Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work (14195 Views)

David Umahi Inspects The Abuja-Kaduna-Kano Road / FG Sets Dates For Completion Of Lagos-Ibadan, Abuja-Kano Expressway / Abuja-Kano Road: PDP Calls For Review Of ₦2.12 Billion Per Kilometre Cost (2) (3) (4)

(1) (2) (Reply) (Go Down)

Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by iwaeda: 11:31pm On Nov 20, 2020
Minister of Works and Housing, Mr Babatunde Fashola, SAN, has explained that one of the reasons for the delay in the construction of the Abuja-Kaduna-Zaria-Kano dual carriageway was the request made by some members of the National Assembly to expand the road from two lanes to three lanes.

A statement from the Ministry of Works’ Deputy Director Press and Public Relations, Boade Akinola, quoted Fashola as saying this at the town hall meeting of stakeholders organised by the Federal Ministry of Works and Housing held in the Kaduna State University Conference Hall, Kaduna.

The statement issued on Friday was titled, ‘FG Reiterates Commitment to Completing Abuja-Kaduna-Zaria -Kano Dual Carriageway’.

Fashola also reiterated the commitment of the Federal Government to completing the ongoing reconstruction of the Abuja-Kaduna-Zaria-Kano dual carriageway.

Responding to various questions from stakeholders who wanted to know why the construction work on the road was taking too long, the minister was quoted as saying, “Shortly after we flagged off the road, we received a letter from the Senators in the National Assembly asking the Federal Government to expand the road from two lanes to three lanes, that was not from us, it was from the National Assembly, the Senators and they wrote to the President and copied my Ministry.”

Explaining further, Fashola stated that based on the directive from the Presidency to undertake that expansion, “we needed to redesign an expansion to accommodate about 40 different bridges on this road to align with the lanes.

“So if they are going to expand from two to three lanes, a new design needed to be created. The process for doing that required us to hire a design consultant. We had to follow the procurement process established by the National Assembly.”

He said, “The procurement process is a long one which entails advertising, waiting for a period of six weeks after advertisement, reviewing of tender, picking of consultant and going to the Bureau for Public Procurement and finally to the Federal Executive Council for approval to hire a consultant to do the design requested.”

The Minister also disclosed that after going through all the processes of procurement for redesigning to three lanes the Ministry received another instruction to revert back to two lanes due to paucity of fund.

Fashola also attributed the delay in completion to the total length of the road and the process of construction.

He added, “Each Lane is 375km. So if you multiply that by four, we are building a thousand and five hundred kilometres of highway. No matter how hard you tried to work, if there was 25 hours in one day to do this work, we will commit to it, but the truth is that materials take time to react, minimum and maximum processes must be observed.”


https://punchng.com/abuja-kano-road-fashola-blames-senators-request-for-slow-pace-of-work/

4 Likes

Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by Golan007: 11:42pm On Nov 20, 2020
They decided to convert it from 2 lanes to 3 yet expect the project to take the same time.

11 Likes

Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by Moferere: 11:45pm On Nov 20, 2020
Golan007:
They decided to convert it from 2 lanes to 3 yet expect the project to take the same time.

Continue making excuses for failure.

Na 2021 cover am.

2022 na campaign year, we dey wait to hear wetin una want talk.

undecided

39 Likes 1 Share

Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by dele1727: 11:56pm On Nov 20, 2020
Moferere:


Continue making excuses for failure.

Na 2021 cover am.

2022 na campaign year, we dey wait to hear wetin una want talk.

undecided


Why don't you counter with fact?

23 Likes 3 Shares

Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by Moferere: 12:19am On Nov 21, 2020
Why don't you counter with fact?
What fact do you want?
How you want a project of 2 lanes to have same contract completion period as 3 lanes. Just counter it and let's share in your vast knowledge

The king can do no wrong

Halleluyah boys.

What you are doing is sycophancy

7 Likes

Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by inoki247: 12:25am On Nov 21, 2020
This people na Saraki dem dey blame before now dere puppet don dey dere dey ar still blaming...

