₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,328,991 members, 8,438,338 topics. Date: Friday, 03 July 2026 at 09:56 AM

Toggle theme

KM Of Roads Alex Otti Commissioned After 2 Years As Governor - Politics - Nairaland

Nairaland ForumNairaland GeneralPoliticsKM Of Roads Alex Otti Commissioned After 2 Years As Governor (2123 Views)

1 Reply (Go Down)

KM Of Roads Alex Otti Commissioned After 2 Years As Governor by UpaIweka(op): 6:43am On Jun 14, 2025
The lengths of 12 out of 14 roads commissioned in Aba are:

1. Umuode Road: 1.5 km
2. Bakassi Road: 0.6km
3. Isu Ihiteukwa Street: 0.3 km
4. Asa Triangle Road: 0.5km
5. Enyimba Junction – Ariaria Gate: 0.3 km
6. Market Road: 0.744 km
7. Tenant Road: 0.740 km
8. Cameroun Road: 0.711 km
9. Ehi Road: 0.5 km
10. Clifford Road: 0.836 km
11. School Road: 0.729 km
12. Afikpo Road: 0.480 km

Total is 7.94km not up to 10km

Thank you Dr Alex Chioma Otti OFR
@alexottiofr


https://x.com/Onsogbu/status/1932717685751562317

Laugh wan tear my belle. Imagining comming 0.4 KM of road, that is 400 metre same as lengh of football field olympic athlete run under seconds 😂. Now imagine how in a twinkle of an eye a car will zoom over that yet we have sycophants celebrate this rubbish as an accomplishment in 2025.

Same supoporter will be the one insulting Dapo Abiodun that commission a 5.5 KM Awokoya road and Igbebaba lane this same week without a single photo n noise on Nairaland.

https://guardian.ng/news/nigeria/metro/gov-abiodun-commissions-two-roads-in-ogun/

Ipob claim one making noise is a working governor while that doing the lords biddsing silebtly without noise is a failure. Note that same Dapo Abiodun recently completed another over 20KM road in Sagamu without noise on NL.


Dapo Abiodun need to fire his commissioner of information n put in place a social media team numbering over 100 to sell his work because I do not understand how an Alex Otti that will never achieve over 1/20th of what he already accomplished make so much noise online with little or nothing to show. I will not be doing his PR for him. I am available if he is willing to pay to get the job done.

Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by UpaIweka(op): 6:44am On Jun 14, 2025
Please no be only me go laugh at this mediocrity ovidient ipob think we shoukd be rrjoicing over.

Imagining a governor dressing up in the morning with family n friends to go and commission 300 metre road not 3 KM or.

300 metre that is not up to 400 metre Falilat Ogunkoya use to run and some paid clowns are all over soxial media poating before n after of such pathetic roads ?!
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by DiasGodinHeaven: 6:47am On Jun 14, 2025
UpaIweka:
The lengths of 12 out of 14 roads commissioned in Aba are:

1. Umuode Road: 1.5 km
2. Bakassi Road: 0.6km
3. Isu Ihiteukwa Street: 0.3 km
4. Asa Triangle Road: 0.5km
5. Enyimba Junction – Ariaria Gate: 0.3 km
6. Market Road: 0.744 km
7. Tenant Road: 0.740 km
8. Cameroun Road: 0.711 km
9. Ehi Road: 0.5 km
10. Clifford Road: 0.836 km
11. School Road: 0.729 km
12. Afikpo Road: 0.480 km

Total is 7.94km not up to 10km

Thank you Dr Alex Chioma Otti OFR
@alexottiofr


https://x.com/Onsogbu/status/1932717685751562317

Laugh wan tear my belle. Imagining comming 0.4 KM of road, that is 400 metre same as lengh of football fireld olympic athlete run under seconds 😂. Now imagine how in a twinkle of an eye a car will zoom over that yet we have sycophants celebrate this rubbish as an accomplishment in 2025.

