Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,148,673 members, 7,801,942 topics. Date: Friday, 19 April 2024 at 06:34 AM

Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 - Properties - Nairaland

Nairaland Forum / Nairaland / General / Properties / Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 (14118 Views)

Construction Of Mini Bakery/ Office Space By Rotech77 / Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 / The Finishing Of Osun State Edifice By Rotech77 (2) (3) (4)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (12) (Reply) (Go Down)

Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 10:22pm On Apr 01, 2021
Officially Opened
We gives thanks to Almighty God for giving us this project to handle.
We also thank the, client, Nl members, our esteemed clients, viewers, etc.

Project brief
We are to design and build
- A contemporary eatery with executive pent house
-6units of flats.(2 bedrooms flat 4 units and mini flats 2units)
Both from design stage to finishing stage.(hand over of key)

Contractor ;Arbor contractor Ltd (Rotech77)
Client; NL by associate
Location ;Center of excellence
Duration;25 weeks
Contact : 08066619493 call/whatzap

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 10:28pm On Apr 01, 2021
What to expect from us here

- cost of materials
- cost of project stages
- some construction idea
- question and answer
Etc







Week1-2
-Clearing of the site
- site hoarding
- bore hole drilling
- setting out of the building plan

1 Like

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 10:33pm On Apr 01, 2021
Cost of drilling bore hole
200k ..... 150ft

Cost of setting out materials =45,000
settlement of street guys/ Omonile 100,000
Excavation of the two building fdn 180k

Cont”

Loading..,
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 6:25am On Apr 02, 2021
Excavation in progress
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 11:42am On Apr 02, 2021
We speak less
We believed in action
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 5:32pm On Apr 02, 2021
Excavation in progress



Arbo contractor Ltd

1 Share

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 7:10pm On Apr 02, 2021
We have 2 weeks for excavation of trenches and columns pit of the two building.

More update coming soon
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 4:50am On Apr 03, 2021
Men at work

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by folmus: 10:20am On Apr 03, 2021
following
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 10:24am On Apr 03, 2021
folmus:
following

Thanks for your time here chief

Questions are welcome here
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by Henix(m): 2:53pm On Apr 03, 2021
Kudos!
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 4:21pm On Apr 03, 2021
Henix:
Kudos!

Thanks so much sir.

As I said we believed much in action
“Less talk more action”
While excavation of the eatery is going on we are setting out the residential building plan on one side to meet up with our work program.

Eatery foundation almost done, we are shifting to residential building foundation by Monday.

Thanks you all your time here.

Arbo contractor Ltd (Rotech)

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 4:57pm On Apr 03, 2021
Could you believed that, the plant we used here to demolished the existing building and excavation of top soil cost only N90k

When we contacted direct laborers to see how to save cost we realized that by using them( laborers) it will slow the time of work ( like 1 weeks) and the cost is:

3500 *10( workers) a day=35,000
35,000*7Days=245,000
(Demolition, packing, top soil remover)

Boom we go for the plant ( bulldozer) 90k

245,000-90,000=155,000

We save N155,000 for the client.( we just add only 25k

The money saved here now used for the whole 2 building foundation excavation N150,000

3 Likes

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by mufutau55(m): 6:28pm On Apr 03, 2021
rotecch77:

Thanks so much sir.

As I said we believed much in action
“Less talk more action”
While excavation of the eatery is going on we are setting out the residential building plan on one side to meet up with our work program.

Eatery foundation almost done, we are shifting to residential building foundation by Monday.

Thanks you all your time here.

Arbo contractor Ltd (Rotech)

My Oga on duty o. Very good work.
But dont let @Egunmogaji2 see that your She Engineer o.
Keep up the good work Sir.

Hajji M.

1 Like

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by EgunMogaji2: 6:36pm On Apr 03, 2021
mufutau55:


My Oga on duty o. Very food work.
But dont let @Egunmogaji2 see that your She Engineer o.
Keep up the good work Sir

Hajji M.

I’ve not fully forgotten kolashangone for successfully shielding her engineer from us back then grin
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by mufutau55(m): 6:43pm On Apr 03, 2021
EgunMogaji2:

I’ve not fully forgotten kolashangone for successfully shielding her engineer from us back then grin

Poor Kolashangone... that Engineer probably has five kids by now. I mentioned it to him few days back. smiley

Hajji M.

