Siemens Extends Completion Of Nigeria’s Power Project To 2030 - Politics (2) - Nairaland
Nairaland Forum › Nairaland General › Politics › Siemens Extends Completion Of Nigeria’s Power Project To 2030 (17399 Views)
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by XtraFortunes: 10:19am On Aug 08, 2023 |
![]() |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by ogunsbanjul(m): 10:19am On Aug 08, 2023 |
Nigeria will move forward by God's grace. Psalms 122 vs 6 - 9 (NKJV) and Genesis 12 vs 3. FOOTSOLDIER2: |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by goshen26: 10:20am On Aug 08, 2023 |
Ok At least they reminded us and told about the extension. There are many promises made by the government that we forgot wen the time elapses. The P/H refinery promised by the president to work by December no one will remember to remind the president by December that it didn't |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by nairalanda1(m): 10:22am On Aug 08, 2023 |
FOOTSOLDIER2:Covid caused most of the delays. says plans to complete the revamping of Nigeria’s power infrastructure will take an additional five years than originally planned due to delays caused by the coronavirus pandemic (COVID-19).Has nothing to do with who you voted for....and anyway, under the original plan, the project was not meant to be completed that fast anyways. (And no, I no like APC, or even your side PDP. ). |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by IgOga(m): 10:23am On Aug 08, 2023 |
Peter Obi should focus on 2027 now. God has thrown him a lifeline to talk about serious issues like this one and offer a well thought and reasonable alternative. Start serious campaign now....expose APC....show your own solution and stop this whining about lost manhood. |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by alizma: 10:23am On Aug 08, 2023 |
How many years did COVID-19 lasted? A reasonable extension from the original scheduled delivery date should not be more than 2 years. Anything above that, them don dey tell us story again be that o |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by Gbeng30(m): 10:24am On Aug 08, 2023 |
I laugh does such project even exist....the project that is not even visible..... Millions or billions of naira has been loot in the cause of this project.. |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by valentineuwakwe(m): 10:24am On Aug 08, 2023 |
I don't be surprise if they extend it again to 2050! |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by Theunbothered: 10:24am On Aug 08, 2023 |
Throwback:The so called cabal are the members of the ALL PROGRESSIVES CONGRESS APC that are determined to loot the country dry by any means necessary. The cabal is supported by STUPID AND SENSELESS YOUTHS who think belonging to the same TRIBE and RELIGION as the looters matters when they only care about THEMSELVES . These SENSELESS YOUTHS pollute online forums like NAIRALAND and defend everything selfish politicians do like ZOMBIES. |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by SSFeedsNigeria: 10:25am On Aug 08, 2023 |
iwaeda:Something Egypt completed within a very short time has turned rocket science in Nigeria. Same way Dangote refinery also became perpetual future tense! Corruption will eventually end this country. Anyways, I'm glad that Geometric is about to give Aba 24/7 uninterrupted electricity supply that is off-grid. Industries should move to Aba and establish their production facilities pending when other parts of Nigeria will have reliable power supply. God bless Barth Nnaji. |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by justmondris: 10:26am On Aug 08, 2023 |
Nonsense. Our leaders have shared the money that was allocated for the project. As usual, this has also turned an audio and abandoned project |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by Theunbothered: 10:29am On Aug 08, 2023 |
BOSSkesh:Your corn master doesn't give a Fvck about you, and will continue from where Buhari stopped. You senseless zombies will never learn. |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by Smartguyboy(m): 10:29am On Aug 08, 2023 |
We should stop fooling ourselves this country will never have 247 light 💡. Who will be the fool enough to sign the contract and pay them to see the contract complete. |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by Theunbothered: 10:30am On Aug 08, 2023 |
nairalanda1:Other countries still built infrastructure during this time, none of them delayed a project for 10 bloody years. Use your brain! |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by Sheriman(m): 10:31am On Aug 08, 2023 |
May God spear our life till then. Eventually, we will all see what will happen. |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by teepain: 10:31am On Aug 08, 2023 |
