Premium Times Special Report On Road Projects Across Nigeria Under PMB - Politics (3) - Nairaland

Nairaland Forum / Nairaland / General / Politics / Premium Times Special Report On Road Projects Across Nigeria Under PMB (30135 Views)

Bariga Council Chairman 'alabi' Inspects Ongoing Projects Across Local Council / Governor Ambode Inspects Ongoing Projects Across The State, Promises To Deliver / Population Of Togo Equivalent Lost Their Jobs In 20 Months Under PMB- Ezekwesili (2) (3) (4)

(1) (2) (3) (Reply) (Go Down)

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Dollabiz: 3:48pm On Oct 29, 2018
smiley
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by allthingsgood: 3:48pm On Oct 29, 2018
hisexcellency34:
Which useless projects? Come and see Lagos roads in worse shape and Fashola is the Minister of Works

it is not the job of the minister to fix state roads
i believe lagos has commissioner for works

3 Likes 1 Share

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Buterflyle0: 3:51pm On Oct 29, 2018
eddiebruk:


Did you read the report ? Because from my understanding, you are contradicting yourself. Premium time has just exposed the lots of setbacks contractors are facing, but just b cause the first few paragraphs gave you chilled vibes about APC you didn’t go further. Exactly why we are we we are today. You were deceived by the first paragraph.

You are clearly having an upside down brain when you fail to understand what detailed reporting entails.

The summary is in the headline which reads and I quote

SPECIAL REPORT: Amidst inadequate funding, insecurity, Buhari administration’s road projects continue across Nigeria

1 Like 1 Share

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Nobody: 3:54pm On Oct 29, 2018
madridguy:
With time both wailers and their wadata chiefs will be shouting Sai Baba.
Why was Abuja Okene, Lagos Ibadan, Enugu Onitsha roads omitted?
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Nobody: 3:57pm On Oct 29, 2018
SageTravels:
How i wish we will just be elect our leaders base on leadership quality not by political party. Many bad leaders hid under political parties. Some support some politicians based on what they will get. Fashola wants Buhari so that power will return to SW (Obasanjo Ruled for 8 Years. Whatsup!) Okorocha wants Igbos to vote Buhari because of 2023.

Unfortunately,there are capable hands that can manage Nigeria and push us to a greater hight but becuse of their political parties, those men will remain where there are.
Not necessary because of political party. Many Nigerians are not political educated that is all
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by deomelo: 4:02pm On Oct 29, 2018
Esseite:
Don't be bamboozled by the long rubbish....

take your time to go through the article and you would find out premium times was actually exposing corruption on disbursement and no work done or partially done while ministry of works is not coming forth on the amount released for the contract.







“Today, as you can see, big trucks and cars are moving freely on the road,” he said. “You can now have a smooth ride, without many potholes,” Ayang Azom, who works for the Cross River State government as the Director-General, Border Commission, Calabar, told PREMIUM TIMES.

“Before now….” Mr Azom giggled as he began to recount his experience. “The road was really really bad. You needed to put in at least three hours if you are driving from Alesi to Ugep, a distance that is less than 1.25 km,” he said.

He said he sometimes felt discouraged but didn’t have a choice since he had to travel to his village in Ikom.

“I was spending more money on the maintenance of my car, and changing tires, and fuel. And my health too, because every time you go and come back, you would need some rest.


“To God be the glory, we thank God that the federal government has finally done something about the road,” he said.

He added, “But from Ugep to Calabar is terribly bad. So, you just come from this way happily, and after Ugep you start feeling the same problem.”


https://www.premiumtimesng.com/news/headlines/289368-special-report-amidst-inadequate-funding-buharis-road-construction-projects-across-nigeria-continue-1.html


We read and comprehend the article and even the first part where many Nigerians expressed happiness and joy about the FG not relenting despite challenges across the board.

Not releasing figures or revising cost is not corruption, lack of openness, but definitely not corruption, unless you have a different definition of corruption to share with us.

The overall narrative is the FG not abandoning ongoing projects regardless of security and other challenges, unlike the previous administration and their culture of looting, stealing and abandonment.

Maybe you need to learn how to read and comprehend.

4 Likes 1 Share

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Buterflyle0: 4:03pm On Oct 29, 2018
asuustrike1:

Why was Abuja Okene, Lagos Ibadan, Enugu Onitsha roads omitted?

