₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,328,586 members, 8,436,440 topics. Date: Tuesday, 30 June 2026 at 10:20 AM

Toggle theme

General Topic Thread-To Discuss Anything And Everything in Building Construction - Properties (3858) - Nairaland

Nairaland ForumNairaland GeneralPropertiesGeneral Topic Thread-To Discuss Anything And Everything in Building Construction (6218045 Views)

1 2 3 ... 3855 3856 3857 3858 3859 3860 3861 ... 3987 Reply (Go Down)

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by sekzy99(m): 8:41am On Apr 04, 2025
cash1115:
It's a good price but what's the total sqm of the job

This the price i bought 2 weeks ago
Nice.

Total sqm-145
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by darc: 9:23am On Apr 04, 2025
Hello Gentlemen and Ladies

We would be pleased to assist you with:
1. Architectural Design Services
2. Construction Drawings
3. Building Construction, Renovation and Maintenance

Please contact us at:
📧 dakitect@gmail.com

🇳🇬

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by twinskenny(m): 9:35am On Apr 04, 2025
Installed!

5.5kva inverter

10kwh lithium battery


8 no of 450w high voltage panels

Accessories

Cost 3.7950m


Installed and deliver @ ikota estate

08051355133
08035153923

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by BlushPink: 12:47pm On Apr 04, 2025
Hello, please what's the average price of 225mm DPC?
Any reliable seller here?

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by cash1115(m): 1:32pm On Apr 04, 2025
Available and affordable

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by sommerfeltservi: 3:14pm On Apr 04, 2025
BlushPink:
Hello, please what's the average price of 225mm DPC?
Any reliable seller here?
I have for sale in lagos Island chat me on 08099212590
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by cash1115(m): 5:24pm On Apr 04, 2025
Always ready for your job

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Ourown(m): 6:58pm On Apr 04, 2025
topsy23:
Your electrician should follow this step sir.
-Have 3 socket in each room apart from master Bedroom
-Master bedroom should have 4 socket
- TV point in each room
- Water heater in the bathrooms
-AC power outlet in all rooms
- 4nos reces light in each room
-He should also make provision for strip/rope light depending on your ceiling design.
- Let all your light be on solar inverter if you plan to have one. It will reduce the cost of electricity bills.
-Separate your raw power DB from Inverter DB. You can install single phase DB for inverter
- if all the appliances in the kitchen are going to be recess in the cabinet, let him provide a control switch for the socket

PLUMBING
Use correct pipe for your cold water supply and hot water supply line
- Let him use measuring tape and not couch/block during measurement to avoid wrong installation.
- Let him make provision for washing machine water supply pipe and also the drainage pipe.
-
Thank you very much
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by AZUH: 9:10pm On Apr 04, 2025
twinskenny:
lol grin grin

How are you Dey? Hope you have finally move in to your apartment
good boss . You are the oldest user in the room. I think egungun is now old and cannot longer use phone
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by BrickDevo: 9:37pm On Apr 04, 2025
Available and Active, i design and i build

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by SamIsreal: 10:14pm On Apr 04, 2025
twinskenny:
For your safety kindly jettison the ideal of halve conduit go for full conduit sir

God speed
..
Thanks, sir
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by SamIsreal: 10:24pm On Apr 04, 2025
topsy23:
Full conduit is better as TwinsKenny said earlier. Leaving your cables inside the ceiling void without protecting is not the best
practice. Safely and Protection is very key to avoid bridging of cable(live and neutra).

Those are okay if he's buying correct materials. Let him him give you analysis of what he plan to install I. e
BEDROOM 1
Double socket 3
TV point 1
Recessed light 4
AC switch 1
Water heater connection point/ switch 1
Thank you for your efforts,sir. I'd appreciate your review of the provided quote to ensure it aligns with your initial recommendations. Could you also provide a customized quote for a standard 4-bedroom bungalow, including solar power integration and other stuff neeesed for a stand 4bedroom flat? This will greatly assist me in moving forward with the project.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bixton(m): 10:50pm On Apr 04, 2025
MEND001:
Can I really achieve this? I want to embark on a 3 bedroom bungalow project in a community in Delta state. Aside having 100 bags of cement and 4 trips of sand. I have nothing else. Although I have a steady income which I can save 900k monthly after all expenses. I had intended too proceed on this project base on this. But seen online that such project can take up too 50m to finish scared of embarking on the project.
There's absolutely nothing to be scared of.
If you have an existing building design plan, you can get the services of a QS to assist you in coming up with a working plan based on stage by stage construction works.