Same supoporter will be the one insulting Dapo Abiodun that commission a 5.5 KM Awokoya road and Igbebaba lane this same week without a single photo n noise on Nairaland.

https://guardian.ng/news/nigeria/metro/gov-abiodun-commissions-two-roads-in-ogun/

Ipob claim one making noise is a working governor while that doing the lords biddsing silebtly without noise is a failure. Note that same Dapo Abiodun recently completed another over 20KM road in Sagamu without noise on NL.


Dapo Abiodun need to fire his commissioner of information n put in place a social media team numbering over 100 to sell his work because I do not understand how an Alex Otti that will never achieve over 1/20th of what he already accomplished make so much noise online with little or nothing to show needs ro be studied. I will not be doing his PR for him. I am available if he is willing to pay to get the job done.
Very big lies. The Umuode road I know is more than 5km . Stop lying okay
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by UpaIweka(op): 6:52am On Jun 14, 2025
Go to the x account user and argue your point or tag the governor social media aide n let them know the road they commissioned is more than what they stipulated themselves as you be road enguneer measurer.

DiasGodinHeaven:
Very big lies. The Umuode road I know is more than 5km . Stop lying okay
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by Thiefobi1: 7:12am On Jun 14, 2025
They praise their own failures while condemning others success.
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by AustineE1: 7:22am On Jun 14, 2025
If you observe no one is responding to the Agbadorlans above!you gave figures which are totally false and summed it up to 7kms.Lets even say it is even true,why then did you choose 12 out of the 14 roads he commissioned,so what happens to the remaining 2 or the kms those 2 covered is so much that it can make your criticism look stupid,next time you wish to ridicule a performing governor out of mere jealousy,do it with full details.
Obviously,he is not a man that commissioned 30kms of a road that is about 700kms and shamelessly did it with fanfare.even when the project was awarded in the cover of the night to fellow business partners at an amount that is ridiculous.
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by SeeWahala: 7:33am On Jun 14, 2025
All the roads otti commissioned were COMPLETED PROJECTS and not someone commissioning 4% of a 700km road
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by Ikaeniyan0: 7:35am On Jun 14, 2025
UpaIweka:
The lengths of 12 out of 14 roads commissioned in Aba are:

1. Umuode Road: 1.5 km
2. Bakassi Road: 0.6km
3. Isu Ihiteukwa Street: 0.3 km
4. Asa Triangle Road: 0.5km
5. Enyimba Junction – Ariaria Gate: 0.3 km
6. Market Road: 0.744 km
7. Tenant Road: 0.740 km
8. Cameroun Road: 0.711 km
9. Ehi Road: 0.5 km
10. Clifford Road: 0.836 km
11. School Road: 0.729 km
12. Afikpo Road: 0.480 km

Total is 7.94km not up to 10km

Thank you Dr Alex Chioma Otti OFR
@alexottiofr


https://x.com/Onsogbu/status/1932717685751562317
It's just in Aba alone.

I'm sure he built in some other part of Abia state too.
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by ikennahillary: 7:44am On Jun 14, 2025
Here’s a detailed look at the roads commissioned by Governor Alex Otti in Abia State, with their respective lengths and commissioning dates:


---

🚧 Roads Commissioned by Alex Otti

1. Three Roads in Aba (Commissioned 13 Dec 2024)

Cemetery Road Phase II — 1.6 km

Umuocham Road — 2.7 km

Umule Road — 1.6 km
_Total: 5.9 km_


2. Dozie Way in Umuahia (Commissioned 26 Nov 2024)

Rehabilitated Dozie Way — 1.3 km


3. University Road, Green Avenue & College Road in Aba (Commissioned 29 May 2024)

Three inner-city roads (exact kilometre lengths not specified in sources).