This is the 2nd report. The first report is found here. I am sure you would find what you asked about there.


https://www.premiumtimesng.com/news/headlines/289368-special-report-amidst-inadequate-funding-buharis-road-construction-projects-across-nigeria-continue-1.html
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by deomelo: 4:18pm On Oct 29, 2018
Apart from fixing the road shoulders, there is still some pavement and concrete work to do, he said. The project engineer said ‘fragmented’ payment from the federal government was their major challenge, for the project.

Drivers, passengers, and people living around the communities where the road traverses expressed their excitement over its rehabilitation.

Vera Moses, a food vendor in Alesi, said she had had several terrible experiences then, at the Bakassi spot when the highway was bad.

“We dey call that place Bakassi because we been dey suffer no be small,” she said in Pidgin English.

“I have been traveling through this road, and I can tell you how horrible the journey used to be,” a journalist who was traveling from Uyo, in Akwa Ibom State, to Ikom also said.

“We appreciate Buhari’s effort for this road,” Ebri Isobo, a local food vendor at Ediba junction, Ugep, told PREMIUM TIMES. “Him try, him try,” he added affably in Pidgin English.

Mr Isobo said big trucks used to ‘spoil’ (break down) in the middle of road when the highway was bad, thereby preventing the free flow of traffic, and sometimes causing accidents.



https://www.premiumtimesng.com/news/headlines/289368-special-report-amidst-inadequate-funding-buharis-road-construction-projects-across-nigeria-continue-1.html



Nigerians are happy and excited that this FG is working and not leaving them behind, I don't mean Igbos, I mean real Nigerians.

3 Likes 1 Share

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by biztip: 4:36pm On Oct 29, 2018
Buterflyle0:


Wailing degenerate you may live in Nigeria but you must be a blind resident
u re paid to talk this. don't have ur time
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by uba1991: 4:38pm On Oct 29, 2018
Esseite:
Don't be bamboozled by the long rubbish....

take your time to go through the article and you would find out premium times was actually exposing corruption on disbursement and no work done or partially done while ministry of works is not coming forth on the amount released for the contract.


ipob looking for a way to discredit baba as usuall
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Nobody: 4:40pm On Oct 29, 2018
uba1991:
ipob looking for a way to discredit baba as usuall

Where did you see IPOB in all that up there?.... it seem thats the only four letter word you can assimilate.

1 Like

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Nobody: 4:44pm On Oct 29, 2018
all these projects executed are in the northern part of Nigeria. is he the president of North or Nigeria
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by ClassicMG(m): 4:45pm On Oct 29, 2018
princdebola201:
sai baba till 2023.
baba alimosho is lock down for you.we re waiting for election umpire to blow whitsle for campaign .we have identified the remnant pdp here they have been advised to join the sai baba moving train or they will be crushed totally.
no space for pdp in our midst
alimosho on lock down I tell you, with yayi and eyes open make opposition forget am
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by ipreach: 4:48pm On Oct 29, 2018
Which one is located in South East?
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by beegodson: 4:53pm On Oct 29, 2018
This Government is working hard; let's give the accolades to whom its due. When we see a good job done we should celebrate the good work of the Government rather than condemn.
Some Nigerians are too quick to throw shades; when you see a good job done bhy the Government we should learn to encourage and support at all times rather than cursing.. we too play a role in the growth of the country and not the government alone.

God Bless PMB
God Bless Nigeria

1 Like

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Buterflyle0: 4:54pm On Oct 29, 2018
biztip:

u re paid to talk this. don't have ur time

You are also obviously paid to discredit even the things that make you look silly.
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Buterflyle0: 4:54pm On Oct 29, 2018
Oma307:
all these projects executed are in the northern part of Nigeria. is he the president of North or Nigeria

Read the second post on this thread

1 Like 1 Share

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Buterflyle0: 4:55pm On Oct 29, 2018
ipreach:
Which one is located in South East?

