Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,143,427 members, 7,781,245 topics. Date: Friday, 29 March 2024 at 11:12 AM

PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI - Properties (6) - Nairaland

Nairaland Forum / Nairaland / General / Properties / PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI (52894 Views)

Construction Process Of A 6 Flats (3 Bedrooms House) / ABUJA:CONSTRUCTION PROCESS OF TERRACE BUILDING BY MOORE / Construction Process Of The 3 Bedroom Block Of Four Flats In Warri (2) (3) (4)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (43) (Reply) (Go Down)

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:21pm On Aug 18, 2015
Block work in progress!

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 1:08pm On Aug 19, 2015
segcymoor:
Block work in progress!

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by twinskenny(m): 1:14pm On Aug 19, 2015
[quote author=segcymoor post=37118190][/quote] weldone boss
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by semitunde: 4:25pm On Aug 19, 2015
[quote author=segcymoor post=37118190][/quote]

What you have here is like a process that I like. It makes a building look good and well done. Its about having your columns done first and then doing your blockwall after it, then do your lintels and next floor beams and slabs. With this system, you take control of the straightness of your walls from the bricklayers and this reduces errors.

Its almost like doing a framed structure type of construction but just a little different. Its not as expensive as using a framed structure process.

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:31pm On Aug 19, 2015
semitunde:

What you have here is like a process that I like. It makes a building look good and well done. Its about having your columns done first and then doing your blockwall after it, then do your lintels and next floor beams and slabs. With this system, you take control of the straightness of your walls from the bricklayers and this reduces errors.
Its almost like doing a framed structure type of construction but just a little different. Its not as expensive as using a framed structure process.
on point!

1 Like

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by twinskenny(m): 9:11am On Aug 20, 2015
semitunde:


What you have here is like a process that I like. It makes a building look good and well done. Its about having your columns done first and then doing your blockwall after it, then do your lintels and next floor beams and slabs. With this system, you take control of the straightness of your walls from the bricklayers and this reduces errors.

Its almost like doing a framed structure type of construction but just a little different. Its not as expensive as using a framed structure process.

I really want to contact you sir... hope u can provide me with your contact information. Thank you
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 4:52pm On Aug 20, 2015
Men at Work!

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:31pm On Aug 20, 2015
segcymoor:
Men at Work!

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by semitunde: 9:44pm On Aug 20, 2015
twinskenny:


I really want to contact you sir... hope u can provide me with your contact information. Thank you

You do windows or roofs is it? I usually call those on here who I have their details or who are referred by others here. I'll call when the chance presents itself.

I'm just the project manager, not the owner. Subcontracting can sometimes be like a cult thing, where the only way another gets in is if the first on fails on delivery or quality. You'll be kept in view for that time.

Besides, I've knocked quite a few heads on politics section and I won't want my pics becoming a trending topic here grin
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by twinskenny(m): 6:29am On Aug 21, 2015
semitunde:


You do windows or roofs is it? I usually call those on here who I have their details or who are referred by others here. I'll call when the chance presents itself.

I'm just the project manager, not the owner. Subcontracting can sometimes be like a cult thing, where the only way another gets in is if the first on fails on delivery or quality. You'll be kept in view for that time.

Besides, I've knocked quite a few heads on politics section and I won't want my pics becoming a trending topic here grin

Lol.u are good sir..


Am into low voltage per say... and I.have various thread too.

Cctv

Access control

Satellite tv distribution

Voice.and data

Multimedia

Thank you sir

1 Like

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 5:50pm On Aug 21, 2015
Still. ...........on block setting

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 6:52pm On Aug 22, 2015
Up next : casting to column
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 2:12pm On Aug 23, 2015
Happy Sunday
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 4:47pm On Aug 24, 2015
segcymoor:
Men at Work!

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:07am On Aug 25, 2015
Formwork in progress!

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 12:12pm On Aug 26, 2015
Casting to column in progress!
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:56pm On Aug 26, 2015
segcymoor:
Casting to column in progress!
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 3:26pm On Aug 27, 2015
All things be equal. We should commence working on next slab by next week
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:23pm On Aug 28, 2015
Completion of casting columns and lintel

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:14pm On Aug 29, 2015
Update : Taking level
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by lucabrasi(m): 2:43am On Aug 30, 2015
segcymoor:
Update : Taking level
pls what email can i reach you on for matters regarding business
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by twinskenny(m): 7:40am On Aug 30, 2015
segcymoor:
Update : Taking level
happy sunday my oga
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:55am On Aug 30, 2015
lucabrasi:
pls what email can i reach you on for matters regarding business
mooredesignbuild@gmail.com
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by Dominionng(m): 8:34am On Aug 30, 2015
semitunde:


What you have here is like a process that I like. It makes a building look good and well done. Its about having your columns done first and then doing your blockwall after it, then do your lintels and next floor beams and slabs. With this system, you take control of the straightness of your walls from the bricklayers and this reduces errors.

Its almost like doing a framed structure type of construction but just a little different. Its not as expensive as using a framed structure process.

Boss. Do go check my signature for ceiling works. Kind regards....
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:38pm On Aug 30, 2015
twinskenny:
happy sunday my oga
Same here.
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 2:01pm On Sep 01, 2015
Formwork:Curing enough to remove
..we are able to achieve strong and neat concrete

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 4:12pm On Sep 02, 2015
Formwork in progress

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:11am On Sep 03, 2015
Target:we schedule to cast this slab less than weeks away
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:23pm On Sep 04, 2015
segcymoor:
Target:we schedule to cast this slab less than weeks away
Formwork almost completed. ...bending schedule in progress
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 4:23pm On Sep 07, 2015
Reinforcement work in progress
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by erico2k2(m): 5:22pm On Sep 07, 2015
segcymoor:
Reinforcement work in progress
Oga I site you ooh
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 6:22pm On Sep 07, 2015
erico2k2:

Oga I site you ooh
where?

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (43) (Reply)

Share Your Face Me I Face You Experience. / Dairy Of My 3 Bedrooms Flat( All En-suit) / Jos Building Collapse: Before And After Photos

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 26
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.