4. Arochukwu–Ndi Okereke–Ozuabam Road (Flag‑off 21 Mar 2024)

Length — 30 km


5. Arochukwu–Ndiokereke–Okobo–Ozuabam Road (Commissioned 21 Mar 2024)

30 km (same as above; referenced concurrently)


6. Arochukwu–Ndiokereke–Ozuabam (component flagged earlier)

Another reference to a 30 km rehabilitation


7. Umuahia‑Uzuakoli‑Abiriba‑Ohafia Corridor (Flag‑off 8 Feb 2024)

Total length — ~67.6 km, broken into:

Umuahia to Uzuakoli — 22.6 km

Uzuakoli to Abiriba — 22.5 km

Abiriba to Ohafia — 22.5 km



8. Nunya–Eluama Road (Flag‑off 28 Mar 2024)

11.5 km


9. Onuinyang–Okporoenyi–Oboro–Ikwuano Road (Flag‑off 30 Jan 2025)

13 km



---

🧮 Summary of Total Kilometres Delivered

Project Segment Length (km)

Cemetery, Umuocham & Umule Roads 5.9
Dozie Way 1.3
Arochukwu–Ndiokereke–Ozuabam Pathway 30
Umuahia‑Uzuakoli‑Abiriba‑Ohafia Corridor 67.6
Nunya–Eluama Road 11.5
Onuinyang–Okporoenyi–Oboro–Ikwuano Road 13
**Total (explicit km)** 129.3 km+


_+Note: University, Green, and College Roads in Aba were commissioned but lengths not specified._


---

🔍 Additional Context

By June 2024, Otti reported reconstructing 90 roads across the state using a “Zero Pothole” strategy, with 16 roads totalling about 165 km completed and inaugurated .

Through direct labour and cost saving initiatives, many of these were delivered under budget.



---

Final Answer:
Based on documented sources, Governor Alex Otti has explicitly commissioned or flagged‑off at least 129.3 km of roads in Abia State. This includes major corridors and several inner-city streets. Beyond that, his administration cites reconstructing around 165 km across 16 roads by mid‑2024, with many additional urban roads commissioned later in 2024 and early 2025.
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by bdon123(m): 7:50am On Jun 14, 2025
UpaIweka:
The lengths of 12 out of 14 roads commissioned in Aba are:

1. Umuode Road: 1.5 km
2. Bakassi Road: 0.6km
3. Isu Ihiteukwa Street: 0.3 km
4. Asa Triangle Road: 0.5km
5. Enyimba Junction – Ariaria Gate: 0.3 km
6. Market Road: 0.744 km
7. Tenant Road: 0.740 km
8. Cameroun Road: 0.711 km
9. Ehi Road: 0.5 km
10. Clifford Road: 0.836 km
11. School Road: 0.729 km
12. Afikpo Road: 0.480 km

Total is 7.94km not up to 10km

Thank you Dr Alex Chioma Otti OFR
@alexottiofr


https://x.com/Onsogbu/status/1932717685751562317

Laugh wan tear my belle. Imagining comming 0.4 KM of road, that is 400 metre same as lengh of football field olympic athlete run under seconds 😂. Now imagine how in a twinkle of an eye a car will zoom over that yet we have sycophants celebrate this rubbish as an accomplishment in 2025.

Same supoporter will be the one insulting Dapo Abiodun that commission a 5.5 KM Awokoya road and Igbebaba lane this same week without a single photo n noise on Nairaland.

https://guardian.ng/news/nigeria/metro/gov-abiodun-commissions-two-roads-in-ogun/

Ipob claim one making noise is a working governor while that doing the lords biddsing silebtly without noise is a failure. Note that same Dapo Abiodun recently completed another over 20KM road in Sagamu without noise on NL.


Dapo Abiodun need to fire his commissioner of information n put in place a social media team numbering over 100 to sell his work because I do not understand how an Alex Otti that will never achieve over 1/20th of what he already accomplished make so much noise online with little or nothing to show. I will not be doing his PR for him. I am available if he is willing to pay to get the job done.
Even if he commission 7km as a state government its something.Afterall tpain is lying of commissioning 30km wit d whole federal borrowing n purse
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by NlGERlA: 8:13am On Jun 14, 2025
UpaIweka:
The lengths of 12 out of 14 roads commissioned in Aba are:

1. Umuode Road: 1.5 km
2. Bakassi Road: 0.6km
3. Isu Ihiteukwa Street: 0.3 km
4. Asa Triangle Road: 0.5km
5. Enyimba Junction – Ariaria Gate: 0.3 km
6. Market Road: 0.744 km
7. Tenant Road: 0.740 km
8. Cameroun Road: 0.711 km
9. Ehi Road: 0.5 km
10. Clifford Road: 0.836 km
11. School Road: 0.729 km
12. Afikpo Road: 0.480 km

Total is 7.94km not up to 10km

Thank you Dr Alex Chioma Otti OFR
@alexottiofr


https://x.com/Onsogbu/status/1932717685751562317

Laugh wan tear my belle. Imagining comming 0.4 KM of road, that is 400 metre same as lengh of football field olympic athlete run under seconds 😂. Now imagine how in a twinkle of an eye a car will zoom over that yet we have sycophants celebrate this rubbish as an accomplishment in 2025.

Same supoporter will be the one insulting Dapo Abiodun that commission a 5.5 KM Awokoya road and Igbebaba lane this same week without a single photo n noise on Nairaland.

https://guardian.ng/news/nigeria/metro/gov-abiodun-commissions-two-roads-in-ogun/

Ipob claim one making noise is a working governor while that doing the lords biddsing silebtly without noise is a failure. Note that same Dapo Abiodun recently completed another over 20KM road in Sagamu without noise on NL.


Dapo Abiodun need to fire his commissioner of information n put in place a social media team numbering over 100 to sell his work because I do not understand how an Alex Otti that will never achieve over 1/20th of what he already accomplished make so much noise online with little or nothing to show. I will not be doing his PR for him. I am available if he is willing to pay to get the job done.
Get your facts right. Do not write rubbish here.
The reference up there are just roads commissioned in one day.
look at the total number of roads commissioned since he became governor

Governor Alex Otti has overseen several road projects in Abia State since taking office in early 2023. Here are the key figures:
16 roads reconstructed and inaugurated, totaling approximately 165 km

Commissioning of 19.1 km of upgraded rural roads (Itungwa–Mgboko–…–Nkwo-Elechi segment) through the World Bank’s RAAMP programme
gazettengr.com

Dozie Way, a 1.3 km urban link in Umuahia, completed via direct labour
thetimes.com.ng
abiastate.gov.ng
fmino.gov.ng

A 30 km stretch flagged off: the Arochukwu–Ndi Okereke–Ozuabam road, which has commenced construction
newdayreporters.com
abiastate.gov.ng
en.wikipedia.org

Total commissioned and built so far
165 km (16 roads)
+ 19.1 km (rural roads)
+ 1.3 km (Dozie Way)
+ 30 km (Arochukwu/Ozuabam, underway)

215.4 km of roads have been commissioned or are already under active development during his administration.
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by SmartPolician: 8:26am On Jun 14, 2025
Keep jubiliating and wallowing in your own lies until official data from the government sources drops.
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by Ojiofor: 8:41am On Jun 14, 2025
Thiefobi1:
They praise their own failures while condemning others success.
The PH road Aba is 6km.
Umuahia/Uzuakoli,Akara/Ohafia road commissioned recently by OBJ is 65km.
There are many other too numerous to mention here.Leave Alex for us he is doing far better than your governor.What he commissioned few days ago is inner streets of Aba and Aba people love it.
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by EvilMerodack(m): 4:42pm On Jun 14, 2025
cheesy

Na wetin Otto dey commission be this


This dude and good governance are like water and oil. Dem no dey mix
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by yyba: 5:12pm On Jun 14, 2025
Just 7.4km of road for 2 years as governor and he is celebrating, while his colleague in Niger state is doing 5km of road in each of the 25 LGA of the state without any noise on media. 5 * 25 = 125 km of roads. OTTI you have failed completely as governor
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by stanluiz(m): 7:34pm On Jun 14, 2025
EvilMerodack:
cheesy

Na wetin Otto dey commission be this


This dude and good governance are like water and oil. Dem no dey mix
Go and face your useless and backward Ogun state that has never experienced good governance.

Abia state under the leadership of Alex otti is progressing in all sectors while ogun state in stagnant and retrogressing.