Read the second post on this thread

1 Like 1 Share

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Grayxme: 5:06pm On Oct 29, 2018
Indeed facts don't lie...Kudos Mr. President for your commitment in making Nigeria of our dream a reality
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by seguntijan(m): 5:25pm On Oct 29, 2018
Not PDP; Not-NOT Atiku
It is not for nothing that I say Nigerians are as stubborn as the beans market goat (oluya bi eran iso eree).
We don't listen at all! Otherwise, why would we even be contemplating taking the country from a party (APC) that has been saddled with spending the past almost-four years in cleaning the Augean stables left by another party (PDP, that blew away 16 years), and return it to the same profligate, irresponsible PDP?
Unless we are truly suffering from collective amnesia!
Was it not yesterday that Boko Haram controlled about 13 local government areas in the northeast...flags, collecting taxes, installing chiefs, broadcasting news and all?
Was it not yesterday that the PDP government couldn't use the Eagle Square in Abuja out of fear that Boko Haram would strike there again?
Was it not yesterday that even those in Lagos lived under the palpable fear that Boko Haram was on its way to driving them into the lagoon?
Was it not yesterday that our soldiers were running out of bullets, water and food on the battlefield and dying by the dozens?
Was it not yesterday that the country was importing everything, including toothpicks...with virtually every FOREX-dependent industry folding up because PDP People were eating our FOREX?
Was it not yesterday that PDP folks were doing "round-tripping" with our oil and subsidy...collecting our crude oil, shipping it overseas for refining, diverting the refined product elsewhere, selling it and pocketing the money, then returning an empty ship to Nigeria and STILL claiming full reimbursement for the refined product that was never brought to Nigeria? (One ship was even in Argentina at the same time it was claimed to be delivering refined oil products in Nigeria!)
Wasn't it yesterday that a PDP President allowed funds (billion dollars) meant for the military to be generously spent by one Dasuki on prosecuting elections of its members?
Wasn't it yesterday that we had the likes of kleptomaniac Diezani Alison-Madueke, garrulous Femi Fani-Kayode, greedy and incompetent Stella Oduah, obese Alex Sabudu Badeh, thieving Azubuike Ihejirika and sly Sambo Dasuki butchering Nigeria to near-death?
Wasn't it yesterday that the PDP was borrowing money to pay Federal salaries even though crude oil was once sold at $140 under their 16-year lootocracy?
And wasn't it yesterday that we had VP Atiku undermining President Obasanjo and the government under which he was serving, surreptitiously recruiting PDP governors and lawmakers to antagonize and block the President and threaten him with impeachment simply because he couldn't control his vaulting ambition to rule?
Are these are where we want to return?
I can go on and on about the 16 years of PDP banditocracy and grand ineptitude. But I think you get the gist.
True, Buhari has been a disappointment in some areas. That's why some of us who campaigned hard for him in the past now criticize him. We want to make him better.
And I am all for replacing him now mainly because I think he doesn't have the energy anymore.
But I won't trade him and APC (despite their shortcomings) with Atiku and PDP. If we are crying, we don't allow ourselves to be blinded by tears.
Lailai!
Tufia!
Let Baba Obasanjo (whom I respect a lot) go and take some chill pills.
There must be consequences for ineffectual buffoonery. And it must include not returning PDP to power for a loooong time.

1 Like

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by BigBen10: 6:18pm On Oct 29, 2018
post=72507500:


Wailers will always wail, if they don't wail, they will have malaria at the end of the day, so it's understandable!

Some people ask; where are the President's achievements? Well, if they are of such mindset, unfortunately they can't be helped. We don't have the authority to mix spittle with clay, put on their eyes, and direct them to go to Siloam pool, wash, and come back seeing. Once anybody decides to be willfully blind, no matter what you push in front of his eyes, he wouldn't see. If he decides to be willfully deaf, even if there are thunder strikes by his ears, he won't hear!


GOD BLESS OUR PRESIDENT MUHAMMADU BUHARI

END OF DISCUSSION!!
See ya Nairaland!

Yep. To summarise. You can wake a man who is asleep but you cannot wake a man who is pretending to sleep.
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by BigBen10: 6:26pm On Oct 29, 2018
Buterflyle0:


I am sure you read this is the 2nd part of the report. Have you bothered to read the first part?

Wailer you can read the first part of the report here

https://www.premiumtimesng.com/news/headlines/289368-special-report-amidst-inadequate-funding-buharis-road-construction-projects-across-nigeria-continue-1.html

Create a different thread and name it part two. Let them know.
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by pieces18: 6:29pm On Oct 29, 2018
as far as im concern, whether buhari tarred road enter my bedroom, i wont tell him weldone, becus the harm weh him do to this country pass roads weh him dey patch. so daura, be ready to receive your failed son
Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by maasoap(m): 11:19pm On Oct 29, 2018
gentlegenius:

No... The APC didn't pay premium Times, but it's obvious they are paying you.
How else can one explain a sane young person spending every minute of his God forsaken life on Nairaland, trying extra hard to defend a failed government?
Come February 17th, 2019, you'll surely regret all the time and effort you are wasting here.