Or you get the services of an actual engineer or builder you intend to use to give you a breakdown quotation based on stages to enable you plan and have an idea of what it will cost you.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by dapotemi: 11:34pm On Apr 04, 2025
Pls is there anyone that has contracted this Pro-carpenter guy for roofing/woodwork/Gerard here on this forum. I want to know more from end user .... You have ask us to always verify if we are not sure.. Exactly what am doing.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 12:32am On Apr 05, 2025
SamIsreal:
Thank you for your efforts,sir. I'd appreciate your review of the provided quote to ensure it aligns with your initial recommendations. Could you also provide a customized quote for a standard 4-bedroom bungalow, including solar power integration and other stuff neeesed for a stand 4bedroom flat? This will greatly assist me in moving forward with the project.
I can give you a comprehensive list of what you can get for the first fix work. This will include the provision for the solar inverter DB. And also give a detail breakdown of all things you should be expecting in each location.

Bedroom 1
Recess light 4
Double Socket d 3
Tv point 1
AC power connection 1
Water heater power connection 1
Toilet light 1
Shaver socket 1
Strip light(Ceiling design will determine that)

Bedroom 2
Recess light 4
Double Socket d 3
Tv point 1
AC power connection 1
Water heater power connection 1
Toilet light 1
Shaver socket 1
Strip light(Ceiling design will determine that)

Bedroom 3
Recess light 4
Double Socket d 3
Tv point 1
AC power connection 1
Water heater power connection 1
Toilet light 1
Shaver socket 1
Strip light(Ceiling design will determine that)
2-way switch in all the bedrooms

Master Bedroom
Recess light 4
Double Socket 4
Tv point 1
AC power connection 1
Water heater power connection 1
Toilet light 2
Shaver socket 1
Strip light(Ceiling design will determine that)

Kitchen
Recess light 4
Double Socket d 6
Cooker 1
15A socket 1
Tv point 1 (optional)
AC power connection 1
Water heater power connection 1

Main entrance/Kitchen Entrance
13A double socket 1 each

Sitting Room
13A double socket 5
Spot light 6
Strip/rope light (ceiling design will determine that)
Chandelier 1

Lobby/passage way
Recess light 1 or 2 (depend on the length of the area)
13A double socket 1

External wall light
Fence light

Materials
20mm pipe 18bundles (original dignity pipe of 2.8m long
25mm pipe 2bundles
20mm Couples 5pkts
25mm coupler half pkt
Male bush 2pkts
20mm 4-way box 3pkts
20mm U box 1pkt
3*6 box 7pkts
3*3 box 8pkts
6*6 adaptable box 2
4*4 adaptable box 1
Cable tie l(ong one) 1pkt

6-Way TPN distribution board for raw power 1
6-way consumer unit for the solar inverter 1
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by MEND001: 1:15am On Apr 05, 2025
bixton:
There's absolutely nothing to be scared of.
If you have an existing building design plan, you can get the services of a QS to assist you in coming up with a working plan based on stage by stage construction works.


Or you get the services of an actual engineer or builder you intend to use to give you a breakdown quotation based on stages to enable you plan and have an idea of what it will cost you.
Okay thanks so much
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Chae: 6:33am On Apr 05, 2025
Guru can one use plastering sand for casting a colum?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bixton(m): 7:22am On Apr 05, 2025
Chae:
Guru can one use plastering sand for casting a colum?
Now that you've thought of it and asked if possible.....
Please don't try such in the site for use in building construction purposes to avoid stories you won't like to take to heart.
Thank you.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by darc: 8:25am On Apr 05, 2025
Chae:
Guru can one use plastering sand for casting a colum?
NO
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by cash1115(m): 9:00am On Apr 05, 2025
Available and affordable

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:15am On Apr 05, 2025
Wkd tips about roofing wood.

