Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,143,645 members, 7,782,107 topics. Date: Saturday, 30 March 2024 at 09:33 AM

10MW Tiga, Kano Hydro Switchyard In Progress. Pix - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / 10MW Tiga, Kano Hydro Switchyard In Progress. Pix (21825 Views)

Pictures Of Zungeru Hydro Electric Power Project To Be Commissioned This Year / Photos From The Construction Of Zungeru hydro-Power Project / Umahi Completes 5th Flyover In Ebonyi, 4 Others In Progress (Photos) (2) (3) (4)

(1) (2) (3) (Reply) (Go Down)

10MW Tiga, Kano Hydro Switchyard In Progress. Pix by NafeesaAA(f): 7:51pm On May 24, 2018
10MW Tiga, Kano Hydro Switchyard in Progress.

9 Likes 2 Shares

Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by NafeesaAA(f): 7:57pm On May 24, 2018
grin

3 Likes

Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by Kyase(m): 8:04pm On May 24, 2018
Kano Kano grin.
Good one.

16 Likes 2 Shares

Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by SalamRushdie: 8:07pm On May 24, 2018
I have been to Tiga dam in the past and I doubt if that dam has sufficient catchment coefficient to deliver sustained hydro power to the turbines like what happened in the akosombo dam ..

28 Likes 4 Shares

Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by hisgrace090: 8:16pm On May 24, 2018
The only thing I frowned at is sharing of public fund, no project is too small.

Una well don't!

7 Likes

Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by Yoruba4Life: 9:23pm On May 24, 2018
IPOB Miscreants right now... grin

46 Likes 6 Shares

Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by Anijay1212(m): 9:24pm On May 24, 2018
smiley
Good one
Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by Anijay1212(m): 9:24pm On May 24, 2018
Ground no level atol, who go buy this space very cheap.
Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by deji17: 9:24pm On May 24, 2018
Na so o

What you see is what you get. Those who paid lips service to development for 16 good years are the first to call any current developmental stride, propaganda. God know una address...

85 Likes 9 Shares

Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by hillsiderfak(m): 9:26pm On May 24, 2018
somebody go don thief big money like that.

3 Likes 2 Shares

Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by Yoruba4Life: 9:26pm On May 24, 2018
Wetin Aboki dey use electricity dey do sef? undecided

3 Likes 2 Shares

Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by Premiumwriter: 9:26pm On May 24, 2018
hisgrace090:
The only thing I frowned at is sharing of public fund, no project is too small.

Una well don't!
erm what's the meaning of well don't
Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by LORDVEST(m): 9:26pm On May 24, 2018
Kano Yaro
Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by MDsambo: 9:26pm On May 24, 2018
SalamRushdie:
I have been to Tiga dam in the past and I doubt if that dam has sufficient catchment coefficient to deliver sustained hydro power to the turbines like what happened in the akosombo dam ..

Just from their comments, you go know dem

45 Likes 3 Shares

Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by CodeTemplar: 9:26pm On May 24, 2018
See kano putting ND wealth to good use while the ND celebrate mediocrity.

12 Likes

Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by ariesbull: 9:26pm On May 24, 2018
SalamRushdie:
I have been to Tiga dam in the past and I doubt if that dam has sufficient catchment coefficient to deliver sustained hydro power to the turbines like what happened in the akosombo dam ..

Bros break this English down...is that a river or a stream?

21 Likes 2 Shares

Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by brightisodje(m): 9:28pm On May 24, 2018
everyday stories useless politician can't u solve this light problem for once animals
Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by deji17: 9:30pm On May 24, 2018
Where is the Power: We asked Obasanjo for power, he said we should plug to page 41, volume 3 of his book.

40 Likes 2 Shares

Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by aking123(m): 9:30pm On May 24, 2018
I love this, but the problem of Nigeria has always been foot-dragging and when completed, maintenance. I just hope it won't be like our refineries which backed up.
Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by igahdavid(m): 9:31pm On May 24, 2018
deji17:
Na so o

What you see is what you get. Those who paid lips service to development for 16 good years are the first to call any current developmental stride propaganda. God know una address...

GOD bless you my brother

I have friends who ply that Onitsha Enugu Express way and still don't want to believe that this government is working.

You need to see the quality of the works going on in Enugu Portharcourt Express way too.

Gone are the days when we use to go from Okigwe through Mbano or Owerri to Umuahia because Okigwe to Umuahia was not motorable.

Few months ago, I left Uyo by 4:30pm and was in Enugu by 7:30pm.

Good roads are gradually coming to South East

GOD Bless Nigeria

#NoToRefurbishedPoliticians
#YesToFreshIdeas

48 Likes 7 Shares

Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by Nobody: 9:33pm On May 24, 2018
Nice one

1 Like

Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by myettiallah: 9:33pm On May 24, 2018
Yoruba4Life:
IPOB Miscreants right now... grin
fool, what has Ipob gat to do with Tiga dam in kano,..u cant say something without mentioning ipob

3 Likes

Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by deji17: 9:35pm On May 24, 2018
igahdavid:


GOD bless you my brother

God bless you too my brother..

2 Likes 1 Share

Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by Nobody: 9:36pm On May 24, 2018
nice

1 Like

Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by englishmart(m): 9:37pm On May 24, 2018
only 10mw and people are celebrating?

6 Likes 1 Share

Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by Guyman02: 9:39pm On May 24, 2018
SalamRushdie:
I have been to Tiga dam in the past and I doubt if that dam has sufficient catchment coefficient to deliver sustained hydro power to the turbines like what happened in the akosombo dam ..

It may be operated according to the quantity of water available. In the rainy season they can operate at full capacity while during the dry season they run at 50%.
Another solution will be water reticulation which means pumping back used water upstream but that will require a lot of power also to operate the suction pumps

12 Likes 1 Share

(1) (2) (3) (Reply)

Governor Wike Imposes 24 Hours Curfew On Some Parts Of Rivers State / Samaila Suleiman Resigns From APC, Defects To PDP / Sanwo-Olu Recites Muslim Surah Fatiha At An Event In Lagos (Video)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 18
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.