You should be ashamed.

They collected billions twice. In 2008 they raised 6b for the construction of the building and they looted the money.

In 2014 they raised 27b for the same building and also looted the money themselves.

The state of the building has not changed for the past 10years

Re: Premium Times Special Report On Road Projects Across Nigeria Under PMB by Konquest: 2:23am On Oct 30, 2018
Buterflyle0:
SPECIAL REPORT: Amidst inadequate funding, insecurity, Buhari administration’s road projects continue across Nigeria



[size=5pt]Ongoing road construction at Dadinkowa mayama Local govt Kebbi State[/size]

In the second and final part of this report, the state of two major roads being constructed by the Buhari administration are reviewed.
Read the first part of the report here.
Gombe-Numan Road

The Gombe-Numan federal road rehabilitation project was awarded afresh by President Muhammadu Buhari’s administration in 2016.
Nearly two years into the life of the multi-billion naira contract, Nigerians plying the road are not elated about the progress of the project.
The federal government awarded the contract for the completion of the rehabilitation of the Gombe-Numan-Yola road to Triacta Nigerian Limited and Chinese Geo-engineering Company (CGC).
While Triacta Nigeria Limited undertakes the Gombe to Kaltungo portion of the road, CGC is to rebuild the road from Kaltungo to Numan.
The phase-II of the project, located in Gombe State, is to cover the road from Gombe to Kaltungo, which covers a distance of 83km. Earlier in March, motorists plying Gombe-Numan-Yola highway were assured that the ongoing construction work on the Gombe-Kaltungo axis would be completed by June.
The Project Manager of the road, Imran Khan, told the Director Federal High Way, North-East at the Ministry of Power, Works and Housing, Rufai Mohammed, that over 45 kilometres out of the 68 kilometres from the Gombe – Kaltungo axis of the road had been completed.
From Gombe, there is a completed road portion which stretches up to Ngadao, a little village located about 30km away from Ngadao, up to the Wuro-Yola village (about 5km further).
Our reporter observed in July that fresh rehabilitation works are being undertaken, with some portion of the two sides yet to be completed. A large portion of the road, which leads to Kumo town (44km away) is, however, yet to be tarred, after the recent removal of the dilapidated tarred road.
All the reconstruction effort from Gombe axis heading to Kaltungo, stops some few kilometers from Kumo town. The rest of the road, which leads beyond Kumo town, up to about 18km away from Kaltungo, is still yet to be rehabilitated.
PREMIUM TIMES, however, observed that a completed portion of the road, about 18km, leads up to Kaltungo town.
Isa Adamu, a petty trader in Wuro-Yola village, informed PREMIUM TIMES that about 2km portion of the excavation and grading part of the road, which passes through their village (about 36km away from Gombe), was only done between the June 10 and 13.
“It was not up to a month that they moved their equipment to where it is now, not far away from our village,” he said. “I think they stopped working due to Ramadan Sallah.
“We are looking forward to having them return immediately so that they can tar the road on time, before the rains turn the graded road into (a) pool of mud and cause problems for travellers,” he said.
Saleh Abdullahi, a vulcaniser who operates along the Gombe-Yola road, said “the completed portion that stretched up to Akko local government was done long ago, but when the minister of works came to visit the road, the contractors came to do some dressing of the road, like painting the middle and so on, and left to Kaltungo area”.
Our reporter also observed the presence of road construction equipment which were parked at the spots where fresh works were being carried out. Vehicles had to dust their way through the freshly graded portion of the road which is awaiting further development.
The remaining stretch of road that goes beyond Kumo town is still dotted with large potholes.
Construction work ongoing along Gombe-Numan road at Wura-Yola village.


