The Making of Budget Duplexes with Cost And Pictures by deking(m): 7:05pm On Apr 30, 2021
Hello All,

We will be sharing pictures, costs and updates on the making of several budget duplexes.

Duplexes have better rental and fling values and offers the owner greater flexibility than block of flats.

This thread is to encourage potential home owners and to share experiences and learnings as was the case with other great threads by veteran builders on this platform.

Regards
Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 7:24am On May 01, 2021
Project 1

Site Location: Palm Havens Estate, Adjacent Channels TV, Isheri-Opic.

We commenced clearing of the site and the supply of materials for our raft foundation.

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 7:29am On May 01, 2021
The project is a twin 4 Bedroom duplex.

Size of land is 484Sqm.

Build area approx 235Sqm

Budget for 6 board raft foundation with perimeter base ==> 6M

1 Like

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 7:50am On May 01, 2021
We also commenced filling the frontal part of the plot which formed part of the road. This is to allow for easy access to the plot during construction.

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 7:52am On May 01, 2021
We had to evacuate the existing owners of the plot grin grin.

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 8:13am On May 01, 2021
We successfully filled the road and part of the perimeter of the plot to prevent back flow of water from adjoining plot.

Total filling used 29 trips of 20 tons of filling sand approximate cost of 900k including cost of labourers to fill.
Site clearing was 50K because of the dept of some part of the land.

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 8:14am On May 01, 2021
More pictures

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 8:15am On May 01, 2021
Road filled

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 8:16am On May 01, 2021
Then materials started arriving in different shades and sizes

30 tons of granite through Mr Chekitaut. Great tonnage. grin

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 8:18am On May 01, 2021
Another supply of 30 tons of granite through someone else. Not on Nairaland.

Plan was not to put all our eggs in one basket to avoid disappointments. Equally good tonnage

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 8:24am On May 01, 2021
Then came iron rods and wood.

At the start of the project back in February 2021.

1 ton of TMT iron rods sold for 330k. Now selling for around 390K. Cement was N2850 per bag. Sold for N3400 last Saturday and was reported to be N3800 in some parts last Tuesday embarassed

This is why we quote projects per level to avoid unbearable variations in cost due to inflation.

And the best time to start any project is now.

1 Like

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 8:27am On May 01, 2021
More materials were supplied for the work to commence.

We got 300 bags of cement as we were able to store in the building beside the plot.

Great neighbors. grin grin grin

We also commenced setting out and blinding works

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 8:28am On May 01, 2021
The iron bender also commenced work.

Cost will be updated later.

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 8:42am On May 01, 2021
We used aggregates to stabilize some.part of the land to reduce the potential effects of differential settlement later.

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 8:42am On May 01, 2021
More

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 8:44am On May 01, 2021
Even more grin grin grin.

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 8:44am On May 01, 2021
The land was indeed a trench.

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 8:46am On May 01, 2021
Blinding progressed well even with the resistance from water.

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 8:46am On May 01, 2021
Even more

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 8:48am On May 01, 2021
We started getting desired results.

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 8:49am On May 01, 2021
As things solidified, the race was about to begin.

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 9:02am On May 01, 2021
Then came the troops. The foundation works.

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 9:03am On May 01, 2021
And we attacked it

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 9:04am On May 01, 2021
More.

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 9:05am On May 01, 2021
And it started taking shape.

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 9:06am On May 01, 2021
Similar project of ours in the same neighborhood.

Same process same effect.

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 10:22am On May 01, 2021
Boarding of the base of the raft in preparation for casting.

Our approach is to use an L beam shape for the perimeter of the building to give it greater stability as research and experience has shown that buildings in waterlogged area usually settle outwards.

This design also follows the structure of the human feet.

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 10:23am On May 01, 2021
More

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 10:23am On May 01, 2021
Even more

1 Like

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 10:07pm On May 01, 2021
The making of the base continued.

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 10:10pm On May 01, 2021
Professionally laid out and all set for casting

Re: The Making of Budget Duplexes with Cost And Pictures by deking(m): 10:11pm On May 01, 2021
And then came the base for solid footing for the building.

(1) (2) (3) (Reply)

For Sale : Vacant 3 Bedroom Flat In Iba Estate (near Lasu) With Picture N2.5m. / A Story Building Of 2 Flat Of 4bedroom Each,with BQ For Sale now,#25m In IB / Land Grabbing By Ogun State Govt At Papalanto-ofada Road - Who Is Affected?

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 18
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.