Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,150,296 members, 7,808,007 topics. Date: Thursday, 25 April 2024 at 02:34 AM

Gov.udom Release 3.5yrsReport Card On Projects Ongoing And Completed In All LGAs - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Gov.udom Release 3.5yrsReport Card On Projects Ongoing And Completed In All LGAs (1505 Views)

Reno Posts Pictures Of Schools Initiated And Completed By Tinubu / Okada Ban: Lagos Stakeholders Settle For Overall Enforcement In All LGAs / 69 FG’s Projects Ongoing In South-East - Lai Muhammed (2) (3) (4)

(1) (Reply) (Go Down)

Gov.udom Release 3.5yrsReport Card On Projects Ongoing And Completed In All LGAs by Atouke: 3:19am On Jan 05, 2019
The administration of Governor Udom Emmanuel in Akwa Ibom State records unprecedented accomplishments across all sectors of the economy.
PROJECTS IN UYO SENATORIAL DISTRICT


Project Details


PROJECTS IN UYO SENATORIAL DISTRICT

(Uyo/Ibesikpo Asutan/Uruan/ Nsit Atai Federal Constituency)

UYO LGA

1. Construction of Dr. Ann Ward Gynecology block at St. Luke’s Hospital, Anua, Uyo.

2. Rehabilitation of administrative block and wards at St. Luke’s Hospital, Anua, Uyo.

3. 2 x 5 MVA, 33/11 KV injection substation, Edet Akpan Avenue, Uyo.

4. Completion of the State Secretariat Annex

5. Flood control at Nsikak Eduok Avenue, Uyo

6. 21 Storey modern Office Complex loading…

7. Intervention in Gully erosion. intervention; Etim Umana, St. Luke’s Hospital Gully Erosion sites in collaboration with World Bank Assisted Nigeria Erosion and Watershed Management Project (NEWMAP)

8. Face lift of the Idongesit Nkanga Secretariat Complex, with tarred roads and paved walk ways from the Civil Service Auditorium to Block 5 and adjoining car parks.