Auwal Suleiman, Triacta Nigeria Limited’s quality control manager for the Gombe-Yola project, said “the Gombe-Numan-Yola rehabilitation project was awarded since 2011 but there was no mobilization for contractors to commence (the) work, until 2016, when it was finally funded”.
He said the work commenced in earnest in June 2016; starting from the Gombe town to Kaltungo, in Gombe State.
“And we were able to cover 23km by December of 2016. After that, we received a signal from the federal ministry of works to go to the Kaltungo end of the project which happened to be the worst part of the project.
“And in 2017 we were able to cover about 18km from that axis. After tackling the worse aspect of the road, we now returned to the Gombe side of the project where we left off, to continue the work, with the intention of connecting it with the Kaltungo side.
About 30km long portion of the Gombe-Numan road completed by the contractors.
On the stage of the project’s completion, Mr Suleiman said “so far, about 65 per cent of the project has been completed.
“There are some sections of the road that are difficult, which we have not been able to cover, especially between Kumo and Billiri towns. Even vehicles are not moving on the road. They have to go down the shoulders and so on. We hope to cover the remaining 35 per cent part of the road by December.”
On the issue of funding, Mr Suleiman said the government has not been defaulting in payment.
A portion of the awarded Gombe-Numan road where work is yet to be commenced by the contractors.



“This government is really trying because they have not been defaulting in terms of payment. Each time we raise certificate for part completion, they pay promptly. That is why you see us working on the road.”
Traffic Challenge

The challenge being faced by Triacta Nigeria Limited, according to Mr Suleiman, is the issue of traffic on the highway.
Gombe-Yola road is one of the busiest roads in North-east Nigeria. Contractors have to constantly pay attention and make provision for easy flow of traffic while the work is still ongoing.
This slows down the work, he said.
Another major challenge for the contractors is the rainy season, he said, which also slows down the speed of the road construction – though a common phenomenon in civil engineering.
The contractors said they have engaged over 500 unskilled labourers who are mostly from Gombe, Yola, Kaltungo and other smaller villages which the road passes through.
Most of the residents have not made any major complaints on how the construction efforts has made life difficult for them because the road is an existing one. Hence no one has asked for any kind of compensation due to encroachment.
“There is enough space to work on, so there has never been any cause to pay compensation whatsoever,” said Triacta’s quality control manager.
He added that “even if there is any private structure that is close to the highway, we see it as an encroachment and the federal government has the right of way. And that happen only when we are taking the project through the town.
PREMIUM TIMES observed that there is only one bridge between Gombe and Kaltungo which is yet to be built. The management of Triacta explained that work could not start on the bridge due to some technical issues.
“There is only one bridge at kilometer -44, between Gombe and Kaltungo. It is a 90 meters long bridge. We have not commenced construction of the bridge due to some issues concerning the discrepancies in the estimation and what it would actually require to build it.
Project Manager Triacta Construction Company Mr Walid with Premium Times Correspondent at Shagari Quarry Sokoto State on Monday



“We came to realise that the expected depth written in the design is not going to be workable. The piling depth that was prescribed for the bridge was too small to carry the bridge. So we invited the foundation technician to come and carryout some investigation to know the exact depth of the piling foundation.
“We are still waiting for that to be carried out, even though we believe it is going to be more than what they are going to specify in the bill.”
The road from Gombe to Kaltungo is being built with a wearing course (which is the outlook layer) of about 4cm; with a binder course of about 10cm; then a stone base of about 20cm, and then the sub-base (laterite base) which is 15cm.
There was not much filling on the road because it is an existing road, except where the contractors say they find the road level to be low.
Meanwhile, the other portion of the Gombe – Numan road rehabilitation is being handled by a Chinese company, CGC (Chinese Geo-Engineering Company). It is a 113km road distance which has been in a very bad shape for a long time.
PREMIUM TIMES’ visit along the road noticed work being done but at a very slow pace.
None of the portion of the road which has been excavated from Cham, a village on the border of Gombe and Adamawa state in Numan Local Government Area, has been completed.
Motorists are still seen pounding their ways through thick dusts of the excavated road as they ply to and from Gombe and Yola. A small number of construction workers, seen on the road, would not speak to PREMIUM TIMES or give contact details of their employers.
The excavation and partial laying of stone asphalt did not go beyond Savanah Sugar Company which is less than 20km. All the remaining portion of the road, from Savanah Sugar Company through Lamurde, up to Kaltungo (about 95km) where Triacta Company started its construction to Gombe town, has been in very bad shape.
A motorist, Sani Buba, seen changing a burst tyre near Lamurde town, said the bad road has so much toll on their vehicles.
A portion of the awarded Gombe-Numan road where work is yet to be commenced by the contractors.

