Kand24's Posts
Nairaland Forum › Kand24's Profile › Kand24's Posts
1 2 (of 2 pages)
Elevation of a contemporary 3 bedroom and 1 bedroom semi detached bungalow
|
Landscape design proposal for an institutional building
|
Our recently completed renovation works for one of our esteemed clients. LOCATION: Brick city estate Kubwa, Abuja.
|
PROJECT 9 LOCATION: Gwarinpa, Abuja PROJECT TYPE: 11 unit of 4 bedroom terrace with BQ attached and 8 unit of 3 bedroom block of flats. STATUS: Upcoming
|
2D drawing of a 6 units of 3 bedroom block of flats with 12 cars ground floor parking for an esteem client.
|
PROJECT 2: Progress report 1. installation of fountain pump 2. Lawn care ( weeding of grasses and application of fertilizer
|
A contemporary 2 bedroom flat for an esteem client
|
PROJECT 1 PROGRESS REPORT LOCATION: Life camp, Abuja PROJECT TYPE: 8 units of 6 bedrooms terrace duplex STATUS: block work to window sill level ongoing
|
PROJECT 8 LOCATION: Cosgrove Estate Mabushi, Abuja PROJECT TYPE: Outdoor kitchen and Inverter room design STATUS: Upcoming
|
PROJECT 7 LOCATION: Katampe, Abuja PROJECT TYPE: 8 unit of 4 bedroom terrace and 4 unit of 3 bedroom block of flats. STATUS: Ongoing
|
PROJECT 5 LOCATION: Suleja, Niger state PROJECT TYPE: 2 unit of 3 bedroom bungalow and 1 unit of 4 bedroom duplex. STATUS: Ongoing progress: Excavation of foundation trenches for the 4 bedroom detached duplex.
|
PROJECT 6 LOCATION: Wuse Zone 6 PROJECT TYPE: 6 unit of 3 bedroom block of flats with ground floor parking STATUS: Upcoming View: 1. Bird eye view 2. view showing entrance 3. view showing ground floor parking 4. General site view.
|
PROJECT 5 LOCATION: Suleja, Niger state PROJECT TYPE: 2 unit of 3 bedroom bungalow and 1 unit of 4 bedroom duplex. STATUS: Ongoing progress: 1. General block work construction 2. Concrete facia construction 3. Setting out of new unit 4. General site view.
|
PROJECT 4 LOCATION: Jabi, Abuja PROJECT TYPE: Hotel remodelling STATUS: Completed progress: 1. Gypsum or Plaster board construction 2. shelf and cabinet works 3. application of wall finishes 4. Exterior cladding works.
|
PROJECT 3 LOCATION: Jabi, Abuja PROJECT TYPE: Residential development of 12 units of 3 bedroom block of flats STATUS: Ongoing progress: 1. 3D view 2. pits excavations and iron works 3. foundation block works 4. Finished DPC casting
|
PROJECT 2 LOCATION: Utako, Abuja PROJECT TYPE: Small garden design and construction for a hospital STATUS: Ongoing progress: 1. stone pitching of walkway 2. tiling works for water fountain 3. laying of dpm to carry 40x40cm slab 4 General planting works
|
Site progress: 1. casting of ground floor columns 2. block work forming of ground floor
|
Site progress; 1. casting of DPC 2. forming and casting of kickers 3. mounting of continuous Reinforced concrete bars
|
PROJECT 1 LOCATION: Life camp, Abuja PROJECT TYPE: 8 units of 6 bedrooms terrace duplex STATUS: Ongoing
|
I am an Architect with a 12 years working experience in both design and construction of buildings, landscaping, outdoor enhancement services and interior design with licensure in Landscape Architecture |
1 2 (of 2 pages)