bn, 70% old and 30% new completed)

Expansion of Okporo Road (N2.61bn, 100% completed)

Reconstruction of Edeoha-Ikata-Ochigba Road (N2.09bn, 66% completed)

Reconstruction of Ozuoba-Ogbogoro-Rumuolumeni Road (N5.22bn, 65% completed)

Dualization of Chief G.U. Ake Road (N9.95bn, 100% completed)

Construction of Nyowii-Dae-Lueku-Bagha-Seme Lueku-scholl to land Road (N3.78bn, 60% completed)

Expansion of Amadi-Ama-Abuloma Road with Spur to Okuruama(N4.22bn, 100% completed)

Expansion of Olu Obasanjo Road to six lanes and Rehabilitation of Omoku street, Okomoko street and Okomoko street Spur (N3.07bn, 100% completed)

Design and Reconstruction of Rumuwoji (mile one) Ultra ModernMarket (N2.99bn, 100% completed)

Dualization of Epirikom-Rumuolumeni Road (N9.88bn, 57% completed)

Construction of Elioparanwo Road (N2.57bn, 65% completed)

Repair of the collapsed Airforce Base flyover Retaining walls and construction of Dual carriage access Road to the Airforce Base flyover (N2.00bn, 100% completed)

Reconstruction of Roads in D Line Port Harcourt (N7.55bn, 55% completed)

Reconstruxtin of Omuanwa-Elele Road and Elele internal Roads (N2.48bn, 100% completed)

Reconstruction of Eastern Bypass, Amadi-Ama OginigbaRoad (N2.89bn, 100% completed)

Construction of Flyover at Olu Obasanjo Eliozu junction (N1.68bn, 100% completed)

Construction of East/West Bypass and other lik Roads in Ahoada town (N1.17bn, 100% completed)

Construction of Oro Ekpo Odoli/Awabie and ChindaStreet (1.66bn, 100% completed)

Construction of Timothy Lane, Rumuola/Ohiamini Access Road PH plus Retaining wall (N1.62bn, 100% completed).

Construction of Omuanwa internal Roads (N1.50bn, 100% completed)

Construction of Rukpokwu-Eneka/Eneka Eliozu Link Roads (N1.32bn, 100% completed)

www.nairaland.com/attachments/3797406_3492941ama101jpege1faa1a15a3d68752f2d50ea8bd8811e_jpegb9d239b3628ade087f92ec67d1e3151a

www.nairaland.com/attachments/3119862_cr3w4oswiaaa13v_jpeg6923ce521c2d7aaefd31185910a06c31
www.nairaland.com/attachments/3119861_cr3lklswwaa696f_jpegfad0d191638e99e226c659b18774693e
www.nairaland.com/attachments/3119860_crr0s8twiaedia_jpegb83f5a3a3f037978f763fa16b37322e3

In eight years, including monorail and repairing spoilt foot bridges?
Even Obiano did more in 3yrs with less resources, i am ashamed for you. angry
Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by 6pax: 7:39pm On May 27, 2017
luvinhubby:


In eight years, including monorail and repairing spoilt foot bridges?
Even Obiano did more in 3yrs with less resources, i am ashamed for you. angry
lol grin
I know u are a jocker grin
keep on jocking grin
obi kini grin
Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by DIKEnaWAR: 8:45pm On May 27, 2017
I celebrate a performer and one of the best governors Rivers state has had.
Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by gare(f): 9:10pm On May 27, 2017
Scatterscatter:


Just these in 8years? lipsrsealed

Ask them ?
Re: Rotimi Chibuike Amaechi Is 52 Today Lets Celebrate Him by Splashme: 9:50pm On May 27, 2017
Amaechi is a thief
Nobody cares

(1) (Reply)

Compulsory Voting: A Solution To IPOB Election Boycott Threat. My opinion / How Can Southern Kaduna Join Biafra? / Igbo Top Leaders Drag Arewa Youths, Northern Governments, Others To World Court

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 71
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.