With the way dey were blaming Saraki den u will think after is gone Nigeria will turn Eldorado, Ibadan Express way will become reality...

all of u are d same..

Electricity is not a rocket science Mr Fashola when you b Minister of Power y u no see 247 light give us...

24 Likes 2 Shares

Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by Officialgarri: 12:33am On Nov 21, 2020
dele1727:



Why don't you counter with fact?
Exactly what I was about to type.

Someone made a point that looks valid, if you feel he's wrong, then simply prove him wrong with facts.
It's simple

Moferere:


What fact do you want?
How you want a project of 2 lanes to have same contract completion period as 3 lanes. Just counter it and let's share in your vast knowledge....

17 Likes 2 Shares

Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by Nobody: 3:49am On Nov 21, 2020
So in summary.... you have not done anything?

3 Likes

Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by nautybride: 3:49am On Nov 21, 2020
Our Special Agent Detective Fash, una weldone o.
This regime ; master of talk and throway face. Anyways, complete the project and do thorough work that's the Koko.

4 Likes

Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by oz4real83(m): 3:53am On Nov 21, 2020
One thing about PMB is that he brings out the true colour of people. Fashola pretended to be a good governor but couldn't pretend anymore under PMB. He has always failed in all the ministerial duties when he handled three ministries and now that he is handling one ministry. He is still there as a minister because of his evil alliance with the powers that be. This is the same man who inserted a whooping N11b into the budget of Ferma all by himself and even the Ferma boss was surprised and unable to defend it embarassed

8 Likes 2 Shares

Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by prince2pac(m): 3:54am On Nov 21, 2020
Government of blame

3 Likes 1 Share

Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by ikorodureporta: 3:54am On Nov 21, 2020
10th to comment..

Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by Nobody: 3:55am On Nov 21, 2020
dele1727:


Why don't you counter with fact?
YOU MEAN FACT WHICH FACT

1 Like

Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by beethoven: 3:55am On Nov 21, 2020
Nawa oo. How many 3-lane highways do we have in the South?. Northerners ensuring that they use the country's resources for their own max selfish benefit. Considering that we don't have enough roads in the country, the money to be spent on the extra lane can we used to build a single carriage road somewhere, where no roads exist. They can build the current road as 2-lanes first with room for expansion later. Foolish administrators managing the affairs of the country.

It is well.

16 Likes 1 Share

Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by Lexusgs430: 3:56am On Nov 21, 2020
CIA Fashola, would always find someone else to always blame......


He was an active governor, but an awful/failed minister.......... A government that cannot provide electricity in 6 months, is a failed government.......

He had almost 4 years........ No consequences for failure. ....

3 Likes

Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by nairalee(m): 4:05am On Nov 21, 2020
Blame senators
Blame the length

Blame everything apart from yourself
Let me give u other things to blame

PDP - This one na default APC blame tool
Donald Trump
Kim Jon
Cardi B
Adolf Hitler
Adam and Eve

7 Likes 1 Share

Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by Tannhauser(m): 4:08am On Nov 21, 2020
angry
Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by Tannhauser(m): 4:13am On Nov 21, 2020
nairalee:
Blame senators
Blame the length

Blame everything apart from yourself
Let me give u other things to blame

PDP - This one na default APC blame tool
Donald Trump
Kim Jon
Cardi B
Adolf Hitler
Adam and Eve

grin
You forgot social media shocked shocked

10 Likes

Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by Nobody: 4:40am On Nov 21, 2020
Hi Nairalanders, we all know how hard the country is these days. As a result, we have been looking for various ways of making money both online and offline. But no one that has a sure way online is ready to help.
It was on this Nairaland when I was looking for how to make money that providence made me meet someone who introduced me to one trading platform where I registered with 1k and made over Two thousand naira on the first day.



The profit is huge and more than 100% and it is made every single night.

The person who introduced me made over Sixty thousand in three weeks.


