Nairaland ForumNairaland GeneralPoliticsSuccour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday (7898 Views)

1 2 Reply (Go Down)

Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by Paraman(op): 9:28am On Aug 25, 2024
Succour is on the way for motorists on Lagos-Badagry Expressway as reconstruction work on the failed portions of the expressway begins on Monday, August 26, 2024, according to the Lagos State Ministry of Transportation. As a result, motorists will be diverted on the Badagry-bound carriageway.

Oluwaseun Osiyemi, the state’s Commissioner for Transportation, who disclosed government’s plans for the expressway in a statement on Friday, August 23, said the first section of the reconstruction work, covering the stretch of Durbar Junction, Badagry Bound (on both Toll Lane and Service Lane) is expected to be completed on September 30.

Osiyemi, therefore, advised motorists to use alternative routes while repair of the first section is ongoing. Motorists going to Badagry from Lagos on the Toll Lane, he said, will be diverted to the Service Lane at 100 meters (subject to site condition) away from the proposed repair location and to exit the Service Lane back to the Toll Lane 100 meters (subject to site condition) away from the Durbar Junction to continue their journeys.


For motorists on inward journey to Badagry from Lagos on the Service Lane, they will be diverted to the Toll Lane at 100 meters (subject to site condition) away from the proposed repair location and exit the Toll Lane back to the Service Lane 100 meters (subject to site condition) away from Durbar Junction to reach their desired destinations.

Motorists going to Badagry from Durbar Road will be diverted to Fagbems Road inwards Apple Junction to link Festac Road after which they will head towards Alakija Road to access Lagos-Badagry Expressway to continue their journeys.


The commissioner appealed for understanding, noting that motorists on the other side from Badagry will have a thoroughfare inbound Lagos. He also assured that the Lagos State Traffic Management Authority (LASTMA) officials will be on ground to coordinate vehicular movement along the axis, adding that notifications will be released for the other sections on the completion of the first section.

He called for patience as the diversion is part of the traffic management plans for the rehabilitation work on the asphalt pavement of the road sections by the State Ministry of Works and Infrastructure.

In the past four to six months, motorists on the Lagos-Badagry Expressway have been on a daily dose of stress as a result of a collapsed portion of the expressway within the precinct of the Mile 2 Train Station, causing a gridlock snarl that has increased travel time on the expressway by over an hour.

Motorists start to suffer terrible slowdown all the way from Alaba Train Station on the Badagry-bound carriageway until they get past Durbar Junction on the approach to Festac First Gate, Amuwo Odofin.
https://businessday.ng/news/article/succour-for-motorists-as-lagos-badagry-expressway-repair-work-begins-monday/?utm_source=telegram&utm_medium=social

Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by Ennyjude(f): 9:57am On Aug 25, 2024
Okay
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by cunny88(m): 2:55pm On Aug 25, 2024
A road that has barely been completed is already needing repairs.
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by Ken8080(m): 2:57pm On Aug 25, 2024
Good development
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by Meti99(m): 2:59pm On Aug 25, 2024
Lagos for cruise.
The more you look the less you see
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by olaolulazio(m): 3:00pm On Aug 25, 2024
cunny88:
A road that has barely been completed is already needing repairs.
remind me of where you know around there
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by phobia2002: 3:08pm On Aug 25, 2024
Better governor
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by Shikena(m): 3:09pm On Aug 25, 2024
A working state.
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by Voltron007(m): 3:10pm On Aug 25, 2024
Nigerians and madness. This road has been a work in progress for more than 20yrs.
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by Sleekfingers: 3:23pm On Aug 25, 2024
cunny88:
A road that has barely been completed is already needing repairs.
Some people are deliberately damaging the road by breaking it or pouring chemicals on it.

Eg those Agbero or hawkers just to slow down motorists.
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by cunny88(m): 3:28pm On Aug 25, 2024
olaolulazio:
remind me of where you know around there
The project is Lagos to badagry, parts of Iyana Iba is not yet fully opened for usage, the stretch to Badagry is still incomplete but that Durbar junction has been a death trap.

The Mile 2, immediately after the bridge used to be terrible but was repaired.

What begs for questioning is: Were the contractors underpaid? Was there an inquest into why the road is needing repairs few years after construction.

This is taxpayers money, they should be held accountable.
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by ezenna191(m): 3:54pm On Aug 25, 2024
Bureaucracy
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by Lifestone(m): 3:57pm On Aug 25, 2024
Meti99:
Lagos for cruise.
The more you look the less you see
That's a Federal government project under Eng Dave Umahi
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by olaolulazio(m): 4:14pm On Aug 25, 2024
cunny88:
The project is Lagos to badagry, parts of Iyana Iba is not yet fully opened for usage, the stretch to Badagry is still incomplete but that Durbar junction has been a death trap.

The Mile 2, immediately after the bridge used to be terrible but was repaired.

What begs for questioning is: Were the contractors underpaid? Was there an inquest into why the road is needing repairs few years after construction.

