Profile Of An Architects/builder With Sound Xperience by segcymoor(m): 12:51pm On Jul 15, 2011
MOORE SHELTER DESIGNS is founded in July, 1997, but incorporated in
May, 2002,
We poised to producing elegant and functional Architecture; built to specifications. We are concerned about excellent professional standard.
It's a firm made up of relevant professional personnel’s in Building industry ranging from Architects, Civil Engineers, Quantity surveyors, Building Engineers.
Having equipped with a team of seasoned, sound experience, young and dynamic professionals, we can compete favorable in the Building industry
We have experienced and well-grounded workers that are sound in Building construction ranging from Artisans, Brick-layers, carpenters, plumbers, Iron Benders etc.
AIMS & OBJECTIVES
*Prepare modern Architecture with the aid of computer software based on brief given.
*Prepare comprehensive Bill of Quantity based on the working drawings.
*Co-ordinate activities in Building construction, quality assurance and strategic planning
*Liaise with client on technical issue and progress of work at site.
*Interpret the technicality of the DESIGN to the workers in order to ensure quality of finished task
*Ensuring compliance to the standard of Building Regulation Body


Business Structure: DESIGN& BUILD
Business Name: MOORE SHELTER DESIGNS
Registration No.: 131311
Corporate Office: Suite A74, Ikota Shopping Complex, VGC, Lekki Lagos.
Resident;Ikorodu,Lagos
Contact No.: 08023807960; 07042144750
Email:segetony@gmail.com
arc1mooredesign@yahoo.com

Re: Profile Of An Architects/builder With Sound Xperience by segcymoor(m): 12:53pm On Jul 15, 2011
our works,

Re: Profile Of An Architects/builder With Sound Xperience by segcymoor(m): 12:55pm On Jul 15, 2011
designs,

Re: Profile Of An Architects/builder With Sound Xperience by segcymoor(m): 12:58pm On Jul 15, 2011
site works,

Re: Profile Of An Architects/builder With Sound Xperience by segcymoor(m): 1:00pm On Jul 15, 2011
site works,

Re: Profile Of An Architects/builder With Sound Xperience by segcymoor(m): 9:37am On Jul 19, 2011
We set to serve u better!
Re: Profile Of An Architects/builder With Sound Xperience by Nobody: 11:28am On Jul 19, 2011
hi,
are you looking for an interior design company to work with your projects?if you are contact me on my email fem_ash@msn.com
Femi
Re: Profile Of An Architects/builder With Sound Xperience by segcymoor(m): 3:52pm On Jul 22, 2011
i will send to u when necessary
Re: Profile Of An Architects/builder With Sound Xperience by segcymoor(m): 12:58pm On Jul 23, 2011
we set to serve u better,
Re: Profile Of An Architects/builder With Sound Xperience by segcymoor(m): 5:27pm On Jul 25, 2011
Call us , for ur next project
Re: Profile Of An Architects/builder With Sound Xperience by segcymoor(m): 4:23pm On Jul 27, 2011
We set to serve u better,
Re: Profile Of An Architects/builder With Sound Xperience by segcymoor(m): 8:16pm On Jul 31, 2011
We set to serve u better
Re: Profile Of An Architects/builder With Sound Xperience by segcymoor(m): 1:02pm On Aug 02, 2011
We set to serve u better,
Re: Profile Of An Architects/builder With Sound Xperience by segcymoor(m): 4:41pm On Aug 12, 2011
We set to serve u better!
Re: Profile Of An Architects/builder With Sound Xperience by segcymoor(m): 1:30pm On Aug 16, 2011
We set to serve u better!
Re: Profile Of An Architects/builder With Sound Xperience by ekinmogun: 3:19pm On Aug 16, 2011
segcy.moor, can you help me estimate the cost of putting up a fence in lekki phase 2? The land is not marshy and it is already fenced on one side. The other three sides are. length-40.14m and the two breadth are -25m each. What a builder is quoting for me seems to be on a high side.
Re: Profile Of An Architects/builder With Sound Xperience by segcymoor(m): 6:55pm On Aug 16, 2011
I will get back to u soon!
Re: Profile Of An Architects/builder With Sound Xperience by segcymoor(m): 12:47pm On Aug 19, 2011
QUOTATION FOR PERMANENT 1000 SQM FENCE WALL(10m height)

MATERIAS FOR BLOCK:
(1) 9’’ Blocks……………………10,980 pcs @ #180 each = #1,976,400:00
(2) Cement for Brick setting……. 169 pcs @#2,000 each = #33,800:00
(3) Sharp sand …………… 4 load of 20 tons @ 60,000 each = #240,000:00