See your useless ogun state here

https://www.youtube.com/watch?v=DlvP0hMm4Ws?si=BTf-F6EH_rkHCsyo
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by SpatialKing(m): 7:39pm On Jun 14, 2025
bdon123:
Even if he commission 7km as a state government its something.Afterall tpain is lying of commissioning 30km wit d whole federal borrowing n purse
Most of those roads where critical roads abandoned by PDP governments
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by Okwyjesus(m): 7:50pm On Jun 14, 2025
UpaIweka:
The lengths of 12 out of 14 roads commissioned in Aba are:

1. Umuode Road: 1.5 km
2. Bakassi Road: 0.6km
3. Isu Ihiteukwa Street: 0.3 km
4. Asa Triangle Road: 0.5km
5. Enyimba Junction – Ariaria Gate: 0.3 km
6. Market Road: 0.744 km
7. Tenant Road: 0.740 km
8. Cameroun Road: 0.711 km
9. Ehi Road: 0.5 km
10. Clifford Road: 0.836 km
11. School Road: 0.729 km
12. Afikpo Road: 0.480 km

Total is 7.94km not up to 10km

Thank you Dr Alex Chioma Otti OFR
@alexottiofr


https://x.com/Onsogbu/status/1932717685751562317

Laugh wan tear my belle. Imagining comming 0.4 KM of road, that is 400 metre same as lengh of football field olympic athlete run under seconds 😂. Now imagine how in a twinkle of an eye a car will zoom over that yet we have sycophants celebrate this rubbish as an accomplishment in 2025.

Same supoporter will be the one insulting Dapo Abiodun that commission a 5.5 KM Awokoya road and Igbebaba lane this same week without a single photo n noise on Nairaland.

https://guardian.ng/news/nigeria/metro/gov-abiodun-commissions-two-roads-in-ogun/

Ipob claim one making noise is a working governor while that doing the lords biddsing silebtly without noise is a failure. Note that same Dapo Abiodun recently completed another over 20KM road in Sagamu without noise on NL.


Dapo Abiodun need to fire his commissioner of information n put in place a social media team numbering over 100 to sell his work because I do not understand how an Alex Otti that will never achieve over 1/20th of what he already accomplished make so much noise online with little or nothing to show. I will not be doing his PR for him. I am available if he is willing to pay to get the job done.
Funny People.

This is only in Aba main town.

What of Umuahia, Ohafia and Isikwuato
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by Okwyjesus(m): 7:52pm On Jun 14, 2025
Ojiofor:
The PH road Aba is 6km.
Umuahia/Uzuakoli,Akara/Ohafia road commissioned recently by OBJ is 65km.
There are many other too numerous to mention here.Leave Alex for us he is doing far better than your governor.What he commissioned few days ago is inner streets of Aba and Aba people love it.
You forgot

Arochukwu to Ohafia.
Isikwuato

People just dey display ignorance
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by kingsavage: 8:00pm On Jun 14, 2025
Why do you take what pakEASTerns say serious.
Naso them hype obîmbéçîlé wey flop as a governor grin
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by Ojiofor: 8:07pm On Jun 14, 2025
Okwyjesus:
You forgot

Arochukwu to Ohafia.
Isikwuato

People just dey display ignorance
That is why I said there are others too numerous to mention here.what Alex Otti have achieved in 2 years is unbelievable.
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by DesChyko:
UpaIweka:
Go to the x account user and argue your point..
That's so weird. You brought a post from a user like you, if it's not yourself, and used it to make a claim. Someone countered you, and you're redirecting; why using an evidence you have no faith in?

Also, Dapo Abiodun is the governor of Ogun State no? Did we not read recently that the Lagos-Ogun road is only good on the Lagos side? That's a road from the commercial hub of Nigeria o.

