Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,150,515 members, 7,808,878 topics. Date: Thursday, 25 April 2024 at 06:31 PM

Construction Of Two Bedrooms Luxury Apartments - Properties (4) - Nairaland

Nairaland Forum / Nairaland / General / Properties / Construction Of Two Bedrooms Luxury Apartments (7821 Views)

2 BEDROOMS LUXURY BUNGALOW NOW AT OASIS COURT, POKA EPE / 6 Units Of 4 Bedrooms Luxury Luxury Duplexes With 1 Unit Of 5 Bedrooms Available / Two Units Of Two Bedrooms For Sale On A Plot Of Land Asking Price 7.5m (2) (3) (4)

(1) (2) (3) (4) (5) (6) (Reply) (Go Down)

Re: Construction Of Two Bedrooms Luxury Apartments by kopell: 2:11pm On Nov 28, 2021
Aforxzy:
Painting continues
Good job madam. What man can do, woman can do it better with less headache bravo.

2 Likes

Re: Construction Of Two Bedrooms Luxury Apartments by Kingdemu: 2:40pm On Nov 28, 2021
Wow shocked...This is beautiful! Good job kiss

1 Like

Re: Construction Of Two Bedrooms Luxury Apartments by Aforxzy(f): 8:23am On Dec 02, 2021
We have removed the scaffolds.
While we continue with the painting and other works.

Pinettum.....08028136294

1 Like

Re: Construction Of Two Bedrooms Luxury Apartments by Aforxzy(f): 5:05pm On Dec 11, 2021
More pictures.

We are yet to install the kitchen cabinets.

1 Like

Re: Construction Of Two Bedrooms Luxury Apartments by brandsoncharlie: 5:39pm On Dec 11, 2021
Aforxzy:
Solid filling the hollow blocks with concrete.
Why was the hollow blocks filled with concrete.
Re: Construction Of Two Bedrooms Luxury Apartments by brandsoncharlie: 5:43pm On Dec 11, 2021
Aforxzy:
Preparing for ground casting
Compacting & placement of BRC mesh
Why was the wire placed on the damp proof membrane.
Re: Construction Of Two Bedrooms Luxury Apartments by brandsoncharlie: 5:56pm On Dec 11, 2021
Aforxzy:


smiley
Proper planning with adequate funding
and the rains are coming too.
The best term to use is scheduling, or time scheduling, planning is how you carry out a given task, the cost of the project and what goes into it from the initial stage of the project.
Scheduling is your time table to achieving a particular task at a particular stage, there are various methods for this, barcharts or network analysis in civil engineering.
You can have proper planning but if you don't keep to time it can lead to non-performance clause, the client can sue you for it.

2 Likes

Re: Construction Of Two Bedrooms Luxury Apartments by brandsoncharlie: 6:00pm On Dec 11, 2021
Aforxzy:
First floor works:
Beam and slab formwork in progress.
The structure consists of :
450x 230mm and 600x 300mm downstand beams
Within and around the panels.
Please what type of slab panels was designed for this building.
Well done.
Re: Construction Of Two Bedrooms Luxury Apartments by Aforxzy(f): 6:29pm On Dec 11, 2021
Reinforced concrete solid slab was designed.


brandsoncharlie:

Please what type of slab panels was designed for this building.
Well done.
Re: Construction Of Two Bedrooms Luxury Apartments by Aforxzy(f): 6:32pm On Dec 11, 2021
That's Mesh reinforcement.. Not wire pls

brandsoncharlie:

Why was the wire placed on the damp proof membrane.
Re: Construction Of Two Bedrooms Luxury Apartments by Aforxzy(f): 6:39pm On Dec 11, 2021
The hollows in the sandcrete blocks were filled with concrete to solidify the block and to resist lateral pressure from the soil.

brandsoncharlie:

Why was the hollow blocks filled with concrete.
Re: Construction Of Two Bedrooms Luxury Apartments by brandsoncharlie: 9:17pm On Dec 11, 2021
Aforxzy:
That's Mesh reinforcement.. Not wire pls

I was Meant to say concrete wire mesh.
Re: Construction Of Two Bedrooms Luxury Apartments by Aforxzy(f): 9:52pm On Dec 11, 2021
Just like any other reinforcement bars, BRC mesh is provided to give the composite concrete, tensile strength.
Concrete itself is weak in tension but strong in compression... The added mesh provides the needed tensile strength to the concrete's comprehensive strength. The combination makes the composite concrete high in both compressive and tensile strength.

It also reduces growing cracks..


brandsoncharlie:

I was Meant to say concrete wire mesh.
Re: Construction Of Two Bedrooms Luxury Apartments by Aforxzy(f): 10:59am On Dec 22, 2021
Kitchen cabinets works

Re: Construction Of Two Bedrooms Luxury Apartments by Aforxzy(f): 4:48am On Jan 01, 2022
Happy new year 2022. Thank you all for your enquires, comments., and observations.. Let's do it again in 2022 cos it's going to be bigger and better for each and everyone of us.

