On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 1:17pm On Aug 21, 2020 |
DESIGN ANALYSIS Ground floor Entrance porch Ante- room Visitor toilet Sitting room Stair hall Dining Kitchen Store Exit balcony Laundry Guest room with toilet
Upper floor Family lounge Master bedroom with sit out Other 2 rooms all ensuite.
AREA OF THE BUILDING 120 345Sqmts.
LOCATION Badagry Lagos State.
NATURE OF THE SITE Very sloppy ground in terms of topography whereby 8 coaches at the front (lowest point) equate to 5 coaches at the back(highest point).
METHOD OF CONSTRUCTION We decided to introduce double walling retaining wall at the lowest point where we have 8coaches.( I.e. reinforced wall/ground beam has taken care of 2coaches, then 5coaches of blocks on it then finally introduced another beam on it round.
In a nutshell, it was chained round before the construction of oversite concrete/German floor. Not forgetting the properly placement of 22 columns at the strategic places.pictures are as follow 1 Like 1 Share |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 1:23pm On Aug 21, 2020 |
Digging after setting out |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 1:24pm On Aug 21, 2020 |
Dig2 |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 1:25pm On Aug 21, 2020 |
Dig3 |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 1:27pm On Aug 21, 2020 |
Dig4 |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 1:28pm On Aug 21, 2020 |
Dig5 |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 1:29pm On Aug 21, 2020 |
Dig6 |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 1:31pm On Aug 21, 2020 |
Dig7 |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by qwertyboss(m): 1:41pm On Aug 21, 2020 |
Following |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Dicta18: 1:44pm On Aug 21, 2020 |
Following |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 1:49pm On Aug 21, 2020 |
Boarding of ground beam and placement of short columns. |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 1:50pm On Aug 21, 2020 |
2 |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 1:51pm On Aug 21, 2020 |
3 |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 1:52pm On Aug 21, 2020 |
4 |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 1:53pm On Aug 21, 2020 |
5 |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 2:03pm On Aug 21, 2020 |
Casting of floor beam |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 2:05pm On Aug 21, 2020 |
2 |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 2:06pm On Aug 21, 2020 |
3 |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 2:08pm On Aug 21, 2020 |
4 |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 2:09pm On Aug 21, 2020 |
6 |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 2:26pm On Aug 21, 2020 |
DE-BOARDING AND SETTING OF BLOCK |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 2:27pm On Aug 21, 2020 |
2 |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 2:28pm On Aug 21, 2020 |
3 |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 2:28pm On Aug 21, 2020 |
4 |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 2:29pm On Aug 21, 2020 |
5 |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 2:30pm On Aug 21, 2020 |
6 |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 2:30pm On Aug 21, 2020 |
7 |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 2:31pm On Aug 21, 2020 |
8 |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 2:32pm On Aug 21, 2020 |
10 1 Like |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 2:33pm On Aug 21, 2020 |
11 |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 2:34pm On Aug 21, 2020 |
12 |
Re: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(m): 2:34pm On Aug 21, 2020 |
13 |