How do we do it? There is a trading site, there is also a signal group on Telegram or WhatsApp. We receive signals from our leader on what to trade and the amount to stake, every trading session lasts for 3 minutes and trading takes place 24/7 but, we only trade for 1 straight hour in a day. That is 9 PM, but we usually get online at least 30 minutes before trading begins. The signals are too sure as we always win 80% of our trade. You are guaranteed of making profit every night and you can withdraw your money Mondays to Fridays 9AM-5PM. Even if the money means nothing to you, it can at least settle some little bills and get you out of being always broke. If you want to be making between 1000 to 3000 Naira or more every single night. If after registration you don't make any profit from the platform on your first day, I am ready to refund your 1k. Chat with me on WhatsApp 08149796338 to receive PDF that explains how to trade.
Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by Stalwert: 4:49am On Nov 21, 2020
Officialgarri:

Exactly what I was about to type.

Someone made a point that looks valid, if you feel he's wrong, then simply prove him wrong with facts.
It's simple


How you want a project of 2 lanes to have same contract completion period as 3 lanes. Just counter it and let's share in your vast knowledge....

Nairaland is no longer a platform for sharing valid opinion, it about restating lies fueled by ethno-religious bigotry.

3 Likes

Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by olabolaji(m): 5:03am On Nov 21, 2020
Agent fash and blame game are 5&6 grin grin. Buhari should just do the needful and give him The detective general of the federation post he should be able to handle that one since it is his favorite position. grin grin

Camera finding genius

2 Likes

Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by Agbegbaorogboye: 5:08am On Nov 21, 2020
Officialgarri:

Exactly what I was about to type.

Someone made a point that looks valid, if you feel he's wrong, then simply prove him wrong with facts.
It's simple


How you want a project of 2 lanes to have same contract completion period as 3 lanes. Just counter it and let's share in your vast knowledge....
That's because you expect the workmen and other factors to still remain the same.
You remember that arithmetic of "if it takes X men y days to build a road, how many days will it take z men working at same pace?" All the variables for the "facts" you need are right there.

4 Likes

Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by GIANTPLUSHUB: 5:08am On Nov 21, 2020
OK naaw
Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by Dragonboll: 5:12am On Nov 21, 2020
Let me make your daily activities an enjoyable one. Go to your audiomack and search "NIGERIAN MIX - DJ KHAYPEE" to enjoy amazing nigerian go to mixtapes.
Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by jomoh: 5:26am On Nov 21, 2020
Agbegbaorogboye:

That's because you expect the workmen and other factors to still remain the same.
You remember that arithmetic of "if it takes X men y days to build a road, how many days will it take z men working at same pace?" All the variables for the "facts" you need are right there.

grin grin grin

He said “all variables are right there” like the land topography will be the same all through and no road side building will be affected by the expansion, no compensation calculation, no new rocks will be met etc. Everything will just remain constant as it was before the expansion.

This is one of the reasons I’ve reduced engagements on here. Imagine this your comment. Stinking like a long nosed rat.

3 Likes

Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by Agbegbaorogboye: 5:28am On Nov 21, 2020
jomoh:


grin grin grin

He said “all variables are right there” like the land topography will be the same all through and no road side building will be affected by the expansion, no compensation calculation, no new rocks will be met etc. Everything will just remain constant as it was before the expansion.

This is one of the reasons I’ve reduced engagements on here. Imagine this your comment. Stinking like a long nosed rat.
Just say you don't understand what I mean.

1 Like

Re: Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work by TopeQs: 5:28am On Nov 21, 2020
From change to blame. They blame everything effortlessly, it's funny.


Pointing fingers everywhere, except the one place it's really supposed to point.

At themselves.

3 Likes

(1) (2) (Reply)

Tony Aziegbemi: Edo PDP Chairman Suspended / Warning To All Nigerians On Insults On PMB - Cramjones / Failed Biafra Sit At Home in Port Harcourt PICS VIDEOS

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 92
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.