You people are major jokers. Alex Otti's impact is audible to the deaf and visible to the blind. The one you are presenting has his administration always in the news for terrible roads.
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by iluvdonjazzy: 6:39am On Jun 15, 2025
ikennahillary:
Here’s a detailed look at the roads commissioned by Governor Alex Otti in Abia State, with their respective lengths and commissioning dates:


---

🚧 Roads Commissioned by Alex Otti

1. Three Roads in Aba (Commissioned 13 Dec 2024)

Cemetery Road Phase II — 1.6 km

Umuocham Road — 2.7 km

Umule Road — 1.6 km
_Total: 5.9 km_


2. Dozie Way in Umuahia (Commissioned 26 Nov 2024)

Rehabilitated Dozie Way — 1.3 km


3. University Road, Green Avenue & College Road in Aba (Commissioned 29 May 2024)

Three inner-city roads (exact kilometre lengths not specified in sources).


4. Arochukwu–Ndi Okereke–Ozuabam Road (Flag‑off 21 Mar 2024)

Length — 30 km


5. Arochukwu–Ndiokereke–Okobo–Ozuabam Road (Commissioned 21 Mar 2024)

30 km (same as above; referenced concurrently)


6. Arochukwu–Ndiokereke–Ozuabam (component flagged earlier)

Another reference to a 30 km rehabilitation


7. Umuahia‑Uzuakoli‑Abiriba‑Ohafia Corridor (Flag‑off 8 Feb 2024)

Total length — ~67.6 km, broken into:

Umuahia to Uzuakoli — 22.6 km

Uzuakoli to Abiriba — 22.5 km

Abiriba to Ohafia — 22.5 km



8. Nunya–Eluama Road (Flag‑off 28 Mar 2024)

11.5 km


9. Onuinyang–Okporoenyi–Oboro–Ikwuano Road (Flag‑off 30 Jan 2025)

13 km



---

🧮 Summary of Total Kilometres Delivered

Project Segment Length (km)

Cemetery, Umuocham & Umule Roads 5.9
Dozie Way 1.3
Arochukwu–Ndiokereke–Ozuabam Pathway 30
Umuahia‑Uzuakoli‑Abiriba‑Ohafia Corridor 67.6
Nunya–Eluama Road 11.5
Onuinyang–Okporoenyi–Oboro–Ikwuano Road 13
**Total (explicit km)** 129.3 km+


_+Note: University, Green, and College Roads in Aba were commissioned but lengths not specified._


---

🔍 Additional Context

By June 2024, Otti reported reconstructing 90 roads across the state using a “Zero Pothole” strategy, with 16 roads totalling about 165 km completed and inaugurated .

Through direct labour and cost saving initiatives, many of these were delivered under budget.



---

Final Answer:
Based on documented sources, Governor Alex Otti has explicitly commissioned or flagged‑off at least 129.3 km of roads in Abia State. This includes major corridors and several inner-city streets. Beyond that, his administration cites reconstructing around 165 km across 16 roads by mid‑2024, with many additional urban roads commissioned later in 2024 and early 2025.
don't mind that nitwit jaare, for now Governor Otti of Abia state is the best performing governor.
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by saintkel(m): 6:44am On Jun 15, 2025
ikennahillary:
Here’s a detailed look at the roads commissioned by Governor Alex Otti in Abia State, with their respective lengths and commissioning dates:


---

🚧 Roads Commissioned by Alex Otti

1. Three Roads in Aba (Commissioned 13 Dec 2024)

Cemetery Road Phase II — 1.6 km

Umuocham Road — 2.7 km

Umule Road — 1.6 km
_Total: 5.9 km_


2. Dozie Way in Umuahia (Commissioned 26 Nov 2024)

Rehabilitated Dozie Way — 1.3 km


3. University Road, Green Avenue & College Road in Aba (Commissioned 29 May 2024)

Three inner-city roads (exact kilometre lengths not specified in sources).


