Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,143,285 members, 7,780,646 topics. Date: Thursday, 28 March 2024 at 06:38 PM

Give Us Electricity, And We’ll Build Africa - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Give Us Electricity, And We’ll Build Africa (528 Views)

NBA Conference: Drag Us To Court And We’ll Expose You, Group Dares El-rufai / 24 Hours To Presidential Election: Militants: Rig Polls And We’ll Bomb Pipelines / We’ll Build N4tn Economy, Create 40m Jobs In 10 Years– Olawepo Hashim (2) (3) (4)

(1) (Reply)

Give Us Electricity, And We’ll Build Africa by MarkSole: 11:59pm On Nov 23, 2017
By Olusegun Obasanjo and Greg Mills

Give us electricity,’ said Peter Owyia, cobbler, ‘I will double my daily production.’
Peter’s calculation was common among the estimated 50,000 shoe, belt, and bag makers in Ariaria market in the city of Aba in Abia State, South-East Nigeria. With each cobbler producing an average of 50 shoes per day, it’s a hive of industrial activity in the most unlikely place. Abia’s shoes, boots and sandals are famous throughout Nigeria and, increasingly, as the French labels on some products hint, now in parts of West Africa.
Underfoot it is a sludge of mud, plastic, and goodness knows only what. The road outside is a slippery track, temporarily worsened by a current project to install a parallel concrete drain. Just inside the entrance is a man focused on fixing a large pile of paraffin cookers. To the left are food vendors. To the right is a team of women manually weaving the leather straps for sandals, the hands a blur of twists, turns and flicks.
Industry is everywhere; the industriousness impressive.
Yet, there is one thing mostly missing amidst the sights, smells and sounds of the market: The hypnotic Grrrrrr of small generators. The margin and money are so tight that the shoes are manually cut out and sewn on foot-powered treadle sewing machines.
The cost of electricity supplied by Nigeria’s grid is less than half that from generators. But the problem is there is no grid supply. A failure of the consumer to pay has undermined the production of power, the investment in the equipment and systems required and, in a vicious cycle, the supply of reliable power for which consumers are willing to pay. On paper, Nigeria should produce 7,100 megawatts, but actually, only generates 4,600 MW.
But it does not have to be like this.
A stone’s throw away from Ariaria market is the Abia power generation plant, a privately funded $500 million 141 MW facility. It’s brand, spanking new – and, so far, unused.
The power plant has its origins in a group of local entrepreneurs, led by Dr Barth Nnaji, a US university professor and, later, minister of power in Nigeria, who wanted to create a replicable model for sustainable power development in the country. Having obtained the concession for Aba from the Federal Government in 2005, the consortium built a state-of-the-art plant, rehabilitated the entire local distribution network, put up nearly 150km of overhead lines within the Aba metropolis, completed or refurbished 12 sub-stations, and constructed a 27km gas pipeline from Imo River to supply the three General Electric turbines.
Then, with just 60 days work left on the project, the local Enugu Electricity Distribution Company was handed over to another party by the Bureau of Public Enterprises without excising Aba from the sale. As Prof. Nnaji notes, “The BPE, in effect, double-sold Aba metropolis. This is in spite of the very fact that the agreement we had clearly states that whenever there is privatisation, our company has first right to purchase the facility in Aba.”
Thus, Aba now sits with a world-class electricity infrastructure which cannot be turned on to the cost of both the investors and local industry, which is bound to turn off other investors. In this way, Nigeria’s greatest high-energy development asset is also its greatest problem: Nigerians themselves.
Yet, the country’s population will more than double to 415 million in the next generation. The five states of the South-East will increase to 45 million people over this time. To create the jobs their people crave, they will need an enabling environment for business and the infrastructure to power industry and get goods to the market. The government should resolve the power impasse before it expects investors to follow.
Compare this to Costa Rica which we visited this past week with a delegation from the Brenthurst Foundation. The results of the last 30 years show that government has consistently taken a corporate view, looked after its investors, and got things done.
In 1980, Costa Rica’s exports comprised mainly coffee, fruit and beef. Today, it exports 4,300 products to 150 countries, and is home to 300 high-tech companies including Intel and Amazon. Traditional exports have fallen from two-thirds of the total 30 years ago to under 15 per cent by 2016. With just five million citizens, it has similarly revolutionised its tourism sector, with the numbers growing tenfold to three million visitors over the same period, and the average stay doubling to 12 days.
Investors speak warmly of the reasons for being in Costa Rica: the quality of the workforce, with free mandatory education since 1869; openness, with 14 free trade agreements in force to a market totalling 2.5 billion consumers; and political stability, given its 125 years of democracy. Its infrastructure is admittedly rickety in part and energy is not cheap, at US$0.17c kw/h, but like government policy, it’s wholly reliable.
The rule of law, effective government functioning and sound macro-economic fundamentals are, as they put it, “all taken as a given”. But they are bolstered by extremely focused and energetic export and trade promotion bodies, keen not just to attract investors, but on “after-care,” says a director of their investment promotion board CINDE, “given that two-thirds of investment are re-investment”.
The initial Intel investment 20 years ago, which was the catalyst for much that followed, was the result of a deliberate effort led by the president to attract the chip maker. Little wonder then that Costa Rica’s real per capita income has gone up five times in the last 35 years, to $15,000, and the country ranks #1 in Education and Health Care in Latin America, and #2 in terms of ‘Social Progress’.
The elevator pitch, insists Costa Rica’s trade minister, should be all about ‘the people’. Yet, it’s more than that. Skills may be critical but people also require a reliable facilitator in government, which Nigeria and much of Africa lacks.
A large sign above one of Ariaria market’s alleyways reads: “This is Big Line, Where God Makes People Big”. Even so, government has a critical role to play in setting a competiveness vision, and acting on its promises by delivering the policies and hardware that enable business to compete. And that starts, in Abia’s case, with turning on the electricity.
• Obasanjo, the former president of Nigeria, chairs the Brenthurst Foundation and Dr Mills is its director. They are co-authors of the recent ‘Making Africa Work: A Handbook for Economic Success’.

http://punchng.com/give-us-electricity-and-well-build-africa/
Re: Give Us Electricity, And We’ll Build Africa by MarkSole: 12:01am On Nov 24, 2017
General Obasanjo’s government had a whopping 8 years to improve power supply in Nigeria, and what we got was allegations that $16 billion(USD) spent on power projects during that period, with nothing to show for it. The House of Representatives under Rt. Hon Dimeji Bankole attempted to probe this expenditure, but the then Governor of Delta State told them, they would [url=http://www.oyibosonline.com/16bn-power-probe-reps-on-suicide-mission-%EF%BF%BD-uduaghan/]be killed for daring such an exercise[/url]. Nothing came out of that probe, in the long run.
The current Minister of Power(Babatunde Fashola) said in 2015,as Governor of Lagos State, that meeting Nigeria’s power needs, does not require rocket science. Now that he is in the driving seat, nothing has changed and the Senate is not amused.
Re: Give Us Electricity, And We’ll Build Africa by AZeD1(m): 3:57am On Nov 24, 2017
MarkSole:
General Obasanjo’s government had a whopping 8 years to improve power supply in Nigeria, and what we got was allegations that $16 billion(USD) spent on power projects during that period, with nothing to show for it. [/url].
The NIPP plants were the result of the $16 billion USD Obasanjo spent.

(1) (Reply)

Flagging Of SMSE Clinics By Osibanjo Is A Political Strategy - Osun Indigenes (p / Most Memorable Buhari Quotes Of The Year / Former Dickson’s Aide Dies In Patience Jonathan’s Hotel

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 25
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.