Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,147,850 members, 7,798,839 topics. Date: Tuesday, 16 April 2024 at 11:11 AM

5 Red Flags That May Halt Your Building Plan Approval And Solution - Properties - Nairaland

Nairaland Forum / Nairaland / General / Properties / 5 Red Flags That May Halt Your Building Plan Approval And Solution (229 Views)

DEVELOPER ADVICE How To Get Building Plan Approval In Lagos / When All You Need Are Quality Doors For Your Building / Choose Edges Stone Coated Roofing Sheet For Your Building (2) (3) (4)

(1) (Reply)

5 Red Flags That May Halt Your Building Plan Approval And Solution by adenshelters(m): 11:51pm On Nov 26, 2021
WEEKLY REAL ESTATE LECTURE SERIES

THEME:

5 RED FLAGS� THAT MAY HALT YOUR BUILDING PLAN APPROVAL & SOLUTION

CONTENT:
��
1. Defective Survey Plan

2. Defective Structural Drawing

3. Inappropriate Assessment Fee

4. Physical Site Inspection Discrepancy

5. Improper Registration

SLIDES
��

1. Getting an approval for your building plan means that it is in conformity with the government building standard and set rules, and regulations otherwise, there may be a halt on your building plan approval.

2). The State Building Control Agency and relevant authorities may hinder the approval of your building plan if inappropriate and if default persists, you or your contractor risk being arrested while your illegal building risk being bulldozed by a special monitoring task force.

The 5 Red Flags�

�1. Defective Survey Plan:

The Survey Plan is vetted to check if it is registered or not, to ascertain its zoning restrictions (residential or industrial), to verify its location with its coordinates on the survey plan.

Any discrepancy stalls the building plan approval.

�2. Defective Structural Drawing:

The Structural Drawings are scrutinized to check the cross ventilation of each apartment, air space, setbacks, green areas etc supported by calculation sheet and letter of supervision written and signed by COREN registered Engineer with his membership stamp and seal affixed on the structural drawings.

Any discrepancy stalls the building plan approval.

�3. Inappropriate Assessment Fee:

Not a guarantee for approving your building plan but a changeable amount and processing fee for building plan approval paid to the State government in line with strict adherence to the town planning officials' instructions who are saddled with the responsibility to determine and produce the assessment bill which is stamped, signed with a charge depending on the size and location of your proposed building.

Any discrepancy stalls the building plan approval.

�4. Physical Site Inspection Discrepancy:

A town planning official inspects your site to map it out, covering the major access roads, identifiable streets and major landmarks including the verification of the beacon numbers and their positions in the four corners of your site tallying with same beacon numbers on your survey plan as well as your site description physically confirmed as defined in your building plan approval application.

Any discrepancy stalls the building plan approval.

�5. Improper Registration:

A proper registration of your building plan approval by a qualified professional ensures that a file is opened with a tracking number affixed to it. With this development, it will be easy to trace the progress and approval of your building plan application. Same approval number is written on your site to indicate conformity to standard before commencement of construction activities on your site.

Any discrepancy stalls the building plan approval.

SOLUTION
��
For a successful building plan approval, please endeavor to hire the service of a qualified and experienced professional, vast in town planning requirements to process your error free structural drawings and acceptable building plan application for your next construction project.

In case you have any questions or require our assistance, make no hesitation to contact us today.

END.

Michael

+234 907 957 2044

+234 818 251 5733
☎️
+234 806 229 8875


adenshelterslimited@gmail.com

©️ 2021 Aden Shelters Limited
RC 1743601

�️ Landing you with comfortable landed properties...

(1) (Reply)

Newly Built Mini Flat At Yaba:#500k / Land For Sale In Ibeju-lekki, Direct Owner / 4 Bedroom Semi Detached Duplex With Bq@abijo Lekkilag. Promo Price N49m

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 12
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.