Part 2: Processes Of Getting A Building Plan Approval In Lagos State by Thinkmint: 5:02pm On Jun 11, 2021 |
Getting a building approval plan in Lagos State indicates that the building complies with the statutory laws and regulations in erecting a building. In our previous post, we undressed into details what a building plan is and its importance and types. The Lagos State Building Control Agency (LASBCA) is saddled with some of the following responsibilities; inspection and certification of various buildings, building control in all ramifications. The Lagos State Physical Planning And Development Authority (LASPPDA), a section under the Ministry of Physical Planning And Urban Development is in charge of approving the building plan. It is expected from the investors that after building plan approval has been obtained from the Lagos State Building Control Agency (LASBCA). Workers must strictly follow the rules guiding the construction process. The project might get sealed off if there is any deviation from the rules as such buildings are prone to imminent collapse. Five (5) Processes of Getting A Building Plan Approval In Lagos State The following a process of getting a building plan approval; 1. Get Architectural drawings, building plan, and survey plan: This process is called Vetting because you are applying for a building plan approval using the structural drawings and the survey plan. At this stage, the survey plan is charted using its coordinates to see if it located where it claimed to be located. Also, the survey is charted to detect if it truly registered. In addition to that, the building plan is also passed through rigorous checking to determine if it meets the standard of its design. The criteria evaluated are; ventilation, standard measurements, green areas e.t.c . Furthermore, the architectural drawings need to be signed by The Council for the Regulation of Engineering in Nigeria, COREN. The COREN engineers ensure that the drawings are acceptable with corrected with the calculation sheets. Continue reading: https://www.thinkmint.ng/buyrealestate/getting-a-building-plan-approval-in-lagos-state/ |
(1) (Reply)
These Ones Has Very Large Amount Of Gas Deposit / Luxury Two Bedroom Terrace With Bq In The Ambiance By Tribitat / Looking For The Perfect Escape From The City, Get Stunning Land In Ibeju Lekki
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 8 |