Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon - Politics - Nairaland
Nairaland Forum › Nairaland General › Politics › Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon (11735 Views)
| Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by Lanrelagboi(op): 5:14am On Mar 09, 2025 |
|
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by helinues: 5:16am On Mar 09, 2025 |
Good Lagos state is on the right path |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by Tellmeastory: 5:20am On Mar 09, 2025 |
Fantastic development. God bless Lagos state. God bless Nigeria. |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by Sheuns(m): 6:19am On Mar 09, 2025 |
![]() |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by SocialJustice: 6:30am On Mar 09, 2025 |
There's really no state with pipe borne water in Nigeria. 😂 |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by michlins(m): 7:03am On Mar 09, 2025 |
This is really good but make I ask,is the pipe not too shallow on the surface. I was hoping for around 10ft depth so that even with further development of the city, nothing will touch the pipe |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by DeltaBachelor(m): 7:28am On Mar 09, 2025 |
Ok. Cool |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by Antichristian2: 7:28am On Mar 09, 2025 |
![]() Èkó òní bajẹ! The last time I visited Enugu I noticed water shortage everywhere around that trade fair side then! Hopefully Enugu and others will follow suit! The centre of excellence! |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by mrvitalis(m): 7:30am On Mar 09, 2025 |
SocialJustice:None the states with slightly functional ones Are bayelsa, Enugu and IMO... The rest don't have And yet they keep abusing Enugu |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by West1side: 7:30am On Mar 09, 2025 |
Tomorrow some lunatics n bastard from the pits of hell will claim they develop Lagos |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by ElevationD: 7:31am On Mar 09, 2025 |
Hopefully pipelines can be fixed in a lot of the communities that do not have pipelines. New areas have developed over the years and pipelines are not located there. Old neighborhoods like Ilupeju, Surulere, Victoria Island, Yaba, Anthony, Eric Moore, Ajegunle, Apapa, Jibowu, etc have pipelines running through them. Hopefully new areas like Ajah, Dopemu, Magboro, Ikotun, Ajangbadi, Okokomaiko, Ilogbo, Ikola, Abaranje/Okerube, Agbara, Command, Ayobo, etc can benefit from this. It should take plenty of time to lay the water pipelines, but hopefully the resources can be found to fix the pipelines. Thank you to Lagos state government and the Governor. |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by Germi9: 7:32am On Mar 09, 2025 |
SocialJustice:Those days Enugu use to thrive in these area but mahn!! I wonder what happened to them |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by just2endowed: 7:33am On Mar 09, 2025 |
SocialJustice:It's very craze bro. Since 1960, there is no single state that thought of providing drinkable water. Past and present government doesn't see the need for it and they all travel abroad where they will open up a tap and drinkable water flows to their cups. Nothing like buying pure water or bottle water. |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by adalame(m): 7:36am On Mar 09, 2025 |
The funny thing is that the plant is located in Ogun. Kudos Lagos |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by Houseofglam7(f): 7:36am On Mar 09, 2025 |
🤭 |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by jeff1607(m): 7:42am On Mar 09, 2025*. Modified: 11:20am On Mar 09, 2025 |
Tellmeastory:The water produced will harm residents or consumers as long as they don't use nonferric aluminum sulphate loaded with lead (PB) |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by ElevationD: 7:43am On Mar 09, 2025 |
Antichristian2:Enugu means city on the hill. Enugu always had pipe borne water in some parts, just like Lagos state. The major challenge that Enugu faces, just like other cities and towns on hilly and mountainous areas is water depth. Water seems to dry up leading to lack in those areas. Constructing boreholes can be very expensive in those areas. For example, Lagos which is a lowland costs 150-250 k to construct boreholes depending on the areas. In Enugu, just like other hilly areas, one can spend cash much as 3m naira to construct boreholes, as depth matters. Lagos has the challenge also around Ire Akari estate, Isolo, where water depth is deeper. Ire Akari is on the hilly side. But if you find water in the area, just like in other cities and towns, it is much better than you can find in other areas. |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by anonimi: 7:47am On Mar 09, 2025*. Modified: 9:25am On Mar 09, 2025 |
helinues:Why are you confusing an endless recycling propaganda path with being on the right path? Is this the enduring effect of ebilokan extreme poverty on the brain ![]() Is it 2020 yet on APC’s balablu propaganda calendar of tomorrow will never come? aresa: |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by Antichristian2: 7:51am On Mar 09, 2025 |
ElevationD:They lack water and also errosion affects them a lot! |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by tollyboy5(m): 7:51am On Mar 09, 2025 |
mrvitalis:To get water in Lagos is not difficult bro. Water is not a major problem in Lagos. |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by kingamaa(m): 7:56am On Mar 09, 2025 |
Lagos na the baba If it's not Lagos it can never be like Lagos Oga na master |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by ElevationD: 7:57am On Mar 09, 2025 |
Antichristian2:Then you do not know Enugu. Relying on social media does not help. Visit the state and see things for yourself. It is a tourism state. Every state has water problems. Lagos state has its own, just like Ogun, Ekiti, Jigawa, etc. Sanwo Olu is addressing the Lagos situation, just as other governors try to address theirs. Lagos sits on the bank of the Atlantic Ocean, yet we see citizens carrying containers from street to street, in search of water. It is a common problem in the entire nation and will take the intervention of governments at all levels to fix. Nigerians deserve to live well. Erosion is a common problem also in some SW and SS states. Ogun state for example has been dealing with that for some time. The reason Lagos placed a ban ion unlicensed dredging is to arrest erosion in some areas too. |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by mrvitalis(m): 8:00am On Mar 09, 2025 |
tollyboy5:Have u ever lived on the island? |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by Bonab: 8:02am On Mar 09, 2025 |
This is highly commendable. |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by Antichristian2: 8:03am On Mar 09, 2025 |
ElevationD:You didn't read my first comment but you read the second! I've been to Enugu trade fair before. I say posters in Igbo for buying water on trucks, tippers,etc. It may be better now! |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by Antichristian2: 8:05am On Mar 09, 2025 |
ElevationD:You didn't read my first comment but you read the second! I've been to Enugu trade fair before. I saw posters in Igbo for buying water on trucks, tippers,etc. It may be better now but I have never seen such in Lagos or Abeokuta or Ibadan before! |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by Olichoke: 8:06am On Mar 09, 2025 |
Lagos state is a leader by default and by choice. It will take 1000 years for other states to compete. |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by DelphiOracle(m): 8:10am On Mar 09, 2025 |
SocialJustice:and it's worrisome |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by simpleseyi: 8:12am On Mar 09, 2025 |
West1side:You mean the drug traffickers and fake drugs manufacturers? |
| Re: Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon by jomarick(m): 8:15am On Mar 09, 2025 |
michlins:is not always dug too deep because of maintenance, and proper flow. Some are even placed on the surface if required. Lastly, no infrastructure is allowed to solely rest on its path. |
80 Million Unemployed Youths A National Indictment, Leadership Failure – Obi • Sanwo-olu Opens Akilo Waterworks, Says 140MGPD Adiyan Water Projects Ready 2026 • Sanwo-Olu Visits Phase II Of Adiyan Water Works (Pictures) • 2 • 3 • 4
South-South Governors Reject Tinubu’s State Of Emergency Declaration In Rivers • ASUP Strike Called Off! • There Should Be No Sacred Cows In Anti-graft War – Dogara