MATERIA FOR CONCRETE BASE RE-ENFORCEMENT:

(1)Granite 2 load of 30 tons @ #180,000:00 each = # 360,000:00
(2) Sharp Sand 4 load of 20 tons @ 60,000:00 each = # 240,000:00
(3) Cement for blinding 24 pcs @ #2000 = # 48,000:00
(4) Cement for columns and raft base 480 pcs @ #2,000 each = # 960,000:00
(5) Planks 1 by 4 by 12 white wood 150pcs @ #650 each = # 97,500:00
(6) wood 2 by 3 and 3 by 4 for bracing 80 pcs @#300 each = # 24,000:00
(7) Nails 2 by 3 and 3 by 4 :4 bags @ 6,000:00 each = # 24,000:00
(cool Binding wire for carpenter 1 roll @ 6,000:00 each = # 6,000:00
(9) IRON: Y10 = 67pcs @ #1,500 each =# 100,500:00
Y12 = 2 TONS @ #180,000 each = # 360,000:00
(10) Biding Wire for iron bending : 2 roll @ # 6,000:00 each = # 12,000:00
(11)Renting of Vibrator ………………………………………. = # 15,000:00
(12) Renting of concreate mixer ………………………………. = # 60,000:00
DIGING OF WELL: Sinking 6 rings @ #5,000 each = #30,000:00
Purchase of 6 rings @ #6,000:00 each =# 36,000:00
TOTAL OF MATERIAL: # 4,623,200:00
LABOUR:
(1) EXCAVATION ……………………… # 50,000:00
(2) BLINDING ……………………………. # 30,000:00
(3) BRICK LAYING ……………………… # 380,100:00
(4) CONCREATE RAFT BASE AND COLUMS # 150,000:00
(5) CARPENTER ……………………………… # 120,000:00
(6) IRON BENDER ……………………………. # 150,000:00
TOTAL OF LABOR # 880,000:00

The quatation is prepare base on solid fence that we gunratee u standing for decades. You may need to compare it and get back to us i neccessary.
Thanks
Re: Profile Of An Architects/builder With Sound Xperience by ekinmogun: 2:38pm On Aug 19, 2011
Old boy, 10000 blocks and more than 5million naira total cost?
Re: Profile Of An Architects/builder With Sound Xperience by chuka2003(m): 6:50pm On Aug 19, 2011
what's the developer fee for building a 3 bedroom bungalow,
Re: Profile Of An Architects/builder With Sound Xperience by segcymoor(m): 7:25pm On Aug 21, 2011
@Chuka, i think u mean supervision fees, I can collect 150k provided is within Lagos
Re: Profile Of An Architects/builder With Sound Xperience by luluxiu: 4:20am On Aug 22, 2011
I can help estimate the Leckie Phase 2 of a fence cost? Land is not squishy, ​​it has been in the side of the fence. The other three sides. - 25M length of 40.14 m each and two breadth.
Re: Profile Of An Architects/builder With Sound Xperience by segcymoor(m): 11:59am On Aug 22, 2011
Bros. I advise u go ur Engineer. fence in lekki requires careful attetion if u dont want to take risk.As u can see i dont intend to buy materials for u.
Thanks and Best Regards
Re: Profile Of An Architects/builder With Sound Xperience by segcymoor(m): 2:14pm On Aug 25, 2011
We set to serve u better!
Re: Profile Of An Architects/builder With Sound Xperience by segcymoor(m): 5:10pm On Aug 26, 2011
Call us today!
Re: Profile Of An Architects/builder With Sound Xperience by Fhemmmy: 12:08am On Aug 27, 2011
Not bad . .
Re: Profile Of An Architects/builder With Sound Xperience by Aventures(m): 12:24pm On Aug 27, 2011
Fence estimate: let;s go tha way of QS style and see rough estimate idea;
1. Block work: The perimeter lent is abt 90.14m say 91m. Then average height of the fence should be 2.4m max. Then the total block arrea in sqm is 218.4 let say 220 sqm to allow for wastage.
2. Concrete for raft: raft inverted T beam Dimension for the raft stem (0.15 x 0.675) the I beam (0.23 x 0.6) Note the total height asumed here is 750mm i:e 0.75 m it could be more or less than this in some cases depending on the diff. btw ur site level and the road. Now the area in sqm is (0.101) + (0.138) = 0.239 now the Volume of the concrte is 0.239 * 91 = 21.79 cum say 23 cum to allow for shrinkage and wastage. column: 0.23 x 023 x2.4 x 32 = 4.1 cum Total 27cum
3. Formwork: Raft beam 91 x0.6x 2= 109 say 110 sqm. Columns 32 x 1 x 2.4 = 76.8 Total formwrk =190 sqm
4. Reinforcment: Raft Inverted beam-- 10-12mm = 13kg/m run :. 91 x 13 = 1183 kg of iron. Th columns- 18.87kg/column (total no columns 91/3 + 1= say 32) so: 18.87 x 32= 603.84 say 605kg 0f iron Total iron =1788Kg
S/N Description qty unit Rate Amt
1 Block wrk 220 sqm 2600 572,000
2 concrete 27 cum 25000 675,000
3. formwork 190 sqm 2 400 456,000
4. reinforcement 1788 kg 250 447,000