4. Arochukwu–Ndi Okereke–Ozuabam Road (Flag‑off 21 Mar 2024)

Length — 30 km


5. Arochukwu–Ndiokereke–Okobo–Ozuabam Road (Commissioned 21 Mar 2024)

30 km (same as above; referenced concurrently)


6. Arochukwu–Ndiokereke–Ozuabam (component flagged earlier)

Another reference to a 30 km rehabilitation


7. Umuahia‑Uzuakoli‑Abiriba‑Ohafia Corridor (Flag‑off 8 Feb 2024)

Total length — ~67.6 km, broken into:

Umuahia to Uzuakoli — 22.6 km

Uzuakoli to Abiriba — 22.5 km

Abiriba to Ohafia — 22.5 km



8. Nunya–Eluama Road (Flag‑off 28 Mar 2024)

11.5 km


9. Onuinyang–Okporoenyi–Oboro–Ikwuano Road (Flag‑off 30 Jan 2025)

13 km



---

🧮 Summary of Total Kilometres Delivered

Project Segment Length (km)

Cemetery, Umuocham & Umule Roads 5.9
Dozie Way 1.3
Arochukwu–Ndiokereke–Ozuabam Pathway 30
Umuahia‑Uzuakoli‑Abiriba‑Ohafia Corridor 67.6
Nunya–Eluama Road 11.5
Onuinyang–Okporoenyi–Oboro–Ikwuano Road 13
**Total (explicit km)** 129.3 km+


_+Note: University, Green, and College Roads in Aba were commissioned but lengths not specified._


---

🔍 Additional Context

By June 2024, Otti reported reconstructing 90 roads across the state using a “Zero Pothole” strategy, with 16 roads totalling about 165 km completed and inaugurated .

Through direct labour and cost saving initiatives, many of these were delivered under budget.



---

Final Answer:
Based on documented sources, Governor Alex Otti has explicitly commissioned or flagged‑off at least 129.3 km of roads in Abia State. This includes major corridors and several inner-city streets. Beyond that, his administration cites reconstructing around 165 km across 16 roads by mid‑2024, with many additional urban roads commissioned later in 2024 and early 2025.
if it's about propaganda, leave it for those ibadan express media.....we know them....it didn't start today n probably won't end today.....just wait for 2026, u will cry out when d stats start coming out from that media outlet....not even surprised a bit
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by SeeWahala: 6:47am On Jun 15, 2025
saintkel:
if it's about propaganda, leave it for those ibadan express media.....we know them....it didn't start today n probably won't end today.....just wait for 2026, u will cry out when d stats start coming out from that media outlet....not even surprised a bit
Obidients are ready to match their propaganda fire for fire 🔥 cool

No sleeping on our votes in 2027;
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by UpaIweka(op): 12:59pm On Jun 15, 2025
You read from your ipob collegue.
Same ipob collegue no claim Tinubu as looted Lagos to oblivion so where did same Lagos get money to fix it own side of the road ?

You think you can argue senselessly to butress your foolish point.


DesChyko:
That's so weird. You brought a post from a user like you, if it's not yourself and used it to make a claim. Someone countered you, and you're redirecting; why using an evidence you have no faith in?

Also, Dapo Abiodun is the governor of Ogun State no? Did we not read recently that the Lagos-Ogun road is only good on the Lagos side? That's a road from the commercial hub of Nigeria o.

You people are major jokers. Alex Otti's impact is audible to the deaf and visible to the blind. The one you are presenting has his administration always in the news for terrible roads.
Re: KM Of Roads Alex Otti Commissioned After 2 Years As Governor by DesChyko: 5:27pm On Jun 15, 2025
UpaIweka:
You read from your ipob collegue.
Same ipob collegue no claim Tinubu as looted Lagos to oblivion so where did same Lagos get money to fix it own side of the road ?

You think you can argue senselessly to butress your foolish point.
How did Tinubu come into this argument, Sorry? What language are you even using??

You are not qualified to use the phrase 'argue senselessly', especially if you can't even spell colleague. 🤷🏾‍♂️

Go back to pre-K.

It's 'Upper' Iweka, by the way.
1 Reply

Rufai Oseni Reacts To Reno Omokri Driving 30 KM Of Commissioned Coastal RoadOnly Five States Can Build Over 100 Km Of Electricity Transmission Lines - EMRCGovernor Obaseki Commissions 6.8 KM Of Streetlights (Photos).234

Peter Obi In Talks With NDC For Soft LandingOpen Letter to Nigerian Bar AssociationGbenga Obasanjo And Kalu: What's The Relationship Between Them?