If you need real complete wood size and how to save money its advisable to buy full 2*6 or 2*8 plank then saw it to your desired size, you will thank me later.
Wood seller don’t come for me oo, if you come I will not respond. Lolz
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by erico2k2(m): 1:25pm On Apr 05, 2025
rotecch77:
Wkd tips about roofing wood.

If you need real complete wood size and how to save money its advisable to buy full 2*6 or 2*8 plank then saw it to your desired size, you will thank me later.
Wood seller don’t come for me oo, if you come I will not respond. Lolz
This was what I did on my build. You buy in cubic metres
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by ajabani4allah(m): 2:18pm On Apr 05, 2025
twinskenny:
For your safety kindly jettison the ideal of halve conduit go for full conduit sir

God speed
..
Based on this, please what advise will you give if an half conduit has already been done and pop ceiling installed? Should I leave it like that or have it re adjusted to full conduit?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by hslbroker2(m): 2:26pm On Apr 05, 2025
hslbroker2:
The simplest way to calculate the numbers of blocks you need for your fence project, assuming you are fencing a land measuring 120 feet by 60 ft, a standard plot

This calculation is based on 9 inches block fence .
The measurement we are using is 120 ft (length) and since we have two lengths that is multiply by 2 which is 240 ft. (120 x 2) = 240

The breadth is 60 ft and also since we have 2 breadths that equal 120 ft (60 x 2) = 120
Then (240 + 120) that is 360 feet perimeter line fencing.

The calculation

(we are to convert this 360 feet to inches ) since a foot is 12 inches , now let us multiply 12 inches by 360 ft which is 4320 inches.

Now to get the line numbers of blocks that will go around the fence perimeters of 4320 inches or 360 feet, we would need to divide 4320 by 18 inches, since the length of any block be it 6 inches or 9 inches is 18inches.

Now 4320 inches divide by 18 inches is approximately 240 line of blocks , then we must multiply that by the numbers of coaches of blocks you want for your height, assuming 7 ft which is 9 coaches that means 240 multiply by 9 which is 2160 blocks and that is all you need anything aside from this is fake and fraud, this calculation is derive by me professionally and i have been using it without any mistake, but always remember to add 10 % of blocks to it because of broken blocks, and for this work, you only need 30 bags of cements, one bag of cement to 70 blocks, is standard.

for your pillars between the fence, let assume 6 blocks far from the next pillar, that means 6 divide by 240 which is 40 pillars, 1 bag of cement to 2 pillars standard, that is 17 bags plus 40 bags that is 47 bags is need by me to do this fence, if i'm in position and you should also to add 15 bags for floor blinding of the fence making 62 bags of cement.

Then, we need to minus the gate and the pillars that are also taking space in the fence.

The gate is 12 ft, let us assume the gate columns or pillars is 14 inches each, we have 2 pillars holding the gate, that is 28 inches or 2. 4 feet plus 12 feet that is 14.4 feet or approximately 15 feet.

Remember we already calculate the pillars that 40 pillars is need for the measurement.

Each pillar or column for 9 inches concrete is 9 inches square, 9 x 40 = 360 inches that is (30 feet + 15 feet = 45 feet ) / 18 inches = 30 blocks multiply by the number of coaches, 30 x 9 = 270 block minus 2160 blocks = 1890 blocks in total.

40 lengths of 12mm iron rod, since one pillar is equivalent to 1 length.

3 lengths of 16mm iron rod for the 2 big pillars holding the gate.

90 planks of soft wood for the framing.

1 truck of granite (granite would be use for the wall foundation and columns)

About 5 trips of Sharp Sand.

Regards.

