Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by TEQ365VENTURES(m): 6:45am On Jun 29, 2021 |
spyder880:thanks! It’s very enlightening. 1 Like |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 1:18pm On Jun 29, 2021 |
Unit 2 loading....... Setting out the site of the second duplex. 3 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 7:20pm On Jun 29, 2021 |
More pictures 3 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 7:25pm On Jun 29, 2021 |
Sand filling unit one, we are going to water and hammer this level of filling, and later buy more filling sand to add to this filling, and repeat the compaction process again. 2 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 7:53pm On Jun 29, 2021 |
Starting the foundation excavation on unit 2 2 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 9:06pm On Jun 29, 2021 |
Inside the trenches......... 2 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 9:11pm On Jun 29, 2021 |
More foundation pictures from the second unit......... 2 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by Celepope: 1:46am On Jun 30, 2021 |
What is the importance of the pipe in this foundation, is it a must that all foundation will have one and if a foundation doesn't have one what's the disadvantage? Your response will highly be appreciated and add to my knowledge. |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 5:14am On Jun 30, 2021 |
Celepope: The pipes in the foundation are just provisions for conduit piping for waste or even water supply in or out of the house, it's a must for buildings which we plan to have conduit (internal) pipes running inside the walls, up through the lintels, the decking and up to the vent pipes. The house walls will now be built with the pipes running inside walls. Advantages, neat clean walls without pipes showing everywhere, Disadvantages, extra cost, extra time needed to fit the pipes. 4 Likes |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 8:38pm On Jul 02, 2021 |
Completed portions of this foundation......... 2 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 8:42pm On Jul 02, 2021 |
We bought more chippings 2 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 8:45pm On Jul 02, 2021 |
Concrete cast of the column bases and blinding of the trenches....... This is the second duplex unit being worked on......... 2 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 4:39am On Jul 06, 2021 |
Pictures from unit one of these duplex construction....... we are waiting for filling sand . 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 4:44am On Jul 06, 2021 |
There was a lot of difficulty in sourcing building materials like blocks and sand from this location. Too much demand has made these suppliers to be rationing building materials to us. 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 4:47am On Jul 06, 2021 |
Had to hijack this load of sand heading to another site after toppling N5,000 to the driver. The going cost was N50,000, but I paid N55,000 just to keep the work going. 2 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 4:52am On Jul 06, 2021 |
But our work continued after we got the materials.......... 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 4:56am On Jul 06, 2021 |
These pictures are from unit 2 of the identical duplexes......... 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by Focusmind: 4:58am On Jul 06, 2021 |
Mehn, I love the site already. Plain and undulating. Very inviting with beautiful surrounding vegetation. The great Anambra state. Small boys millionaires state. Great Spyder, moving into contemporary designs. I love it that Anambra people are now adopting this kind of design. Good job bro! Good job. I can't wait to see your touch in this build. 4 Likes |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 5:00am On Jul 06, 2021 |
More pictures from this foundation walls....... 2 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 5:06am On Jul 06, 2021 |
Focusmind: Its refreshing to see the change to contemporary designs here, and Anambra has had more than a fair share of imposing buildings over the years. I am sure many more people will copy this design and even improve on it as more years pass. I also have an offer from Imo state on another interesting and challenging contemporary design. I am looking forward to building more of these designs. Thank you Sir. 4 Likes |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 10:01am On Jul 07, 2021 |
Unit 1 of these 2 duplexes here is being supplied with filling sand. We are currently filling this foundation....... 1 Like |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 10:34am On Jul 09, 2021 |
Unit 1 as seen from above........ 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 8:29pm On Jul 10, 2021 |
We've been bringing in a lot of materials for the filling of this foundation, this is on unit 1 of the two identical buildings ...... 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 8:40pm On Jul 10, 2021 |
Offloading more filling sand......... 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 8:46pm On Jul 10, 2021 |
These are the updates of out work in the second identical unit, the unit 2 of this project......... 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 8:52pm On Jul 10, 2021 |
More, as we cast the beams of this second house ....... 2 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by Abudu2000(m): 2:18am On Jul 14, 2021 |
spyder880:just did one for a client recently. space was minimal but we worked it out with an extended cantilever at the top. |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 7:20am On Jul 14, 2021 |
Abudu2000: That's very good. 2 Likes |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 7:43am On Jul 14, 2021 |
From unit 2 of these twin fully detached duplexes......... 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 8:00am On Jul 14, 2021 |
We are currently sand filling unit 1. 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 7:36am On Jul 19, 2021 |
Sand filling of this site will comtinue today as we have got more sand delivered........ 1 Like |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by Qualer: 4:34pm On Jul 20, 2021 |
spyder880: nothing sweet pass blocks laid in a very straight line. Nwokem, Una well done o! 2 Likes |
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (19) (Reply)
Lady Poses In Front Of Her Flooded House In Benue State (Photos) / 10 Risky Areas In Lekki/Ajah To Verify Before You Buy A Property / Construction Of A 10 Story Office Building
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 26 |