total 2,150,000
This is just a rough estimate which exclude Gate columns and the gate, coping, rendering and unforseen contigency.
The estimate of this kind takes care of the materia;l labour and contractor's profit.
Re: Profile Of An Architects/builder With Sound Xperience by Aventures(m): 7:23pm On Aug 27, 2011
Fence estimate: let;s go tha way of QS style and see rough estimate idea;
1. Block work: The perimeter lent is abt 90.14m say 91m. Then average height of the fence should be 2.4m max. Then the total block arrea in sqm is 218.4 let say 220 sqm to allow for wastage.
2. Concrete for raft: raft inverted T beam Dimension for the raft stem (0.15 x 0.675) the I beam (0.23 x 0.6) Note the total height asumed here is 750mm i:e 0.75 m it could be more or less than this in some cases depending on the diff. btw your site level and the road. Now the area in sqm is (0.101) + (0.138) = 0.239 now the Volume of the concrte is 0.239 * 91 = 21.79 precipitate say 23 precipitate to allow for shrinkage and wastage. column: 0.23 x 023 x2.4 x 32 = 4.1 precipitate Total 27cum
3. Formwork: Raft beam 91 x0.6x 2= 109 say 110 sqm. Columns 32 x 1 x 2.4 = 76.8 Total formwrk =190 sqm
4. Reinforcment: Raft Inverted beam-- 10-12mm = 13kg/m run :. 91 x 13 = 1183 kg of iron. Th columns- 18.87kg/column (total no columns 91/3 + 1= say 32) so: 18.87 x 32= 603.84 say 605kg 0f iron Total iron =1788Kg
S/N Description qty unit Rate Amt
1 Block wrk 220 sqm 2600 572,000
2 concrete 27 precipitate 25000 675,000
3. formwork 190 sqm 2 400 456,000
4. reinforcement 1788 kg 250 447,000

total 2,150,000
This is just a rough estimate which exclude Gate columns and the gate, coping, rendering and unforseen contigency.
The estimate of this kind takes care of the materia;l labour and contractor's profit
Re: Profile Of An Architects/builder With Sound Xperience by Aventures(m): 9:57pm On Aug 27, 2011
Fence estimate: let;s go tha way of QS style and see rough estimate idea;
1. Block work: The perimeter lent is abt 90.14m say 91m. Then average height of the fence should be 2.4m max. Then the total block arrea in sqm is 218.4 let say 220 sqm to allow for wastage.
2. Concrete for raft: raft inverted T beam Dimension for the raft stem (0.15 x 0.675) the I beam (0.23 x 0.6) Note the total height asumed here is 750mm i:e 0.75 m it could be more or less than this in some cases depending on the diff. btw your site level and the road. Now the area in sqm is (0.101) + (0.138) = 0.239 now the Volume of the concrte is 0.239 * 91 = 21.79 precipitate say 23 precipitate to allow for shrinkage and wastage. column: 0.23 x 023 x2.4 x 32 = 4.1 precipitate Total 27cum
3. Formwork: Raft beam 91 x0.6x 2= 109 say 110 sqm. Columns 32 x 1 x 2.4 = 76.8 Total formwrk =190 sqm
4. Reinforcment: Raft Inverted beam-- 10-12mm = 13kg/m run :. 91 x 13 = 1183 kg of iron. Th columns- 18.87kg/column (total no columns 91/3 + 1= say 32) so: 18.87 x 32= 603.84 say 605kg 0f iron Total iron =1788Kg
S/N Description qty unit Rate Amt
1 Block wrk 220 sqm 2600 572,000
2 concrete 27 precipitate 25000 675,000
3. formwork 190 sqm 2 400 456,000
4. reinforcement 1788 kg 250 447,000

