Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD - Politics (2) - Nairaland
Nairaland Forum › Nairaland General › Politics › Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD (7604 Views)
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by Niok: 6:56am On Jun 02, 2025 |
They’re desperate And it shows Commissioning 30km is a disgrace and insult to nigerians |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by JuanDeDios: 7:02am On Jun 02, 2025*. Modified: 7:42am On Jun 02, 2025 |
Ikaeniyan0:Alright. But what of the railway component? Was that completed and commissioned with this segment? Or are they deferring that till later? |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by geoworldedu: 7:05am On Jun 02, 2025 |
koladata:There is nothing diabolical. Greed is ingrained in the mind of an average Nigerian. That's the truth to kiss. |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by koladata(m): 7:08am On Jun 02, 2025 |
are you saying since 1960, i've not gotten one person that is not greedy geoworldedu: |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by Pateebartex(m): 7:08am On Jun 02, 2025 |
The vice president commissioned a one lane kilometer road in masaka Karu local government nasarawa State. Why are you bothered about the president commissioning 4% our of 100%? And some brainwashed people are still praising him |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by Typing: 7:08am On Jun 02, 2025 |
Ikaeniyan0:Where will you use the 30km to, when over 700km is still a forest?
|
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by geoworldedu: 7:09am On Jun 02, 2025 |
koladata:When that one person is surrounded with 1000 greedy ones, he will eventually succumb to greediness and become the king of greed eventually himself. |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by jnister: 7:12am On Jun 02, 2025 |
A project of 740km only 30km is completed and they are rushing to commission it isn't that shameful? helinues: |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by helinues: 7:14am On Jun 02, 2025 |
jnister:So the 30km is not going to be used after completion? |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by creativejagaban: 7:16am On Jun 02, 2025 |
adenigga:Wailers. ![]() No more: the project is not possible ![]() It is now: commissioning is premature ![]() Later, it will be: it cannot be completed ![]() Awon wailers. Tinubu till 2031!!! |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by Makamatic: 7:22am On Jun 02, 2025 |
koladata:Tunubu , hahaha just they play , just they play .. One thing I've understand is that most of these folks don't even know emilokan tunubu when he was governor of lagos and how lagos is . Jungle justice , hooliganism , disorderliness was the order of the day .. |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by gidigbam1: 7:22am On Jun 02, 2025 |
The 30km road was commissioned for public usage. So are you saying Nigerians should wait for the 700km to be finished before we start using the roads? This mumu man does not know that the road is section by section. Just imagine the relief it will give to Lagosians living around the Lekki axis, as they don't have to use Lekki Epe Expressway any longer as they can use the coastal road to decongest traffic. |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by ibabz(m): 7:24am On Jun 02, 2025 |
helinues:Why are you like this? Celebrating 4%, not 40%, not even 10% but 4%? |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by Timmi: 7:25am On Jun 02, 2025 |
This mushroom, envelope collecting sponsored organization NEFGAD either could not read nor comprehend what was commissioned, it was clearly stated that it’s the first portion of only 30-km that was commissioned and not the entire length of the roadway. adenigga: |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by Bluntemperor: 7:28am On Jun 02, 2025 |
Ikaeniyan0:NEFRAD IS NEW TO NIGERIA. HOPE THEY KEEP UP THEIR MONITORING ADVOCACY - FOR IT'S GOOD TO BE KNOWN AND COMMITTED - Once and For all. |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by Timmi: 7:28am On Jun 02, 2025 |
Commissioning of projects in phases is regular occurrence anywhere in the world and hence nothing peculiar about it. It’s only in Nigeria where everything becomes politicized to suit the sponsors of this mushroom, envelope collecting disgraceful set of people. Niok: |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by Ikaeniyan0: 7:29am On Jun 02, 2025 |
Typing:Construction on this project started less than 15 month ago or so, but you want all the 700km to be ready for commission. Some of you are just frustrated, that's why you come online to talk anyhow. This is a massive project, it's a new built road, I wander the kind of magic most of you are expecting in less than 15 months the project started. The pictures below is from the Calabar section which started few weeks ago
|
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by Timmi: 7:31am On Jun 02, 2025 |
Yes NEFRAD is a new sponsored organization playing the role of a piper and the piper only sings the song of its sponsor(s). Another stooge in the hand of the dishonorable coalition. Bluntemperor: |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by Dontblink: 7:32am On Jun 02, 2025 |