9. Ongoing construction of high-rise and investment buildings at the central business district of the Uyo metropolis.

10. Ongoing construction of 8,500 capacity International Worship Centre.

11. Dualization of 25.0km Uyo – Ikot Ekpene Road.

12. Dualization of 20.0km Uyo – Etinan Road (Ikot Oku Ikono)

13. Dualization of the 14.5km Uyo/Airport Junction – Okopedi Okobo Road, Phase I

14. Dualization of 9.5km Ring Road III in Aka Nung Udoe Road

15. Construction of 2.1km Road around State Secretariat Annex and Believers Assembly, Mbiabong Etoi, Uyo

16. Construction of 1.5km Nsikak Eduok - Tropicana Outfall Drain

17. Construction of 1.05km Information Drive, Uyo

18. Construction of the 6.1 km Atan Offot Road in Uyo

19. Construction of 19.317km Anua – Mbak – Ishiet Road

20. Construction of 5.1km Ewet Housing Extension

21. Remodeling/Rehabilitation of Selected Roads, Strategic Junctions & Roundabouts In Uyo Metropolis, Phase I

22. Construction of 1.3km Ntiedo Udosen Street

23. Construction of Ikot Akpan Abia - Oboyo Ikot Ita - Enen Nsit Road

24. Citrus & Pineapple hybrid plantation, Uyo Village Road

25. Construction of Akparen Street

26. Construction of Ibiono Lane

27. Construction of Etoi Street

28. Construction of Udotung Ubo Lane

29. Construction of Afaha Etok Ibesikpo

30. Construction of Vision Close, Nsukara

31. Construction of Akpasak Extension

32. Construction of Kastrophy Hotel Road Off D Line, Ewet Housing

33. Construction of Graceland School Road, Shelter Afrique

34. Construction of Aka Community School Road with Spur to Aka/road by ‘C’ Division Police Station

35. Construction of Akpa Ube Close by IBB Opposite Ibom Hall

36. Construction of Akpa Ube Crescent by AKEES Office Opposite Ibom Hall

37. Proposed Completion of Nung Ette – Shelter Afrique Dual Carriage

38. Construction of Access Road to Atlantic FM and its Environs

39. Construction of All Grace School Road and Prof. Offiong Street, Shelter Afrique

40. Construction of Youth Avenue (Winners Chapel Mbiabong Road) in Uyo

41. Emergency Completion of Ediye Street by 4Lane, Ewet Housing Estate

42. Emergency Completion of Stallion Hotel Road Linking G-Line, Ewet Housing Estate, Uyo

43. Emergency Completion of Akpan Andem Street, immediately after 4Lane traffic light, Itiam/Ewet Housing, Uyo

44. Emergency Completion of Akpan Andem Street, immediately after 4-Lane traffic light, Itiam/Ewet Housing, Uyo

45. Construction of Ukim Close off D-Line, Ewet Housing Estate.

46. Construction of Akpasak Est. Access Road Inter-ministerial Projects:

47. Renovation of 7 Classroom Block at P/S Ikot Ntuen Oku

48. Renovation of Library Block at Vocation Sch. Ikot Ntuen Oku

49. Electrification at Atai Obio Offot

50. Electrification at Nung Ukim Ikono

51. Renovation of 3 Classroom Block at P/S Ikot Ntuen Oku

52. Renovation of 2Hall/ Classroom at CCSS, Four Towns

53. Construction of 3Classroom at CCSS, Four Towns

54. Renovation of a long Hall at Group Sch. Ikot Odung/ Ikot Obio Mkpong

55. Construction of Civic Centre at Atan Offot 56. Electrification at Ifa Ikot Idang

IBESIKPO ASUTAN LGA

1. Dualization of 9.5km Ring Road III in Aka Nung Udoe Road

2. Construction of Ikot Akpan Abia - Oboyo Ikot Ita - Enen Nsit Road

3. Construction of Afaha Atai Village Crescent

4. Construction of Afaha Ikot Obio Nkan

5. Construction of 1.0km Redeem Church Road, Afaha Etok, Ibesikpo LGA

6. Cassava Processing Factories located at Nung Udoe, Ibesikpo Asutan Inter-ministerial Projects:

7. Production of 1000No Dual Desk

8. Renovation of 4 Classroom Block at Luth. Ps Nung Udoe

9. Construction of Exams hall at Sec. Comm. Sch. Iwaia Ikot Akpaedung

10. Renovation of Classroom Block at Govt. P/S, Aba Ukpo

11. Renovation of 4Classroom at St Bridget PS, Nung Ette

12. Renovation of 3Classroom at St Bridget PS, Nung Ette

13. Renovation of 4Classroom at Govt P/S, Akpa Utong

14. Provision of Solar Powered Borehole

15. Construction of Civic Centre at Mbikpong Ikot Edim

16. Completion of OPD at PHC, Nung Udoe

URUAN LGA

1. Construction of 19.317km Anua – Mbak – Ishiet Road

2. Construction of 8.5km Nduetong Oku Ibiaku Uruan – Ekritam Road & Spur in Itu/Uruan LGAs under the Alternative Project Funding Approach (APFA)

3. Construction of 9.0km Mbiaya Uruan - Ita – Ikpa – Mbiakong Uruan road with 60m Span Bridge in Uruan Local Government through Alternative Project Funding Approach (APFA)

4.Construction of 4.0km Mbiatok Ekritam - Mbiaya Uruan Road with Spur

5.Renovation of Ituk Mbang General Hospital

6. Vegetable Green House

7. Akwa Prime Hatchery

8. Cattle ranch loading… Inter-ministerial Projects:

9. Construction of Assembly Hall at Methodist P/S Adadia

10. Construction of 4 Classroom Block at Methodist P/S Adadia

11. Construction of 3 Classroom Block at Ekpene Ibia

12. Renovation of 4 Classroom Block at Ekpene Ibia

13. Renovation of Assembly Hall at AME Zion School Ndon Ebom 16. Renovation of 3Classroom at AME Zion School Ndon Ebom

14. Renovation of Civic Centre at Ekim Enen

15. Renovation of 4 Classroom Block at Ikpa uruan

16. Electrification at Ikot Inyang Esuk

17. Supply of 220No CBT Desk

NSIT ATAI LGA

1. Construction of 6.0km Idiaba – Nda Nsit - Ikot Abasi (Nung Udoe) Road in Nsit Atai Inter-ministerial Projects:

2. Renovation of 4 Classroom Block at P/S Essien Itiaba/ Ikot Asua

3. Renovation/ Extension of Assembly Hall at Sec. Sch. Ikot Akpan Ike

4. Construction of 3 Classroom Block at Comm. Sec. Sch. Ikot Asua

5. Renovation of 4Classroom at QIC P/S, Ikot Ekpot

6. Renovation of 3Classroom at CPS, Ikot Akpan Ike

7. Production of Dual Desk 1000

8. Water and Sanitation facility Projects at Ibakang, Odot 11, Nda Nsit, Ikot Akpanike, Ikot Itie Udung communities in collaboration with EU



Airport Projects: (Uruan , Nsit Atai)

1. Construction of 2nd airport Runway

2. Upgrade of Airport main runway to category 2

3. Construction of Ibom International Airport 2x15 MVA Injection Substation.

(Itu/Ibiono Ibom Federal Constituency)

ITU LGA

1. Dualization of 25.0km Uyo – Ikot Ekpene Road.

2. Construction of 8.5km Nduetong Oku Ibiaku Uruan – Ekritam Road & Spur

3.Itu/Uruan Construction of 4.0km Mbiatok Ekritam - Mbiaya Uruan Road with Spur

4. Erosion Intervention Ekim Itam along Calabar Itu highway

5. West Itam Sports Complex

Inter-ministerial Projects:

6. Completion of Hall at West Itam Sec. Sch.

7. Renovation of 2No Classroom Block at P/S Ekitam 1

8. Electrification at Ikot Ekang

9. Supply of 220No CBT Desk

10. Renovation of 2No 6Classroom Block at West Itam Secondary School

11. Renovation of 4No 5Classroom Block/ Office at West Itam Secondary School

12. Renovation of 4No 4Classroom Block at West Itam Secondary School

13. Renovation of 3Classroom Block/Office at West Itam Secondary School

14. Completion of Fence at PHC West Itam

15. Construction of Emergency Unit at PHC West Itam

16. Renovation of Library/Workshop/Classroom Block at Comm Sec Sch, Ibiaku

IBIONO IBOM LGA

1. Dualization of 25.0km Uyo – Ikot Ekpene Road.

2. Construction of 3.5km Ikot Udom Road with 15m Span Bridge in Ibiono Ibom LGA

3. Take-over of Union Secondary School, Ibiaku

Inter-ministerial Projects:

4. Renovation of 4No Block at General Hospital, Use Abat

5. Renovation of 4Classroom/ Hall at HTS, Ikot Akpabio

6.Renovation of Hall/Office at HTS, Ikot Akpabio

7.Renovation of 3Classroom at St Paul CS, Nkwa Ibiono

8.Renovation / extension of 3 to 5 Classroom Block at Presbyterian Primary Sch, Ikot Ekpe

9. Renovation/ extension of 3 to 5 Classroom Block at Presbyterian Primary Sch, Ikot Esuk

10. Production of 500No Dual Desk

(Etinan/Nsit Ibom/Nsit Ubium Federal Constituency)

ETINAN

1. Dualization of 29.0km Etinan – Ndon Eyo Road with 2No Cable Bridge

2. Dualization of 20.0km Uyo – Etinan Road (Ikot Oku Ikono)

3. Resuscitation of Peacock Paint Industry Reconstruction and equipping of General Hospital, Etinan

4.Pencils and Toothpick Factory Km2, Uyo-Etinan Road, Ekom Iman, Etinan.

Inter-ministerial Projects:

5. Renovation of 2No Block at Etinan Institute

6. Renovation of Block 4 at Salvation Army Sec. Sch. Efa

7. Renovation of Admin Block at General Hospital, Etinan

8. Reconstruction of Ass Hall at ACCS, Iwoetor

9. Renovation of 4Classroom at Salvation Army P/S, Ekom Iman

10. Construction of Classroom at CSS, Asuna

11. Renovation of 6Classroom Block at Salvation Army Sec. School, Efa

12. Renovation of 3Clrm Block at Salvation Army Sec. School, Efa

13. Renovation of Prin Quarters at Salvation Army Sec. School, Efa

14. Renovation of Staff Quarters at Salvation Army Sec. School, Efa

15. Construction of Gatehouse/Sec. at Salvation Army Sec. School, Efa

16. Renovation of Admin Block at Salvation Army Sec. School, Efa

17. Renovation of Assembly Hall at St. Theresa Edem Ekpat

18. Renovation of 4 Classroom Block at Govt School Ikot Eboh

19. Renovation of 6 Classroom Block at Ikot Nte

20. Production of 500No Dual Desk

NSIT IBOM

1. Construction of Ikot Akpan Abia - Oboyo Ikot Ita - Enen Nsit Road

2. College of Education Road Network Inter-ministerial Projects:

3. Renovation of 4 Classroom Block at Comp. Sec Sch, Obotim

4. Renovation of 4 Classroom Block at Apostolic Church Sec Sch, Ikot Oku Nsit

5. Renovation of Laboratory at Apostolic. Church Sec Sch, Ikot Oku Nsit

6. Renovation of 4 Classroom Block at Nsit People Grammar Sch

7. Construction 2No 3 Classroom at Sec Sch. Edebom I

8. Completion of Civic Centre at Mbiokporo II

9. Renovation of Civic Centre at Ikot Offong Nsit

10. Renovation of Classroom Block/office at Sec Sch Mbiokporo II

11. Supply of 220No Desk

NSIT UBIUM

1. Construction of 9.76km Ancillary Roads in Nsit Ubium LGA

2. Construction of Ukat Aran-Obio Ubium - Ikot Ubo Road under APFA

3. Rice Farm/Mill, Nung Obong-Ubium

4. Cassava Plantation, Ikot Eyo

Inter-ministerial Projects:

5. Construction of 4 Classroom Block at P/S Ikot Akpafuk

6. Renovation of 3Classroom at Ikot Imo/ Ikot Edikpe

7. Reconstruction of Assembly Hall at Govt Sch. Ikot Eyo

8. Renovation of 10No. Market Stalls at Ndukpoise

9. Provision of Solar Powered Borehole at Ikot Asang

10.Provision of Solar Powered Borehole at Obio Ekid

11.Production of 1000No. Dual Desk
Re: Gov.udom Release 3.5yrsReport Card On Projects Ongoing And Completed In All LGAs by Atouke: 3:23am On Jan 05, 2019
The administration of Governor Udom Emmanuel in Akwa Ibom State records unprecedented accomplishments across all sectors of the economy.
PROJECTS IN EKET SENATORIAL DISTRICT
Home


Project Details

PROJECTS IN EKET SENATORIAL DISTRICT
PROJECTS IN EKET SENATORIAL DISTRICT

(Eket, Onna, Ibeno, Esit Eket Federal constituency)

EKET

1. Construction/Remodeling of Selected Roads, Strategic Roundabouts/Junctions in Eket Metropolis (Phases 1 & II). (1.6km Dualized & 2.2km expanded Carriageway (10m)

2. Dualization of the 19.5km Eket – Ibeno Road

3. Dualization of 23.4km Eket – Etinan Road with 3Nos Bridges

4. Construction of 3.0km Osiok Iko Eket

5. Construction of 2.7km Ikot Abasi Road in Eket Local Government

6. Renovation of Secondary School Blocks/Fence at Ikot Akpan Ishiet

7. Construction of 2.7km Ikot Abasi Road in Eket Local Government

8. IKot Udota – Ikot Afaha Road (2.0km)

9. Nim Nnong Road (1.6km)

10. Ikot Ibiok – Ikot Udota Raod (0.9km)

11. Etebi Ikot Udota - Ikot Abasi

12. Ikot Udota Etebi Road (0.46km

13. Construction of 2.08km Assam Crescent in Ede Urua, Eket Local Government

14. Construction of Proposed 55.1km Ibaka Super Highway with 3No Spurs, Akwa Ibom State under the Alternative Project Funding Approach (APFA)