total 2,150,000
This is just a rough estimate which exclude Gate columns and the gate, coping, rendering and unforseen contigency.
The estimate of this kind takes care of the materia;l labour and contractor's profit
Re: Profile Of An Architects/builder With Sound Xperience by Aventures(m): 1:18pm On Aug 28, 2011
Fence estimate: let;s go tha way of QS style and see rough estimate idea;
1. Block work: The perimeter lent is abt 90.14m say 91m. Then average height of the fence should be 2.4m max. Then the total block arrea in sqm is 218.4 let say 220 sqm to allow for wastage.
2. Concrete for raft: raft inverted T beam Dimension for the raft stem (0.15 x 0.675) the I beam (0.23 x 0.6) Note the total height asumed here is 750mm i:e 0.75 m it could be more or less than this in some cases depending on the diff. btw your site level and the road. Now the area in sqm is (0.101) + (0.138) = 0.239 now the Volume of the concrte is 0.239 * 91 = 21.79 precipitate say 23 precipitate to allow for shrinkage and wastage. column: 0.23 x 023 x2.4 x 32 = 4.1 precipitate Total 27cum
3. Formwork: Raft beam 91 x0.6x 2= 109 say 110 sqm. Columns 32 x 1 x 2.4 = 76.8 Total formwrk =190 sqm
4. Reinforcment: Raft Inverted beam-- 10-12mm = 13kg/m run :. 91 x 13 = 1183 kg of iron. Th columns- 18.87kg/column (total no columns 91/3 + 1= say 32) so: 18.87 x 32= 603.84 say 605kg 0f iron Total iron =1788Kg
S/N Description qty unit Rate Amt
1 Block wrk 220 sqm 2600 572,000
2 concrete 27 precipitate 25000 675,000
3. formwork 190 sqm 2 400 456,000
4. reinforcement 1788 kg 250 447,000

total 2,150,000
This is just a rough estimate which exclude Gate columns and the gate, coping, rendering and unforseen contigency.
The estimate of this kind takes care of the materia;l labour and contractor's profit
Re: Profile Of An Architects/builder With Sound Xperience by proptmart: 1:30pm On Aug 28, 2011
Fence estimate: let;s go tha way of QS style and see rough estimate idea;
1. Block work: The perimeter lent is abt 90.14m say 91m. Then average height of the fence should be 2.4m max. Then the total block arrea in sqm is 218.4 let say 220 sqm to allow for wastage.
2. Concrete for raft: raft inverted T beam Dimension for the raft stem (0.15 x 0.675) the I beam (0.23 x 0.6) Note the total height asumed here is 750mm i:e 0.75 m it could be more or less than this in some cases depending on the diff. btw your site level and the road. Now the area in sqm is (0.101) + (0.138) = 0.239 now the Volume of the concrte is 0.239 * 91 = 21.79 precipitate say 23 precipitate to allow for shrinkage and wastage. column: 0.23 x 023 x2.4 x 32 = 4.1 precipitate Total 27cum
3. Formwork: Raft beam 91 x0.6x 2= 109 say 110 sqm. Columns 32 x 1 x 2.4 = 76.8 Total formwrk =190 sqm
4. Reinforcment: Raft Inverted beam-- 10-12mm = 13kg/m run :. 91 x 13 = 1183 kg of iron. Th columns- 18.87kg/column (total no columns 91/3 + 1= say 32) so: 18.87 x 32= 603.84 say 605kg 0f iron Total iron =1788Kg
S/N Description qty unit Rate Amt
1 Block wrk 220 sqm 2600 572,000
2 concrete 27 precipitate 25000 675,000
3. formwork 190 sqm 2 400 456,000
4. reinforcement 1788 kg 250 447,000

total 2,150,000
This is just a rough estimate which exclude Gate columns and the gate, coping, rendering and unforseen contigency.
The estimate of this kind takes care of the materia;l labour and contractor's profit
Re: Profile Of An Architects/builder With Sound Xperience by segcymoor(m): 6:22pm On Aug 29, 2011
thanks , papa international dealer!

(1) (2) (Reply)

Serviced Plots For Sale At Townsville Estate, Lakowe, Ibeju Lekki! / Invest in land gives more than Financial Return(freedom Is Life)valentine Promo / Ibadan,bodija: New Four-bedroom Duplex For Sale

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)