lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs - Travel - Nairaland
Nairaland Forum › Nairaland General › Travel › lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs (6129 Views)
| lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs by Cofficial(op): 8:26am On Apr 24, 2025 |
The Federal Ministry of Works has announced the full closure of the Marine Bridge in Lagos for 60 days, starting on Sunday, April 27, 2025. This long-anticipated shutdown marks the beginning of a critical structural rehabilitation aimed at replacing 50 worn-out bridge bearings. The repair will unfold in three phases, each lasting 20 days, and is expected to create significant traffic disruptions, especially during the initial phase when a section of the bridge will be completely closed.https://www.frontpagenews.ng/business/lagos-marine-bridge-to-undergo-60-day-closure-for-structural-repairs/
|
| Re: lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs by MosakuAW(m): 8:37am On Apr 24, 2025 |
Another sleeping in the traffic for hours loading 😴. Most of these bridges linking the Mainland to the Island were built during the Military regimes and are getting weaker structurally year by year. This Civilian govt ought to have built a new bridge(s) linking the mainland and the island instead of wasting money on the Calabar-Lagos Highway. Lagos is still the biggest commercial hub and generates millions in taxes to FG. They only focuses on projects that will fetch money into their pockets. Just like Buhari wasted funds on Nigeria 🇳🇬 to 🇳🇪 Niger train lane projects. In term of projects, the Military regimes did far better than civilian rule.. Democracy is looking like demonstration of craze like BABA Fela says. |
| Re: lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs by optimistfeel(m): 8:38am On Apr 24, 2025 |
Another traffic headache loading......... Jah be merciful. |
| Re: lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs by MANNABBQGRILLS: 8:40am On Apr 24, 2025 |
Alright, Thanks for letting us know. We will switch routes. |
| Re: lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs by Adakintroy: 8:40am On Apr 24, 2025 |
As much as apapa contribute to lagos and Nigeria economy it still has one of the most shitty roads in all of Lagos. It's a disgrace to this famous place. Any where your are in Nigeria the name apapa stand out. But when you see it.... |
| Re: lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs by sirblend: 8:42am On Apr 24, 2025 |
Lol Na to leave house by 3am sure pass |
| Re: lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs by Onyi90(m): 8:43am On Apr 24, 2025 |
[quote author= post=135104529]Alright, Thanks for letting us know. We will switch routes.[/quote]You be Lagosian? |
| Re: lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs by arsenal33: 8:44am On Apr 24, 2025 |
optimistfeel:should the bridge be repaired? No pain no gain |
| Re: lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs by MrSundry: 8:47am On Apr 24, 2025 |
I hope Minister of works is aware of the closure. Make e no happen finish now, make blames start to dey fly around |
| Re: lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs by ariesbull: 8:47am On Apr 24, 2025 |
What is this ineptitude in Lagos ...everyone closing bridges that will affect productivity and heath Don't other countries have !..do they close theirs often...habw you hard New York close their cable bride or Amsterdam close their bridges or London close Thames River bridges |
| Re: lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs by PRINCESSFCFANSs(f): 8:49am On Apr 24, 2025*. Modified: 9:19am On Apr 24, 2025 |
OK this construction ,construction going on , then after few months the bridges will be weak again , Princess Faith Chukwu |
| Re: lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs by MANNABBQGRILLS: 8:49am On Apr 24, 2025 |
Onyi90:First and foremost, We are Nigerians, Majority of us are based in Lagos, Abuja and PH. |
| Re: lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs by erniok(m): 8:55am On Apr 24, 2025 |
arsenal33:Let them work on it with umahi supervising like he did when it affected the high and mighty of Lagos. What is good for the goose is also good for the gender. |
| Re: lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs by Adebaba1(m): 8:56am On Apr 24, 2025 |
long overdue i hope they fix that apapa road too especially the area below eric moore bridge that place is an eyesore |
| Re: lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs by mannobi(m): 9:01am On Apr 24, 2025 |
Another traffic jam loading. LAGOS and her unending wahala |
| Re: lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs by GloriousGbola: 9:02am On Apr 24, 2025 |
.
|
| Re: lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs by Enddy50ty(m): 9:04am On Apr 24, 2025 |
Okay |
| Re: lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs by DisGuy(mod): 9:14am On Apr 24, 2025 |
1 week notice ....hope they have adequately repaired the alternative routes. |
| Re: lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs by free2ryhme: 9:25am On Apr 24, 2025 |
Cofficial:You people should have finish your construct work on the service lanes on both sides into ijora before the nonsense. |
| Re: lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs by aywagze(m): 9:27am On Apr 24, 2025 |
Another days of vigil in traffic is warming up for lagosians. Everyone will be fine eventually ..🤔 |
| Re: lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs by crossbreedwears(m): 9:45am On Apr 24, 2025 |
Thank you very much sir. I've always said Military had done so much and i expected the civilian government to continue the projects, but they are after self-benefit MosakuAW: |
| Re: lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs by Barteze: 11:40am On Apr 24, 2025 |
Cofficial:Any rehabilitation or maintenance should start by evicting and clearing the abokis who occupy the under of that bridge for long time now. |
| Re: lagos Marine Bridge To Undergo 60-day Closure For Structural Repairs by johnie: 11:42am On Apr 24, 2025*. Modified: 12:40pm On Apr 24, 2025 |
Cofficial:Picture shown above is Marina Bridge on Lagos Island not Marine Bridge at Apapa (shown below) which is to be repaired.
|
Ibadan Airport Back In Operation After Closure For Modernisation • Nigerian In Thailand Arrested For Overstaying 60-Day Visa By 7 Years (Photos) • Ministry Of Works Closes A Portion Of Marine Bridge For 8 Months For Repairs • 2 • 3 • 4
Latest Prices Of God Is Good Motors (GIGM) As Of June 2, 2026 • My Travel Experience With Arik Airline • Johannesburg, South Africa