This is taxpayers money, they should be held accountable.
❤️
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by Prinzton(m):
cunny88:
The project is Lagos to badagry, parts of Iyana Iba is not yet fully opened for usage, the stretch to Badagry is still incomplete but that Durbar junction has been a death trap.

The Mile 2, immediately after the bridge used to be terrible but was repaired.

What begs for questioning is: Were the contractors underpaid? Was there an inquest into why the road is needing repairs few years after construction.

This is taxpayers money, they should be held accountable.
Mile 2 lagos-bound immediately after the bridge is an eyesore but that of badagry bound is something else.

I want to assume there's more to this than meet the eyes as Julius Berger one of Nigeria's top civil contracting coys constructed the Lot 1 (Eric Moore junction to mazamaza bridge inclusive with the earth behind the abutment of the Lagos bound bridge already washing away)
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by hakeemhakeem(m): 5:01pm On Aug 25, 2024
What about Doyin to orile bus stop that area needs attention too
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by Currytoto: 5:35pm On Aug 25, 2024
Nawaooo
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by hisgrace090: 6:05pm On Aug 25, 2024
cunny88:
The project is Lagos to badagry, parts of Iyana Iba is not yet fully opened for usage, the stretch to Badagry is still incomplete but that Durbar junction has been a death trap.

The Mile 2, immediately after the bridge used to be terrible but was repaired.

What begs for questioning is: Were the contractors underpaid? Was there an inquest into why the road is needing repairs few years after construction.

This is taxpayers money, they should be held accountable.
Our leaders those not hold any body accountable unless the poor man, for others na paddy paddy thing.
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by ElevationD: 6:06pm On Aug 25, 2024
Why would they never start fixing the roads the moment potholes are spotted? Would that not save costs, man hours and lives?

Must they always wait until roads become impassable before awarding huge contracts to fill them up? What’s the job of the federal and state ministries of work, with respect to fixing of bad roads?
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by Absuchat(m): 6:15pm On Aug 25, 2024
Link from Fatgbem road to Alakija....if truck no fall between the terrible road between Agboji market and Alakija make I know wetin cause am
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by BeardedmeatR(m): 6:21pm On Aug 25, 2024
Sonoflagos, I don't blame you for being a nuisance, it's not your fault. Your fifth stepmother used your destiny.
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by uniquetechng: 6:32pm On Aug 25, 2024
This same road was posted as completed with beautiful pictures and people were celebrating, that road is bad especially from Agboju to Alakija then Under Bridge to Barracks, section of the road at Iyana Iba is still closed to the public.
Between LASU especially around Alaba Rago is very bad, Badagry axis is worse, from Pure Water/Comforter only one lane is motorable.



This is a road that has taken over 20 years and still very far from completion.
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by poseidon12: 7:02pm On Aug 25, 2024
olaolulazio:
remind me of where you know around there
Stop asking foolish questions. The road has barely been completed and should not have failed so soon.
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by poseidon12: 7:04pm On Aug 25, 2024
Sleekfingers:
Some people are deliberately damaging the road by breaking it or pouring chemicals on it.

Eg those Agbero or hawkers just to slow down motorists.
I don't think so. The problem is poor drainage system. Any time it rains, this section stays flooded for days.
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by JuanDeDios: 7:16pm On Aug 25, 2024
Sleekfingers:
Some people are deliberately damaging the road by breaking it or pouring chemicals on it.

Eg those Agbero or hawkers just to slow down motorists.
Horrible and sad, if true. I hope they catch someone and make an example of them. This is why you need CCTVs.
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by honeyB2018: 8:00pm On Aug 25, 2024
JuanDeDios:
Horrible and sad, if true. I hope they catch someone and make an example of them. This is why you need CCTVs.
Honestly, I appreciate Lagos State government for the provision of good roads in the state.
But I'm not pleased with the quality work been carried out by the contactors.
The culverts provided aren't well prepared and made to evacuate water properly anytime it rains. It doesn't flow well at all.
I will advise that all the culverts be opened up and the dirts in them evacuated for the waters to flow out normally
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by NorthernAgender: 8:04pm On Aug 25, 2024
grin let us here him that road someone can lost you must know where you are going to otherwise.
olaolulazio:
remind me of where you know around there
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by Nukilia: 8:09pm On Aug 25, 2024
uniquetechng:
This same road was posted as completed with beautiful pictures and people were celebrating, that road is bad especially from Agboju to Alakija then Under Bridge to Barracks, section of the road at Iyana Iba is still closed to the public.
Between LASU especially around Alaba Rago is very bad, Badagry axis is worse, from Pure Water/Comforter only one lane is motorable.



This is a road that has taken over 20 years and still very far from completion.
What will be the fate of the proposed coastal road to Cross River State.... undecided
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by NewDea4: 8:29pm On Aug 25, 2024
Meti99:
Lagos for cruise.
The more you look the less you see
IYKYK cool
Re: Succour For Motorists As Lagos-Badagry Expressway Repair Work Begins Monday by bibianna(f): 8:55pm On Aug 25, 2024
Good one FG.

I pray Lagos government will pay more attention on our IJAGEMO road in Ikotun.