“We have never seen such kind of road contract in this country,” he said.
“Unlike what we have in the ahead in Kaltungo up to Gombe, these contractors are just punishing us here, especially in the area that they have graded”.
Efforts to get the management of CGC to comment on why the project was being executed at a very slow pace were unsuccessful.
Sokoto –Tambuwal-Jega Road project

The Sokoto-Tambuwal Jega- Birnin Yauri road transverses Sokoto and Kebbi states.
The project was awarded by the Goodluck Jonathan administration in December 2014. Its cost was increased from N10.6 billion to N30.5 billion then. The project was to have been completed in 36 months, which means it should have been completed in 2017.
“The rehabilitation of Sokoto-Tambuwal-Jega-Birni Yauri Road: Jega-Birni Yauri (186km) in Kebbi State was awarded in favour of Messrs Triacta Nigeria Limited in the sum of N19.8bn, thereby revising the contract sum from N10.5bn to N30.4bn with a completion period of 36 months,” the then information minister, Nurudeen Mohammed, said.
However, inadequate release of funds, insecurity and slow disbursement of funds are however delaying the ongoing construction of Sokoto-Tambuwal-Jega road project, according to the project manager, Triacta Construction Company, Walid Aboujaoudi.

Like for other road projects covered in this investigation, the works ministry refused to provide details of released funds.
Slow disbursement of cash

“Part of our challenges is slow disbursement of cash,” Mr Aboujaoudi said.
“If the government is willing, we could have finished phase one and two of the projects but the little payment installment is holding the project back.
“The project from Sokoto, Jega and Yawuri is 311 kilometre by length. One bypass at Tambuwal is eight kilometre. Now 180 kilometre is completed. Put together, the phase one and two of the project is at 65 per cent completion stage.
“The completion period depends on how much the government budgeted for the project in a year. If the government can put a budget of N7 billion in a year, we can finish the project in less than two years. But they budgeted only N2 billion. That’s what makes the project to be uncompleted.
Ongoing road construction at Tambuwal Sokoto State

“If the government can’t increase the budget for the project, it will take several years before completion.
“The more they increase the budget, the more we move fast and our rate is five-year-old. Prices of diesel, gadgets, cement are going up. It’s better for us to finish quickly because of the increasing rate.”
Insecurity

Mr Aboujaoudi explained further that the issue of security is a major concern, as there are issues with workers’ safety.
“They are kidnapping us. They came here to the quarry in the month of Ramadan. They killed three police officers on guard and kidnapped our colleague.”
When asked how much ransom they paid before their colleagues were released, he said he was not part of the negotiation because they did everything from Abuja before the staff was released.
He said, “Because of the security situation, we are scared of staying longer in the site. We are forced to leave site early in the day because of the fear of the unknown.
“The host communities do complain about the slow movement of the project. We tried to explain to them our willingness to complete the project on time but the slow disbursement of funds and even the budget, is delaying the project.”

On the project impact on the host community, he said over three hundred locals were employed.
“We have three quarries. One in Zamfara, one at Sokoto and also in Kebbi State. We employed over three hundred locals in the host community.”
The village head of Marake in Shagari Local Government Area of Sokoto, Abubakar Magaji, commended the federal government over the ongoing road project.
Mr Magaji called on the construction company to provide speed breaks in specific locations because of the high speed with which motorists now ply the highway.
“We have little kids and our livestock are moving around. Only the speed breaker can notify some drivers to understand that they are approaching a village,” Mr Magaji said.
For three months, efforts to get the details of the money disbursed to the contractors have been unsuccessful.
When PREMIUM TIMES contacted Hakeem Bello, spokesperson to the Minister of Power, Works and Housing, Babatunde Fashola, in July, he promised to get back to our reporters on details of the payments made to the affected contractors.
But several weeks after our reporter sent the questions and followed up with reminders, he did not respond.

This article is a product of a partnership between PREMIUM TIMES and #Buharimeter to fact-check the state of major roads being constructed by the Buhari administration.
Buharimeter is an initiative of the Centre for Democracy and Development (CDD) with support from the Open Society Initiative for West Africa (OSIWA) and the Department for International Department (DFID)


https://www.premiumtimesng.com/news/headlines/292745-special-report-amidst-inadequate-funding-insecurity-buhari-administrations-road-projects-continue-across-nigeria-2.html


^^^^^
Great!

(1) (2) (3) (Reply)

Festus Keyamo: I Can Drive From Abuja To Kaduna Without Security / Chief Of Army Staff, Buratai Visits President Buhari (Photo) / Lalong: I Won’t Relent Until The Last Almajiri Is Relocated From Plateau

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 85
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.