For more info call +234-90-2022-4350 or email life lightproperties@gmail.com
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by SamIsreal: 3:33pm On Apr 05, 2025
topsy23:
I can give you a comprehensive list of what you can get for the first fix work. This will include the provision for the solar inverter DB. And also give a detail breakdown of all things you should be expecting in each location.

Bedroom 1
Recess light 4
Double Socket d 3
Tv point 1
AC power connection 1
Water heater power connection 1
Toilet light 1
Shaver socket 1
Strip light(Ceiling design will determine that)

Bedroom 2
Recess light 4
Double Socket d 3
Tv point 1
AC power connection 1
Water heater power connection 1
Toilet light 1
Shaver socket 1
Strip light(Ceiling design will determine that)

Bedroom 3
Recess light 4
Double Socket d 3
Tv point 1
AC power connection 1
Water heater power connection 1
Toilet light 1
Shaver socket 1
Strip light(Ceiling design will determine that)
2-way switch in all the bedrooms

Master Bedroom
Recess light 4
Double Socket 4
Tv point 1
AC power connection 1
Water heater power connection 1
Toilet light 2
Shaver socket 1
Strip light(Ceiling design will determine that)

Kitchen
Recess light 4
Double Socket d 6
Cooker 1
15A socket 1
Tv point 1 (optional)
AC power connection 1
Water heater power connection 1

Main entrance/Kitchen Entrance
13A double socket 1 each

Sitting Room
13A double socket 5
Spot light 6
Strip/rope light (ceiling design will determine that)
Chandelier 1

Lobby/passage way
Recess light 1 or 2 (depend on the length of the area)
13A double socket 1

External wall light
Fence light

Materials
20mm pipe 18bundles (original dignity pipe of 2.8m long
25mm pipe 2bundles
20mm Couples 5pkts
25mm coupler half pkt
Male bush 2pkts
20mm 4-way box 3pkts
20mm U box 1pkt
3*6 box 7pkts
3*3 box 8pkts
6*6 adaptable box 2
4*4 adaptable box 1
Cable tie l(ong one) 1pkt

6-Way TPN distribution board for raw power 1
6-way consumer unit for the solar inverter 1
Wow! This is valuable information.

Thank you, sir.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Sabibouy: 6:57pm On Apr 05, 2025
Hello NL’s , Anyone here that’s into parapet concrete ( iron pan model) not precast oo .
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by cash1115(m): 7:10pm On Apr 05, 2025
Active 100%
Available 100%
Reliable 100%
Satisfaction 100%
Sincerity 100%

Try us today you will be glad you did
Call us on 07069462837

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Adedward(m): 7:23pm On Apr 05, 2025
GOOD EVENING HOUSE, THIS IS FINAL FINISHING OF OUR OFFICE SPACE PARTITIONING AT AJAH AREA, BY NAIRALANDER HERE,

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by dapotemi: 7:46pm On Apr 05, 2025
[quote author=hslbroker2 post=134858706][/quote]Pls give us your new number..have been trying to reach you since you gave me a quote..Hope you're fine because you just dey disappear, then Re-appear.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Gigaset: 8:18pm On Apr 05, 2025
Please dear Nairalander don't be fooled by this post please do a research on this guy or ask if anyone here can recommend him or just use your search button and type "adedward" (I wish I did before dealing with him),my experience with this guy was a bitter one
Adedward:
GOOD EVENING HOUSE, THIS IS FINAL FINISHING OF OUR OFFICE SPACE PARTITIONING AT AJAH AREA, BY NAIRALANDER HERE,
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by twinskenny(m): 8:41pm On Apr 05, 2025
ajabani4allah:
Based on this, please what advise will you give if an half conduit has already been done and pop ceiling installed? Should I leave it like that or have it re adjusted to full conduit?
It’s tough but carefully implement full conduit
1 2 3 ... 3855 3856 3857 3858 3859 3860 3861 ... 3987 Reply

Discuss Anything Property And Lets Make Money In The ProcessResidential Building Construction Mistakes In Nigeria You Need To AvoidGeneral Topic Thread - The Roforofo Thread Of Construction Activities234

Viewing this topic: 4 guest(s)