15. Reconstruction of Eket Stadium

Inter-ministerial Projects

16. Renovation of 2 No. Hostel/Classroom block (storey Buliding) at Government Secondary School Afaha Eket

17. Renovation of 2 No. Classroom Block at QIC School Ikot Udofa

18. Renovation 4 Classroom Block at Government Primary School Mkok

19. Renovation of 5 No. Classroom Block/Toilet at AME Zion Primary School Usung Inyang

20. Construction of Civic centre & Skill acquisition centre at Idua, Eket

21. Solar Power at Idua, Eket 22. Cassava Processing Factories located at Ikot Okudom, Eket LGA

ONNA

1. Construction of 15.1km Ndon Eyo – Ikot Akpatek – Odio Road

2. Construction of 13.5km Ikot Ebiere – Ikot Edor – Ikot Iko Ibon – Okom Road and Ukpana – Akpabom – Ikwe Road in Onna and Mkpat Enin LGAs

3. Construction of 12.742 km Awa Iman – Asong – Ikot Edim – Ikot Emem road with 2No Bridges in Onna and Mkpat Enin L G As

4. Construction of 10.8km Awa – Nkana Road and 2.3km Ancillary Roads in Awa Village in Onna Local Government Area

5. Construction of 5.0km Mkpok Okat Road

6. Construction of 9.5km Ikot Ebekpo – Ikot Ebidang road with 1No Jetty

7. Dualization of 29.0km Etinan – Ndon Eyo Road with 2No Cable Bridges

8. Construction of 15.1km Ndon Eyo – Ikot Akpatek – Odio Road

9. Syringe Manufacturing Factory (Largest in Africa)

10. Electric Digital Metering Solutions Manufacturing Factory

12. Flour Mills loading…

Inter-ministerial Projects

13. Renovation of 4 No. Classroom Block/Toilet at Primary School Atimkpat

14. Renovation of Classroom Block at Primary School Nung Uko Ekanem

15. Construction of fence/Gate House at QIC Primary School Awa

16. Solar powered Borehole at Ndon Eyo

17. Town Hall at Ikot Udo Essang

18. Solar powered Borehole at Ikot Udo Essang

19. Production of 220No. Dual Desk

IBENO

1. Dualization of the 19.5km Eket – Ibeno Road

2. Construction of Proposed 55.1km Ibaka Super Highway with 3No Spurs, Akwa Ibom State under the Alternative Project Funding Approach (APFA)

Inter-ministerial Projects

3. Renovation 3 classroom Block at Comprehensive High School, Inue Eyet Ikot

4.Renovation of Headmaster Quarters at Primary School Okorutip

5. Renovation of Physic/Chemistry Lab at Secondary Grammar School

6.Renovation of 3 Classroom Block at Primary School Opolum

7. Renovation of Assembly Hall/office at Government Primary School, Mkpanak

8. Renovation of Hostel Block at Secondary Grammar School Ukpenkang

9. Production of 1000No Dual Desk

ESIT EKET

1. Construction of 13.13km Akpambiet Edo – Edida Edo – Ebeekpe road, Ndon Edim – Idung Akpantuen road with Spurs and Rehabilitation of 1.7km Uquo Isi Edoho – Edo

road, in Esit Eket LGA

2. Construction of Proposed 55.1km Ibaka Super Highway with 3No Spurs, Akwa Ibom State under the Alternative Project Funding Approach (APFA)

3. Construction of 19.0km Etebi – Enwang Road Project with 2No. Bridges

Inter-ministerial Projects

4. Renovation 3 classroom Block at Methodist group school Etibi Esit Eket

5. Renovation 6 classroom Block at St Theresa Primary School Ntak Inyang

6. Renovation 6 classroom Block at Primary School Odoro Nkit

7. Construction of civic centre at Idung Atang Edem

8. Construction of Civic Centre at Ebighi Anwa Uquo

9. Solar Powered Borehole at Ebighi Anwa Uquo

10. Production of 220No Dual Desk

(Ikot Abasi, Mkpat Enin, Eastern Obolo Fed. Constituency)

IKOT ABASI

1. Cocoanut plantation/Refinery

2. Secured license for generation of 685megawatt at Ibom Power Plant

Inter-ministerial Projects

3. Renovation of 3 Classroom Blocks at Holy Child Convert School Essene

4. Renovation of 3 Classroom Block/Office at St. George Anglican Primary School, Ikot Abasi Urban

5. Renovation of 3 Classroom Block / Office at Primary School Atabrikang

6. Renovation of 10 Hospital Blocks at General Hospital Ikot Abasi

7. Renovated/Reconstructed Classroom at Saint Nicholas Primary School, Ikot Ekara

8. Production of 500No Dual Desk

MKPAT ENIN

1.Construction of 5.0km Ikot Usop – Ikot Edeghe – Ikot Ekpuk road with a 30m Span Bridge in Mkpat Enin

2.Construction of Temporary Access to AKSU Campus, Ikot Akpaden, Mkpat Enin

3. Construction of 13.5km Ikot Ebiere – Ikot Edor – Ikot Iko Ibon – Okom Road and Ukpana – Akpabom – Ikwe Road in Onna and Mkpat Enin LGAs

4. Construction of 12.742 km Awa Iman – Asong – Ikot Edim – Ikot Emem road with 2No Bridges in Onna and Mkpat Enin Local Government Areas