1 Like

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 6:58pm On Apr 03, 2021
mufutau55:


My Oga on duty o. Very food work.
But dont let @Egunmogaji2 see that your She Engineer o.
Keep up the good work Sir.

Hajji M.

Baba Agbalagba sir,
Babs. Egunmogaji Don retired from woman stuff..lolz. Agba tii de

2 Likes

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 6:58pm On Apr 03, 2021
EgunMogaji2:


I’ve not fully forgotten kolashangone for successfully shielding her engineer from us back then grin

Lolz

1 Like

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by EgunMogaji2: 7:30pm On Apr 03, 2021
rotecch77:


Baba Agbalagba sir,
Babs. Egunmogaji Don retired from woman stuff..lolz. Agba tii de

Emi o dagba malabe, egungun eran ni kan ni mi ole san grin
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 7:58pm On Apr 03, 2021
EgunMogaji2:


Emi o dagba malabe, egungun eran ni kan ni mi ole san grin


Haaa, baba agbalagba , nothings do you sir, may you live long.

3 Likes

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 7:30am On Apr 04, 2021
Today is rest day for workers,
Tomorrow work continue

More pics update will be uploaded here, watch out!

1 Like

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by bayo2018: 12:58pm On Apr 04, 2021
rotecch77:
Today is rest day for workers,
Tomorrow work continue

More pics update will be uploaded here, watch out!

How many plot of land is that and what’s the dimension Bossun

1 Like

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 3:49pm On Apr 04, 2021
bayo2018:


How many plot of land is that and what’s the dimension Bossun

The land measured about 950 meters square
(1 and 1/2 plot of land )

1 Like

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 7:31pm On Apr 04, 2021
Warming up for tomorrow work.
Watch out!

1 Like

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by EgunMogaji2: 7:43pm On Apr 04, 2021
rotecch77:
Warming up for tomorrow work.
Watch out!

My brother I'm watching.

I'm waiting to sell my personal house before I start the new one (no personal interest in owning two private homes). So until then I'm living through you guys doing duplex builds. Also learning and taking notes.

Thanks for sharing.
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 10:40am On Apr 05, 2021
EgunMogaji2:


My brother I'm watching.

I'm waiting to sell my personal house before I start the new one (no personal interest in owning two private homes). So until then I'm living through you guys doing duplex builds. Also learning and taking notes.

Thanks for sharing.

I like your idea of having only one personal house in same location ,why do someone need 2 personal house in same city, it’s better to have one and many commercial building

1 Like

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 11:30am On Apr 05, 2021
CONTEMPORARY DESIGN

Unlike modern design, contemporary design doesn't refer to a specific period of time—it's constantly evolving to reflect the popular styles of present day design. It borrows qualities from modernism, minimalism, Art Deco, and other global styles, without hyper-focusing on any one in particular. Though contemporary design is, by nature, fairly ambiguous, there are a few qualities that help define the contemporary style. Neutral palettes, stark minimalism, clean lines, and organic silhouettes are some of the prominent characteristics. You can expect to see materials including nickel, steel, and chrome, combined with natural textures like hemp or jute.

Culled from internet
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 12:25pm On Apr 05, 2021
Second building trench excavation is in progress.
We have about 2000 blocks already on ground,
And more block production is going on.

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 7:24pm On Apr 05, 2021
Still on 1st week of the project and we have covered 80pec of work programmed for 2 weeks
“Guys are not smiling here”
We are targeting 22weeks to finished up the job, although we agreed for 25weeks to deliver the job.
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 5:52pm On Apr 06, 2021
Introducing burning rod here into the trench

-also the blinding and short columns for the eatery section done.

Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 8:38am On Apr 07, 2021
As I said we believed in action
“More action less talk”

Foundation block setting will commence today
For the eatery section.
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by EgunMogaji2: 8:54am On Apr 07, 2021
rotecch77:
Introducing burning rod here into the trench

-also the blinding and short columns for the eatery section done.

Please what’s a burning rod?

Can I do a site visit? I want to see something.

Walahi my intentions are pure. wink

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (12) (Reply)

Quality And Affordable Paints From FINECOAT PAINTS. / Cost Of Building Twins 2 Bedroom Flat / COVID-19: Cash-strapped Tenants Face Ejection

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 26
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.