Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 4:44pm On Dec 02, 2013 |
Bliv it or not this room was built wit 300k tiles was less dan 20k and only used in d kitchen and toilet. Around 500 blocks were used @90 each PVC 8k a bundle was used. Electrical wires for 6k. Two bundles of zinc @ 9k each. Soak away was dug @5k. 2 big rubber of paint @2800 each, wood 2*2 20 was used at 150 each while 2*3 15 was used at 220 each, 20 cartons of tiles @800 per carton was used for both toilet and kitchen the doors and window were done at 30k, about 20bags of cement was used @1700 each, sand was bought @100 per wheel birrow and about 10naira sand was used for both sharp and plaster sand, the builder was paid 2k per day and two days for building and two days for plaster and flooring d main room the washing hand zinc in d kitchen was gotten for 2k while the WTC for d toilet was 7k, two plywood sheet was used at d kitchen @3000 per sheet .Is a very simple house boluwajokosegun: This is impressive but can you state in details how you spend the 300k
A pastor friend in ibadan did close to this with 450k, no window, doors, tiles
Is the person a builder ? Is the work done with direct labour ? Please i think some things are missing ? if not please proof me wrong The forum is to learn And are u sure this house can stand the test of time ? foundation is key in building Thank you |
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 4:04pm On Dec 02, 2013 |
Thanks @Immanuel, when digging we met a stone and had to start building fro there and because of the rock the soak away is a bit far fro d house Imanuelle: very good job sir,
albeit, you should have still gone down abit at least,
the foundation is a threat man.... less than 50k and it would have been solid. |
Autos › Re: Can 900k Get A Good Tokunbo Hiace? by MANGAM(m): 2:13pm On Dec 02, 2013 |
I think the year of production matters when it comes to price and mileage. Be more elaborate wit what u want |
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 7:11am On Dec 02, 2013 |
Thanks for understanding @einsteino einsteino: am a civil engineer and i can assure u that no foundation is stronger than a rock. OP said they discovered there was rock beneath. inshort if you are well travelled, you would notice people who live in rocky areas do not build foundation... they just build their house on the God giving foundation(rock). i can assure u that as long as the screeding was well done, his house would survive what a house with strip foundation wouldnt. |
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 7:08am On Dec 02, 2013 |
@goodtalk I appreciate ur comment and God be wit u goodtalk: Didnt you read where he said while digging the foundation they discourverd rock underneath? As a matter of fact that building is rock solid! Or you dont know what it means to set your house upon a rock? Try visit JOS and maybe u will understand better.
Am really really really impreassed! LandLord Margnum just told us what is possible if u use your head effectivly! And to second its possibility our expert in t'he house has seconded it! Oga Brabus! T'he builder of repute, so what else do cretics wants again.
Tank u Magnum for encouraging and inspiring countless of people. |
Politics › Re: Porthacourt Int, L Airport (pics) by MANGAM(m): 6:33pm On Dec 01, 2013 |
Wow |
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 4:19pm On Dec 01, 2013 |
Hi guys, if u want to see the house and meet all d guys dat worked here u can reach me @ talk2manga@yahoo.com for those in Abuja |
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 4:14pm On Dec 01, 2013 |
That's the problem, pple just inflate figures [quote author=sd-6]Why most of you don't believe the poster is because we have been overwhelmed by bogus contract prices, a function of ruthless embezzlement and corruption in our society. There are many things we can afford if we really go out to verify their costs. Again, many people use contractors who inflate prices so much. So what's that thing you have been aspiring to do? Now is the time for you to start up.[/quote] |
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 4:09pm On Dec 01, 2013 |
Thanks for understanding andyanders: My brother, you have done well with your brain. This is an inspirational means for people to know how to get their own property and someone is here asking about the foundation and arguing 'how come 300k finished the building. I am highly disappointed with people. I knew how much I spent in putting up a 4 bedroom with a BQ where I stay. It is only those who prefer the colour of a building because of the pant, that come here to ask silly questions on issues like this. This is nothing much in putting up a simple house. I have about four houses now just with nothing and picking up my rents.
Congratulation my brother. |
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 4:07pm On Dec 01, 2013 |
|
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 4:05pm On Dec 01, 2013 |
Very safe. 24hrs lite. U can bliv where it is located in Abuja Obinnau: Wow you a have correct thinking mind. You really managed your money. But i noticed that it is erected inside a jungle/bush, hope you are safe there? |
Entertainment › Re: Fast And Furious Actor Paul Walker Dead by MANGAM(m): 1:51pm On Dec 01, 2013 |
Rip Paul |
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 9:18am On Dec 01, 2013 |
When digging we discova a big rock and had to start fro dere. Mind u the house is a simple room constructed to accomodate til April next year instead of paying 800k for a room adewaleafolabi: Didn't see a foundation. Is this normal ? |
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 9:14am On Dec 01, 2013 |
The painting stage bigx: At which photo did the 300k finish? |
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 9:12am On Dec 01, 2013 |
Bliv it or not this room was built wit 300k tiles was less dan 20k and only used in d kitchen and toilet. Around 500 blocks were used @90 each PVC 8k a bundle was used. Electrical wires for 6k. Two bundles of zinc @ 9k each. Soak away was dug @5k. 2 big rubber of paint @2800 each. Is a very simple house [quote author=game_rod]You are right there, with the tiles, floor and wall, the electric fittings, the PVC ceilings, the paintings, the kitchen cabs, the soak away pit, haba. 300k?[/quote] |
Jokes Etc › Re: Most Powerful Pictures Taken In Nigeria by MANGAM(m): 10:03pm On Nov 30, 2013 |
Good one |
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 12:37pm On Nov 30, 2013 |
Pic
|
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 12:34pm On Nov 30, 2013 |
More
|
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 12:31pm On Nov 30, 2013 |
More pixs |
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 12:24pm On Nov 30, 2013 |
More
|
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 12:19pm On Nov 30, 2013 |
Pics
|
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 12:17pm On Nov 30, 2013 |
More
|
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 12:15pm On Nov 30, 2013 |
Pic
|
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 12:13pm On Nov 30, 2013 |
More
|
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 12:11pm On Nov 30, 2013 |
More pics
|
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 10:10am On Nov 30, 2013 |
Pics
|
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 10:07am On Nov 30, 2013 |
More pics
|
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 10:05am On Nov 30, 2013 |
I ve only fro now to may next year in Abuja and bulldozers ar coming after 2015 election. I can't afford to pay 800k for a room psucc: That una build and destroy city - Abuja just go in sharpenly because FCDA bulldozer is 10km away o! |
Properties › Re: Construction Of A Self-Contained Room In Abuja With 300k In 8 Days (Pictures) by MANGAM(op): 9:56am On Nov 30, 2013 |
Day 1
|