5. Cocoanut Plantation/Refinery

6. Excellence Comprehensive Sec. Sch. Ikot Uya

Inter-ministerial Projects

7. Renovation of 7 Classroom Blocks at Estang Secondary School Ekim

8. Renovation of 4 Classroom Blocks at Primary School Ikot Eyiene Mkpat Enin

9. Renovation of Hospital Block at Cottage Hospital Ikot Ekpaw

10. Solar Powered Borehole at Ikpa Ikono Ikot Ekpaw

11. Renovation of 4 Classroom Block at Saint John Primary School, Asong

12. Unity Hall at Ikpa Ibom, Ukam

13. Solar Powered Borehole at Ikpa Ibom, Ukam

14. Power sub-stations, Ekim

15. Production of 500No Dual Desk

EASTERN OBOLO

1. Cocoanut Plantation/ Refinery

2. Migrant Sch., Emeruke

Inter-ministerial Projects

3. Renovation of 3 Classroom Blocks at Primary School Emeroke

4. Construction of 3 Classroom Blocks / Assembly Hall at Primary School Ikoro Inyang

5. Renovation of Classroom Block / Hall / Office at St. Silas Anglican School, Okoro

6. Production of 720No Dual Desk



(Oron, Okobo, Mbo, Urue Offong/Oruko, Udung Uko)

ORON 1.

Dualization of the 13.5km

2. Okopedi – Oron Road by East-West Road Phase II 2. Emergency Works in the Completion of Oron Urban Road (6.3km) (Additional Works)

3. Construction of Gully Erosion Control Facilities at Oron/Isangedighi Road, Oron Urban

Inter-ministerial Projects

4. Renovation 4 classroom Block at General Hospital, Iquita

5. Renovation 3 classroom Block at HCCS

6. Renovation 4 classroom Block at Primary School Oyoku Asang

7.Production of 500No Dual Desk

OKOBO

1. Dualization of the 14.5km Uyo/Airport Junction – Okopedi Okobo Road, Phase I

2. Emergency Rehabilitation of Okopedi Road by Community Health Centre through Oti – Oron in Okobo Local Government Area

3. Take over of Community Comprehensive Sec. Sch., Ekeya

4. Airport Projects: a. Construction of 2nd airport Runway b. Upgrade of Airport main runway to category 2 c. Construction of Ibom International Airport 2x15 MVA Injection Substation

Inter-ministerial Projects

4. Renovation 4 classroom Block at Community Secondary school Odobo

5. Renovation of 2 No. Block at General Hospital Amanong

6. Solar Powered Water at Primary School Udung Affiang

7. Renovation of 3 Classroom Block/office at Primary School Udung Affiang

8. Renovation of 3 Classroom Block/office at Government School Ekaya

9. Reconstruction of 3 Classroom block/office at Primary School Ebighi Etta /

Edu

10. Construction of 3 Classroom block/office at St. Andrew’s Primary School OtiOro

11. Production of 220No. Dual Desk

MBO

1. Construction of Proposed 55.1km Ibaka Super Highway with 3No Spurs, Akwa Ibom State under the Alternative Project Funding Approach (APFA)

2. Construction of 19.0km Etebi – Enwang Road Project with 2No. Bridges

3. Construction of 3.2km Road at Ibaka Leading to Delmar Petroleum Harbour and Tank Farm

Inter-ministerial Projects

4. Renovation of 4 Classroom Block at St. Paul African primary school Ibaka

5. Renovation/construction of 2 No. 3 classroom Block/office at Primary School Uko Itak Eyulor

6. Electrification at Itak Eyulor

7. Renovation 5 Classroom Block/office at Community Secondary Sch.Udesi

8. Construction of Assembly Hall/2 No. Classroom Block at Primary School Oduo Ebughu

9. Renovation 4 Classroom Block at Enwang Comp. Secondary school

10. Renovation 4 Classroom Block at St. Michael Catholic School Eyonsek

11. Construction of 3 Classroom Block at Government School Eyo Uwe

12. Renovation of Assembly Hall at CSS, Edikor

13. Ibom Deep Seaport loading…

14. Production of 220No Dual Desk

UDUNG UKO

1. Construction of 9.0km Secretariat – Ulliong Edikor – Udueta Road with Spur in Udung Uko through Alternative Project Funding Approach

Inter-ministerial Projects

2. Renovation 4 classroom at St. Michael Catholic School, Eyonsek

3. Construction of 3 Classroom Block/ Assembly Hall at Govt. School, Eyo Uwe

4. Renovation 3 classroom Block/office at St. Vincent Primary School Edikor, Udung Uko

5. Production of 1000No Dual Desk



URUE OFFONG/ORUKO

Inter-ministerial Projects

1. Construction/renovation of 3 No classroom Block at Government Primary School Uyoku Ibighi

2. Electrification at Mbukpo Eyoima

3. Town Hall/Solar Powered Borehole at Edok Oruko

4. Renovation 4 classroom Block at Primary School Eyulor

5. Renovation 3 classroom Block at Government Primary School Mbukpo Eyo Akan, Urueoffong Oruko

6. Production of 220No Dual Desk
Re: Gov.udom Release 3.5yrsReport Card On Projects Ongoing And Completed In All LGAs by Atouke: 3:25am On Jan 05, 2019
PROJECTS IN IKOT EKPENE SENATORIAL DISTRICT

(Ikot Ekpene, Essien Udim, Obot Akara Fed. Constituency)

IKOT EKPENE

1. Dualization of 25.0km Uyo – Ikot Ekpene Road.

2. Construction of 4.2km Abak Ifia – Ikpe Mbak Eyop – Ikot Abia Osom – Nko Road and Spurs in Ikot Ekpene and Obot Akara Local Government Areas.

