| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 1:45am On Dec 24, 2024 |
mavverick:it's ok to repaint yearly with anti rust paint It's not the best practice to cover the base plates with concrete. It's best to observe the degradation of the materials and take decisions fast. Meanwhile,12mm plates will have a minimum lifespan of about twenty five years even in Lekki What I do is lay H channels and then drop a plain sheet where the tank will rest. The tank will be safer on a very flat surface |
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 7:14pm On Dec 26, 2024 |
We worked through the holidays and this is how far we went today
|
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 6:31pm On Dec 27, 2024 |
Job has been completed and painting will happen tomorrow
|
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 5:09am On Jan 01, 2025 |
To an incredible 2024 and a better 2025
|
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 1:30am On Jan 21, 2025 |
First tank stand job of the year
|
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 1:35am On Jan 21, 2025 |
The foundation cast
|
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 1:35am On Jan 21, 2025 |
Remember to call me on 07032446904 |
| Re: Thread tank stand construction by New Pace Services. 07032446904 by SoftP(m): 4:00am On Jan 22, 2025 |
michlins:Please What’s the overall estimate price to do this, both the concrete basement |
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 6:45am On Jan 22, 2025 |
SoftP:location and height plus the quantity of the load |
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 6:49am On Jan 22, 2025 |
We completed this job and will paint it today
|
| Re: Thread tank stand construction by New Pace Services. 07032446904 by SoftP(m): 8:29am On Jan 22, 2025 |
michlins:18ft above ground level; two Gp tanks’ Benin city… |
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 8:40am On Jan 22, 2025 |
SoftP:1.4ml with 4¾" H channels |
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 12:11am On Feb 01, 2025 |
michlins:I painted this tank black after the construction but the owner said he wanted aluminum color. So after about a week, I came back to repaint
|
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 12:14am On Feb 01, 2025 |
The final look
|
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 12:17am On Feb 01, 2025 |
Meanwhile we're starting work at another site. First thing we're doing is to decoupling the previous tank stand and make another one that is taller and with more capacity. From 40ft to 47ft. From four legged to six legged. From four (4) tanks to ten(10) tanks |
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 12:17am On Feb 01, 2025 |
I will upload pictures of the project as nairaland permits |
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 8:52pm On Feb 03, 2025 |
michlins:Tear down photo
|
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 9:00pm On Feb 03, 2025 |
Starting to form a new foundation
|
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 6:07am On Feb 08, 2025 |
Various stages of the foundation casting
|
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 6:09am On Feb 08, 2025 |
Because this is a 50ft tank stand,an extra 11ft channel had to be added to increase the length to the desired height
|
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 6:25am On Feb 13, 2025 |
Raised the tank two days ago
|
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 6:26am On Feb 13, 2025 |
Work is going on
|
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 6:30am On Feb 13, 2025 |
More pictures this morning |
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 5:01am On Feb 16, 2025 |
Here are the photos and level we are at
|
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 3:47pm On Feb 16, 2025 |
Construction phase have been completed. Next is painting
|
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 6:53pm On Feb 18, 2025 |
Bathing the tank stand. Tanks are already here
|
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 10:57pm On Feb 19, 2025 |
Finished with the job today. Tanks were positioned also
|
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 10:59pm On Feb 19, 2025 |
Seem |
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 4:41am On Feb 27, 2025*. Modified: 7:25am On Feb 27, 2025 |
Starting this job at Ogbunka in Anambra today. We're doing a 30ft tank stand
|
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 6:24am On Mar 01, 2025 |
Delivered materials to site and will be starting work today
|
| Re: Thread tank stand construction by New Pace Services. 07032446904 by michlins(op): 6:26am On Mar 01, 2025 |
More
|
| Re: Thread tank stand construction by New Pace Services. 07032446904 by Beframia: 7:33am On Mar 01, 2025 |
Weldone Michlins, happy new month to you and all here. A welder once suggested that angle iron can be used to construct a tank stand to support a 1000 ltrs tank for a bungalow. How true is this? If true, what size (or gauge) would you recommend for the various parts? michlins: |
Water Tank Stand Collapses Overnight In Lagos, Destroys Tenant’s Lexus(video) • THE MOST AFFORDABLE LUXURY PLOTS AT LEKKI AVIATION TOWN BY NEW LEKKI ✈️AIRPORT • Water Tank Stand Cost • 2 • 3 • 4
Heat And Mosquitoes: Inside Lagos Neighbourhood Where Residents Hardly Sleep • Tips To Reduce Building Costs • Idris Salako Visits Magodo Wetland, Restates Zero-tolerance For Illegal Property