Please contact us for your building construction works.

Pinettum.....08028136294

Re: Construction Of Two Bedrooms Luxury Apartments by Aforxzy(f): 6:35am On Jan 13, 2022
Construction of soak away and septic tank

Re: Construction Of Two Bedrooms Luxury Apartments by Aforxzy(f): 5:34am On Jan 20, 2022
Pix on soak away. The top slab and beams were designed to support vehicular load.

1 Like

Re: Construction Of Two Bedrooms Luxury Apartments by Aforxzy(f): 6:06pm On Jan 24, 2022
Kitchen cabinets

Re: Construction Of Two Bedrooms Luxury Apartments by Aforxzy(f): 11:50am On Jan 30, 2022
Shower cubicle in place

Re: Construction Of Two Bedrooms Luxury Apartments by id4sho(m): 4:20pm On Jan 31, 2022
Money good cheesy
Re: Construction Of Two Bedrooms Luxury Apartments by Aforxzy(f): 8:36am On Feb 07, 2022
Construction of estate's offices

1 Like

Re: Construction Of Two Bedrooms Luxury Apartments by jiday4(m): 3:50pm On Feb 07, 2022
Aforxzy:
Construction of soak away and septic tank

Great work ma , and kudos .

Pls what's the size of the soakaway plus the septic tank and numbers of materials used eg blocks ,iron etc
Thanks
Re: Construction Of Two Bedrooms Luxury Apartments by Aforxzy(f): 6:20pm On Feb 07, 2022
The size of the septic/ soak away is 4.625mx 3.25m x 3m deep.

The slab, beams and columns were designed to support vehicular load. So we made the slab 200mm thick while the perimeter and internal beams were 450mm deep.

Various sizes of iron rods were used from Y10mm for the links, Y12mm for the slab and beams and Y16mm for the beams and columns. In total, 42 lenghts of steel were used.

The block were 9inches and about 400 nos were used.

Please note that the size of your septic/soak away should depend on the projected number of users or occupants of the building.




jiday4:


Great work ma , and kudos .

Pls what's the size of the soakaway plus the septic tank and numbers of materials used eg blocks ,iron etc
Thanks

3 Likes

Re: Construction Of Two Bedrooms Luxury Apartments by jiday4(m): 12:04pm On Feb 08, 2022
Aforxzy:
The size of the septic/ soak away is 4.625mx 3.25m x 3m deep.

The slab, beams and columns were designed to support vehicular load. So we made the slab 200mm thick while the perimeter and internal beams were 450mm deep.

Various sizes of iron rods were used from Y10mm for the links, Y12mm for the slab and beams and Y16mm for the beams and columns. In total, 42 lenghts of steel were used.

The block were 9inches and about 500 nos were used.

Please note that the size of your septic/soak away should depend on the projected number of users or occupants of the building.

Thank you so much, very detail and exactly what I need.




Re: Construction Of Two Bedrooms Luxury Apartments by Aforxzy(f): 4:33pm On Feb 11, 2022
Progress pix on the estate office

2 Likes

Re: Construction Of Two Bedrooms Luxury Apartments by Aforxzy(f): 10:14am On Feb 21, 2022
External works: kerbs and paving stones..


Pinettum.....08028136294

2 Likes

Re: Construction Of Two Bedrooms Luxury Apartments by NNTR: 9:20am On Feb 27, 2022
n3xt:
That was lightning fast!
What’s the secret?

Aforxzy:
smiley
Proper planning with adequate funding
and the rains are coming too.
Yes, funds always, is one of the main koko, and of course proper planning.
If no proper planning then the outcome will be proper failure on all levels, sorry for the puns, loll.

Personal text: Jesus is not a theologian. He is God who told stories.
Re: Construction Of Two Bedrooms Luxury Apartments by Aforxzy(f): 7:03pm On Mar 15, 2022
We are still available for your enquiries.

Contact us for your building construction works.

Pinettum: 08028136294
Re: Construction Of Two Bedrooms Luxury Apartments by Aforxzy(f): 12:04pm On Mar 31, 2022
More pictures on external work: kerbs and paving stones.

Re: Construction Of Two Bedrooms Luxury Apartments by n3xt(m): 4:47pm On Mar 31, 2022
Aforxzy:
More pictures on external work: kerbs and paving stones.

Very clean finish! Well done.
Re: Construction Of Two Bedrooms Luxury Apartments by Aforxzy(f): 7:45pm On Mar 31, 2022
Thanks

n3xt:


Very clean finish! Well done.
Re: Construction Of Two Bedrooms Luxury Apartments by Aforxzy(f): 7:55pm On Apr 12, 2022
More pictures

(1) (2) (3) (4) (5) (6) (Reply)

Something About Gtbank Buildings / Ready to build Plots of land For Sale In OLOMOWEWE IBEJU LEKKI / MASTERS VILLA ESTATE, Awoyaya Ajah, 700sqm(60ft/120ft) @#5.6m

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 28
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.