3. Take-over of Technical College, Ikot Udoe, Ikot Ekpene

4. Take-over of Community Secondary School, Urua Obo/Ikot Ata-Usung/Ikot Obong Odoro, Ikot Ekpene

5. Construction of Emergency Operation Centre at Infectious Disease hospital, Ikot Ekpene

Inter-ministerial Projects

6. Electricity at Essien Road, Ikot Ekpene

7. Renovation of Exam Hall at Goretti Juniorate

8. Renovation/Reconstruction of 2 No. 3 Classroom Block / Office at P/S, Esa Atan, Ikot Ekpene

9. VIP Toilet/Borehole at Ikono Park, Ikot Ekpene

10. Production of 500No Dual Desk

ESSIEN UDIM

1. Dualization of 25.0km Uyo – Ikot Ekpene Road.

2. 2Ton/Hour palm kernel cracker in collaboration with CFC/UNIDO/FGN

Inter-ministerial Projects

3. Reconstruction of Admin / Library / 4 Classroom Block at Government Secondary School, Nto Nsek

4. Renovation of 4 Classroom Block at P/S, Afaha Ikot Ebak

5. Construction of Classroom Block at P/S Okop Akama, Ukana Nuk

6. Renovation of 4 Classroom Block at P/S Ukana

7. Renovation of 2 Classroom/ Hall at P/S Ikot Esse

8. Renovation of 3No Block at General Hospital Ikpe Annang

9. Production of 220No Dual Desk

OBOT AKARA

1. Construction of 6.41 km Nto Edino – Ekwere Azu road with 2No 45m Span Bridges in Obot Akara

2. Construction of 4.2km Abak Ifia – Ikpe Mbak Eyop – Ikot Abia Osom – Nko Road and Spurs in Ikot Ekpene and Obot Akara Local Government Areas.

Inter-ministerial Projects

3. Construction of Assembly Hall at Govt. Sec. Sch. Ikpe Mbakeyop

4. Renovation of 4 Classroom Block at Govt. Sec. Sch. Ikpe Mbakeyop

5. Construction of 3 Classroom Block at Govt. Sec. Sch. Ikpe Mbakeyop

6. Construction of 4 Classroom at Ikpe Mbak Eyop

7. Renovation of 4 Classroom at Meth P/S, Obot Atan

8. Renovation of 4 Classroom at CSS, Ikot Ukana

9. Production of 1000No Dual Desk

10. Water and Sanitation facility Projects at FIDA, Abiakpo Ibo, Nto Edino, Nto Eton, Ubon Akwa communities in collaboration with EU

(Abak, Etim Ekpo, Ika)

Abak

1. Construction of 14km Abak Nsekhe – Ikot Akpa Nkuk – Ikot Etim –Ikot Ikara (Phase 111 Section A) Ikot Ikara – Ikot Ibritam, (Abak, Ukanafun & Oruk Anam) (ongoing)

2. Fertilizer Blending Plant, Abak (Loading…)

3. Construction of 2.6km Abak Urban Roads - Construction of Obio Odo Str. Off Ikot Okoro Road, Construction of Ebong Akpan Inyang Street Construction of Model Sec. Sch. Access Road Ikot Ekang

4. Construction of 14.0km Abak -Nsekhe – Ikot Akpa Nkuk – Ikot Etim – Ikot Ikara (Phase III Section A) Ikot Ikara to Ikot Ibritam

5. Government Model Girls Secondary School, Ikot Ekang, Abak

Inter-ministerial Projects

6. Renovation of 4 Classroom Blocks at Government Technical College

7. Renovation of Science Laboratory at Government Technical College

8. Renovation of Assembly Hall at St. Mary’s Science College, Ediene Abak

9. Renovation of 4Classroom Block at St. Mary’s Science College, Ediene Abak

10. Renovation of 3Classroom Block at St. Mary’s Science College, Ediene Abak

11. Renovation of Building Department at Government Technical College, Abak

12. Renovation of Principal Qtrs at Government Technical College, Abak

13. Production of 1000No Dual Desk

ETIM EKPO

Inter-ministerial Projects

1. Renovation of 4Classroom Block at St. Anthony primary school, Eka Obong

2. Construction of Assembly Hall Block at primary school Utu Nsekhe, Utu Ikot Eboro

3. Renovation of 3Classroom block at Primary school, Obong Ntak

4. Construction of 3Classroom block at Primary school, Utu Nsekhe, Utu Ikot Eboro

5. Reconstruction of Assembly Hall at CSS, Eka Obong

6. Reconstruction of Classroom Blocks at CSS, Eka Obong

7. Reconstruction of Classroom Blocks at Primary school, Eka Obong

8. Production of 220No Dual Desk

IKA

Inter-ministerial Projects

1. Solar Powered Borehole at Primary school Ikot Akpan Offiong

2. Renovation of Classroom Blocks at Government primary school, Udi

3. Construction of 4Classroom Block at primary school, Ikot Akpan Offiong

4. Renovation of 4Classroom Block at Government primary school, Achan

5. Reconstruction of Classrooms at St Patrick primary school, Urua Inyang

6. Reconstruction of Assembly Hall at St. Patrick primary school, Urua Inyang

7. Production and Supply of 220No Dual Desk

(Ukanafun, Oruk Anam)