Scam. |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by Dontblink: 7:37am On Jun 02, 2025 |
Ikaeniyan0:Fine but can they please shut up and put in the work instead of making noise everywhere and commissinoning a 30km work out of over 700km? We want to see the work, not noise everywhere. |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by blackmantis: 7:38am On Jun 02, 2025 |
The money spent on the fanfare of commissioning this incredulous 30km of a 750km road should have been better utilized. |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by correctyourself(m): 7:40am On Jun 02, 2025 |
Macphenson:Let me educate you for your own benefits, i just chose to do so for you. Now if you're a car owner, you drive through the part of the road that has been opened for use and your car had an accident, insurance wouldn't pay you if the road was not commissioned. Did you know this before now? It would be considered as road under construction and not fit to be used for transportation. I hope you learnt something from this? |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by AskProf: 7:40am On Jun 02, 2025 |
helinues:Really? |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by BeardedMeat(m): 7:42am On Jun 02, 2025 |
Anyone that criticizes the government is quickly termed a "hater" by the corn munching imps of NL. Nigeria is doomed with these set of people. |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by cjudy(m): 7:42am On Jun 02, 2025 |
koladata:What’s Tinubu past record? Seems you’re a kid. Which Lagos did he developed? Lagos was once a capital of Nigeria well developed. So what is Tinubu past record I ask again? |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by Antoeni(m): 7:47am On Jun 02, 2025 |
Tinubu commissioning 30km out of a proposed 700km road
|
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by AmazingELixir: 7:48am On Jun 02, 2025 |
This ia quite apt...I'm not a fan of celebrating uncompleted projects. |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by patrickcollins: 7:49am On Jun 02, 2025 |
Ikaeniyan0:Forget what they said, like we are making use of the port Harcourt refinery and others |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by bdon12: 7:50am On Jun 02, 2025 |
adenigga:Pls tell dem o...why d deceit.project of 750 km u come commission 30 n say its been completed |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by WizardOfNG: 7:51am On Jun 02, 2025 |
Brendaniel:Is it Tinubu and his team that are not normal or you contributes senseless talk, everyday on this forum, because of prejudiced hatred of others? The Lagos Calabar coastal highway is, for majority of it's length, a road. Very different to your comparison using a bridge. The highway will be constructed in well-defined sections the FG has provided exhaustive information about for progressive Nigerians to access. Each section should, per FG stated plans, be usable upon completion and moves will be made to toll completed sections asap to make more money available for deployment towards quicker completion of other sections. A sections of the highway that is completed, usable and capable of being tolled can/should be commission as a completed project within a bigger project the FG has always revealed would be modular. Same as how Lagos blue metro rail line , terminating at Marina, was commissioned and is now in use daily even though we know, because Lagos State officially informed us of such, that a next phase will begin to extend the blue line beyond it's present termation point at Marina to the Epe corridor of Lagos. Analysing you thougthless example of Third Mainland brigdge, it is obvious a bridge over water cannot be commissioned at any stage, other than full completion, because it's purpose is to close the gap from one end of a body of water to another so that vehicle and pedestrian can cross said body of water. So, who exactly is "not normal" if not the person unintelligently asking if the government would commission a 4% completed Third Mainland bridge, when that makes no logical sense, in comparison to a lenghty highway where sections can become fully usable once completed and thus deserve commissioning before official money tolling begins? |
| Re: Lagos-Calabar Coastal Highway Unfinished, Unfit For Commissioning — NEFGAD by koladata(m): 7:51am On Jun 02, 2025 |
Tinubu built my secondary school about 22 years ago, (you can google babs fafunwa millennium secondary school Ojodu) and till date it looks like it was built yesterday because it still looks modern even in 2025. And that was the least of the things tinubu did in lagos . I was born and brought up in Lagos. So you don't have to call me kid , lets learn to have decent argument without calling each other names. cjudy: |
Wike Invites Peter Obi For Commissioning Of Flyover In Rivers State (Photo) • 2023: Tinubu Unfit For Presidency - Chukwuemeka Ezeife • Sowore: Obi Unfit For Presidency, He Has Nothing To Show As Governor • 2 • 3 • 4
SANs Who Defend Corrupt Judgesare Also Guilty – CJN • The North Is Playing Into Igbo Trap, They Will Lose More If The Igbos Leave. • Prepare To Run Again In 2027, APC Chieftain, Yekini Nabena Mocks Atiku