892sqm Land For Mixed Development / 4 Unit 2 Bedroom Block Of Flats Design - One Plot / Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice (2) (3) (4)

(1) (2) (3) (4) (5) (Reply) (Go Down)

Construction of Block of Flats, Mixed development and more by Aforxzy(f): 9:02am On Jun 26, 2021
This post showcases some of our numerous projects.


1.0 Construction of one bedroom block of flats in Ogun State.

This building is made up of three floors comprising of 4 nos ONE bedroom apartment on each floor with three staircases.

Foundation type: Pad and wide Strip

Site picture attached.




2. Construction of a mixed development in Lagos.
The building consists of a church auditorium, offices, residential apartments with car park on the ground floor.
The building is made up of three floors and a pent with two staircases, a lift shaft and shear walls

Foundationion Type: Raft beam and slab

Pinettum.....08028136294

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 9:42pm On Jun 27, 2021
The building dimension is 27m by 15m.

The attached are the pictures from the preliminary & sub structure works

Setting out of the building
Excavation of foundation trenches in progress

Re: Construction of Block of Flats, Mixed development and more by Homextras: 6:08am On Jun 28, 2021
Following

1 Like

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 8:16pm On Jun 29, 2021
Excavation of trench continues.

Rebars for the columns and bases

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 1:12pm On Jul 01, 2021
Sub structure works continues: Blinding & placement of column base rebars.

Re: Construction of Block of Flats, Mixed development and more by RobbStark(m): 1:19pm On Jul 01, 2021
Excavation looks neat. Weldone

Following....................

1 Like

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 1:43pm On Jul 01, 2021
Thanks

RobbStark:
Excavation looks neat. Weldone

Following....................
Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 2:04pm On Jul 02, 2021
Casting of column bases and wall strips.

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 7:40pm On Jul 03, 2021
Foundation blocks setting out and block laying

Re: Construction of Block of Flats, Mixed development and more by mrsage(m): 8:08pm On Jul 03, 2021
Following...
Re: Construction of Block of Flats, Mixed development and more by twinskenny(m): 9:04pm On Jul 03, 2021
well done Engr

following

1 Like

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 11:36am On Jul 07, 2021
More pictures of sub structural works

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 8:53pm On Jul 12, 2021
Ground floor works

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 7:40am On Jul 18, 2021
More works on the ground floor block settings

Re: Construction of Block of Flats, Mixed development and more by walexProjects(m): 9:34pm On Jul 23, 2021
Hello Aforxzy,hope you are doing well,
Kudos to you for the good job you're doing for Nigerians.
I'm Adewale , the Principal Partner of ARAPROJECTS ( An Electomechanical Engineering firm)
We specialize in the design of Mechanical, Electrical and Plumbing services for any project.
Have been following you and I can see that we can work together on different projects.
I can offer my service in the design of M&E Services.
You can do well by inviting us to bid for any upcoming projects requiring our services


Thanks in anticipation of your kind response
Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 4:44am On Jul 24, 2021
Noted

walexProjects:
Hello Aforxzy,hope you are doing well,
Kudos to you for the good job you're doing for Nigerians.
I'm Adewale , the Principal Partner of ARAPROJECTS ( An Electomechanical Engineering firm)
We specialize in the design of Mechanical, Electrical and Plumbing services for any project.
Have been following you and I can see that we can work together on different projects.
I can offer my service in the design of M&E Services.
You can do well by inviting us to bid for any upcoming projects requiring our services


Thanks in anticipation of your kind response
Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 4:45am On Jul 24, 2021
First floor slab and beams formworks

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 1:15pm On Jul 27, 2021
First floor rebars

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 7:28pm On Aug 02, 2021
More pictures

Re: Construction of Block of Flats, Mixed development and more by anthonyuncle(m): 6:49am On Aug 04, 2021
nice one.

very clean job

1 Like

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 2:00pm On Aug 07, 2021
First floor slab and block setting

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 3:12am On Aug 11, 2021
More pictures on block settings

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 9:05pm On Aug 17, 2021
Lintel and columns : formwork, reinforcements and casting

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 7:08am On Aug 20, 2021
Block setting continues to the soffit of the beams and slab.
The beams are 600-450mm x 225mm and the slab thickness is 150mm.

We are procuring materials for the beam and slab formwork for the next stage of works

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 2:12pm On Aug 25, 2021
Second floor beam and slab formwork.

We also reuse some of the woods like the Marine boards, 2x2 and bamboo.

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 1:51pm On Aug 31, 2021
Second floor Reinforcement and M+E works

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 7:19pm On Sep 08, 2021
More pictures

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 7:54pm On Sep 14, 2021
Second floor casting

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 3:29am On Sep 17, 2021
Second floor Block setting out

Re: Construction of Block of Flats, Mixed development and more by Aforxzy(f): 12:37pm On Sep 22, 2021
Second floor block setting continues to lintel level

Re: Construction of Block of Flats, Mixed development and more by Efex13(m): 3:05pm On Sep 22, 2021
Nice Job.
Keep it up

1 Like

Re: Construction of Block of Flats, Mixed development and more by topsy23: 3:47pm On Sep 22, 2021
This building look bigger, 4nos of 1 bedroom apartment on each floor.

How did the client planning to meter each tenant?
Are they going to have individual generator?
How do you want to connect the building to national grid? individual or combined

Because this is a service apartment.

(1) (2) (3) (4) (5) (Reply)

My Twin Duplex Construction Dilemma! / 1,115 Property Owners In Oyo Fail To Pick Up Certificate Of Occupancy / Dream House Architectural Design, Check It Out It Will Blow!!! Your Mind Friend

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 18
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.