UKANAFUN

Inter-ministerial Project

1. Renovation of 4 Classroom Block at GPS, Ikot Akpaidem

2. Renovation of Assembly Hall at GPS, Ukanafun Edem Inyang

3. Renovation of 4Classroom Block at Ukanafun Edem Inyang

4. Renovation of Classroom Block at GPS, Ikot Akpa Nkuk

5. Construction of 3Classroom Block at Ikot Akpa Nkuk

6. Construction of Civic Centre at Ikot Udo Mbang

7. Provision of Solar Powered Borehole at Ata Essien Ukanafun, Ikot Ekpat

8. Renovation of Assembly Hall at QIC School, Ikot Akpan Idem

9. Renovation of Classroom Blocks, Community Secondary School, Urua Ekpa Enang

10. Renovation of Classroom Blocks, Government Secondary School, Nkek Idim

11. Renovation of Classroom Blocks, Government Secondary School, Nsekhe

12. Renovation of Classroom Blocks, Government Secondary School, Nkek Enen Ido

13. Renovation of Classroom Blocks, Government Secondary School, Nkek Ndon

Anan

14. Renovation of Classroom Blocks, QIC Central School, Ikot Akpa Nkuk, Ukanafun

15. Renovation of Classroom Blocks, Western Annang Secondary Commercial School, Ukanafun

16. Renovation of Classroom Blocks, Government School, Ikot Odiong, Ukanafun

17. Renovation of Classroom Blocks, Government School, Ikot Etim

18. Renovation of Classroom Blocks, Government School, Ikot Akai, Uka

19. Renovation of Classroom Blocks, QIC Okojor, Ukanafun

20. Renovation of Classroom Blocks, Comprehensive High School, Ntak Afaha

21. Production of 1000No Dual Desk

ORUK ANAM

1. Construction of 23.25km Ikot Ekaide – Ikot Okoro – Ikot Ibritam Road, Oruk Anam (ongoing)

2. Construction of 18.95km Ikot Ibritam – Ekeffe – Ikot Akpan Afaha Road with 1No Bridge, Oruk Anam (ongoing)

3. Construction of 4.95km Ibesit Okpokoro - Ikot Ibritam, Oruk Anam (ongoing)

4. Renovation of General Hospital, Ikot Okoro, Oruk Anam

5. Facilitates the establishment of Navy Military School, Ekparakwa.

6. Taking over of Urban High School, Ikot Akpan Essien, Oruk Anam

7. Construction of 5.1km Internal Roads in Akwa Ibom State University, Obio Akpa campus

Inter-ministerial Projects

8. Construction of 4 Classroom Block at Primary School, Ata Obio Akpa

9. Construction of Assembly Hall at Primary School, Ata Obio Akpa

10. Construction of 500m of Fence at Navy Military School, Ekparakwa

11. Electrification projects in Ikot Akpan Ibesit, Oruk Anam

12. Renovation of 4 Classroom Block, Primary School, Ibesit, Oruk Anam

13. Renovation of 4Classroom Block at GPS, Ikot Oko

14. Renovation of 3Classroom Block at primary school, Ikot Essien, Ikot Obioruk

15. Renovation of 3Clrassroom Block at Primary school, Ukpom

16. Electrification at Ibianga Ikpe

17. Renovation of 4Classroom Block at Government School, Ikot Afanga

18. Renovation of Classroom Block at SAPS, Ibesit Okpokoro

19. Reconstruction of Assembly Hall at GPS, Ata Obiokpa

20. Reconstruction of 4Classroom Block at GPS, at Ata Obiokpa

21. Renovation of a Hall and 2Classroom Block at primary school, Ikot Akpan Essien

22. Construction of Market Sheds at Ikot Esenam

23. Rehabilitation of Electrification at Ikot Esenam & Environs

(Ikono/Ini Fed. Constituency) IKONO

1. Dualization of 25.0km Uyo – Ikot Ekpene Road.

2. Construction of 4.6km College of Science and Technology Road, Nung Ukim, Ikono

Inter-ministerial Projects

3. Renovation of 4No Blocks at General Hospital, Ikono

4. Renovation of Classroom Block at MS, Ik. Udu Ndiya

5. Construction of 3 Classroom Block at MS, Ik Udu Ndiya

6. Renovation of HCS, Nung Udoe Itak, Ikono

7. Renovation of 6Classroom block/office at Govt. Sch. Ibiaku Ikot Ukana

8. Renovation of 6Classroom block/office at Govt. Sch. Mbiaobong Ukam

9. Renovation of 3Classroom block/office at St. Michael Sch. Ikot Oku/Ikot Aya

10. Production of 220No Dual Desk

INI

1. Construction of the 14.1km Odoro Ikpe – Ikpe Ikot Nkon – Obotme –

2. Arochukwu Road with 110m Bridge through Alternative Project Funding Approach (APFA)

Inter-ministerial Projects

3. Renovation of 3 Classroom Block

4. Construction of 3 Classroom Block at GPS PCN Nchana Ebua

5. Construction of Assembly Hall at

6. Construction of fence at Primary Sch. Mbiaobong Ikot Udofia

7. Construction of Market Sheds & Water Supply at Urua Affiong Aran

8. Construction of fence at Primary Sch. Mbiaobong Ikot Udofia

9. Electrification 10. Production of 500No Dual Desk
Re: Gov.udom Release 3.5yrsReport Card On Projects Ongoing And Completed In All LGAs by viver1: 9:47am On Jan 05, 2019
Credit is due here.
Re: Gov.udom Release 3.5yrsReport Card On Projects Ongoing And Completed In All LGAs by Edygrin(m): 9:54am On Jan 05, 2019
I don't know about other senatorial districts but Udom did nothing for Ikot Ekpene senatorial district. All the projects listed there under Ikot Ekpene are either incomplete or non existent.... The Ikot Ekpene - Uyo road is still at the phase Akpabio left it...
Re: Gov.udom Release 3.5yrsReport Card On Projects Ongoing And Completed In All LGAs by Atouke: 10:02am On Jan 05, 2019
Edygrin:
I don't know about other senatorial districts but Udom did nothing for Ikot Ekpene senatorial district. All the projects listed there under Ikot Ekpene are either incomplete or non existent.... The Ikot Ekpene - Uyo road is still at the phase Akpabio left it...