nairalanda1:I like people like you who speak objectively even when they don't like the people or parties involved. All over the world, there were supply chain disruptions during the COVID-19 saga. In this instance, SIEMENS is right to be talking about an extension since both parties could not have foreseen the pandemic that prevented the contract execution. Constructive criticism is good but we should not be condemning everything without basis. |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by ruffhandu: 10:31am On Aug 08, 2023 |
They know what they are doing? |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by Theunbothered: 10:32am On Aug 08, 2023 |
IgOga:Even if he exposes them there are still many dumb people supported by greedy bastards who will destroy Nigeria just to enjoy for a brief moment. Look at all of the idiots on this thread making excuses for the delay. These are the same idiots that will wail about harsh government then vote the same people because they made a covenant with suffering. |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by SSFeedsNigeria: 10:33am On Aug 08, 2023 |
IgOga:The same Peter Obi you and other tribal bigots were attacking? Due to tribal and religious sentiments, you guys supported an old criminal who has absolutely nothing to offer except corruption. Anyways, if I were Peter Obi, once the tribunal rules against him, he should forget everything about Nigeria and focus on helping humanity. He has already made a great name for himself. So, he has nothing to lose. Make Africa and other poor countries your centerpiece and focus on assisting them for the rest of his life. Nigeria does not deserve great personalities like him. Rather the worst scums and condemned criminals are what they deserve. |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by worksmart(m): 10:34am On Aug 08, 2023 |
Nonsense instead of us to award these contracts to China we keep being forced to award to neocolonialist Europeans and Americans that still have our rulers enslaved and are only interested in sabotage and robbery ![]() Let us kuku cancel this contract and hire China who can do it in 2 years from scratch. |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by obyrich(m): 10:36am On Aug 08, 2023 |
Throwback:There is no cabal anywhere but irresponsible and corrupt leadership and docile followers who make excuses for them. |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by tishbite42: 10:38am On Aug 08, 2023 |
Walai COVID-19 don suffer for this world😂😂😂😂 |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by lexy2014: 10:38am On Aug 08, 2023 |
Throwback:Who and who are in this cabal? Can you pls name them? |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by nairalanda1(m): 10:40am On Aug 08, 2023 |
Theunbothered:And many did not, and there were a lot of losses then. And I think you can make your point without being so condescending and abusive. |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by Aplaudez(m): 10:40am On Aug 08, 2023 |
Join this WhatsApp group in order to have more followers, let's monintize twitter together. https:///H1hkkIpJnUP7ELHgROx2Ii |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by obyno82: 10:41am On Aug 08, 2023 |
IgOga:Dude is your brain filled with loi loi? What is the correlation with PO and the Siemens power project? |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by JDJDjD: 10:43am On Aug 08, 2023 |
iwaeda:you wont see helinues and his dead brain tinubu/APC supporters here. these are the people dragging us back and i pray they realized it before it becomes too late for them. when u tell them the truth, they will say u are not patriotic. they continue to support criminals because of tribe and political affiliations |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by PotatoSalad(m): 10:43am On Aug 08, 2023 |
If you have the funds, go solar now. Expect nothing from this government. By 2030, you'd be 7 years older, still waiting for uninterrupted power supply lmao. |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by staga: 10:46am On Aug 08, 2023 |
The same company added 15,000 MW to Egypt's national grid in three years (2015 to 2018). When it comes to Naija, stories enter. As always. |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by nairalanda1(m): 10:48am On Aug 08, 2023 |
staga:Prior to covid. And also, in Egypt they can afford to pay for mega projects because they have two things we don't have....a diversifed economy AND a tendency to go after people who try to steal power. We have neither. |
| Re: Siemens Extends Completion Of Nigeria’s Power Project To 2030 by Xox1945(m): 10:51am On Aug 08, 2023 |
Corruption power project by useless evil party Apc |
Tinubu Will Fix Nigeria’s Power Sector – Tolu Bankole (APC Chieftain) • Atiku Vs. Obi: How Each Of Them Intend To Fix Nigeria's Power Problem • Fashola Extends Completion Dates For 2nd Niger Bridge, Lagos-ibadan Expressway • 2 • 3 • 4
Bandits Kill Soldiers In Sokoto, Set Patrol Vans On Fire • US Embassy Mandates Nigerian Visa Applicants To Remove Social Media Privacy • We Don't Want Another Lockdown - Sanwo-Olu Warns Lagos Residents