Not true ikot ekpene uyo road is almost complete less than 5km left. What held the project was paying compensation for those whose properties were on the right of way before demolishing the houses.

The last administration failed to pay those compensation for Julius Berger to complete the road.

Gov. Udom has paid all the compensation and all those properties has been demolished, and as we speak that road is nearing completion.
Re: Gov.udom Release 3.5yrsReport Card On Projects Ongoing And Completed In All LGAs by Edygrin(m): 10:27am On Jan 05, 2019
Atouke:


Not true ikot ekpene uyo road is almost complete lesd than 5km left. What held the project was paying compensation for those whose properties were on the right of way before demolishing the houses.

The last administration failed to pay those compensation for Julius Berger to complete the road.

Gov. Udom has paid all the compensation and all those properties has been demolished, and as we speak that road is nearing completion.
Lol..... I'm typing from Ikot Ekpene currently and I can categorically tell you that the road you are referring to is still at the phase Akpabio left it... Don't come to the internet to spread lies. Thank you

3 Likes

Re: Gov.udom Release 3.5yrsReport Card On Projects Ongoing And Completed In All LGAs by Atouke: 10:44am On Jan 05, 2019
Edygrin:

Lol..... I'm typing from Ikot Ekpene currently and I can categorically tell you that the road you are referring to is still at the phase Akpabio left it... Don't come to the internet to spread lies. Thank you
I dont deal in false hood. Compensation has been paid, all properties on the right of way has been demolished and road construction is ongoing as we speak. And thats the truth.
Re: Gov.udom Release 3.5yrsReport Card On Projects Ongoing And Completed In All LGAs by Ray07(m): 10:56am On Jan 05, 2019
Edygrin:

Lol..... I'm typing from Ikot Ekpene currently and I can categorically tell you that the road you are referring to is still at the phase Akpabio left it... Don't come to the internet to spread lies. Thank you
baba cool down . . .
Na small small,
as long as say na our state, na we go still enjoy am unlike what Buhari is doing, focusing his interest on the north and west only.
Akwa ibom is for us and for us.
Re: Gov.udom Release 3.5yrsReport Card On Projects Ongoing And Completed In All LGAs by Edygrin(m): 11:15am On Jan 05, 2019
Atouke:

I dont deal in false hood. Compensation has been paid, all properties on the right of way has been demolished and road construction is ongoing as we speak. And thats the truth.
post pictures with time stamp of the ongoing project here.

1 Like

Re: Gov.udom Release 3.5yrsReport Card On Projects Ongoing And Completed In All LGAs by Edygrin(m): 11:19am On Jan 05, 2019
Ray07:
baba cool down . . .
Na small small,
as long as say na our state, na we go still enjoy am unlike what Buhari is doing, focusing his interest on the north and west only.
Akwa ibom is for us and for us.
Na our state I know! But Udom people should stop spreading falsehood. He came to Ikot Ekpene in 2014 and promised heaven and earth, fast forward to 2019 he is yet to complete a single project in the senatorial district and his people are here spreading falsehood..
Re: Gov.udom Release 3.5yrsReport Card On Projects Ongoing And Completed In All LGAs by Afamed: 11:37am On Jan 05, 2019
Edygrin:
Na our state I know! But Udom people should stop spreading falsehood. He came to Ikot Ekpene in 2014 and promised heaven and earth, fast forward to 2019 he is yet to complete a single project in the senatorial district and his people are here spreading falsehood..
Gbam.
Re: Gov.udom Release 3.5yrsReport Card On Projects Ongoing And Completed In All LGAs by poiZon: 12:14pm On Jan 05, 2019
Edygrin:
Na our state I know! But Udom people should stop spreading falsehood. He came to Ikot Ekpene in 2014 and promised heaven and earth, fast forward to 2019 he is yet to complete a single project in the senatorial district and his people are here spreading falsehood..
its either u hv never pass that route between 2017 n 18 cos if u did u would ve seen the project has gone pass the stage akpabio left to another stage.
the last time my woman pass that road probably december 2018 for trad marriage at ini lga she said the road has gone pass utu ikot essien almost towards ibiakpan. akpabio left that road at a few metresbefore itak junction. we all knw btween itak to the current stage the road is is quite a good distance.
dont also forget in the handover note to udom on the 29may 2015, that project was tagged completed n commissioned. we shud be asking where akpabio kept the monies he embezzled for that project.
Re: Gov.udom Release 3.5yrsReport Card On Projects Ongoing And Completed In All LGAs by Atouke: 3:03pm On Jan 05, 2019
Edygrin:
post pictures with time stamp of the ongoing project here.
Thats your job.

(1) (Reply)

Kano Rerun: Kwankwaso Orders Peaceful Protest Against Results / Which Nigerian Sector Is Progressing Today? / Nigeria Is The Giant Of Africa

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 87
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.