Am I Wrong? See Plan O by DREAMHOUSE765(op): 8:23pm On Dec 20, 2025
Good day all.

We thinking of building a house in lagos . A twin duplex to be specific. So the contractor recommended an architect, who we have paid. He submitted the initial drawings today and am in shock.

Pls see below. He is insisting the plan is ok since its semi but even in my layman eyes I see many things wrong.
1. Toilet covering the front, No windows??
2. In short am tired. Have a look and tell me how u would prefer this layout.

Re: Am I Wrong? See Plan O by DREAMHOUSE765(op): 8:24pm On Dec 20, 2025
Here is the upstairs

See bed to bed undecided

Re: Am I Wrong? See Plan O by sommerfeltservi: 9:49am On Mar 25
Let me give you full Bill of Quantity BOQ for both materials cost and Labour cost Chat 08099212590
DREAMHOUSE765:
Good day all.

We thinking of building a house in lagos . A twin duplex to be specific. So the contractor recommended an architect, who we have paid. He submitted the initial drawings today and am in shock.

Pls see below. He is insisting the plan is ok since its semi but even in my layman eyes I see many things wrong.
1. Toilet covering the front, No windows??
2. In short am tired. Have a look and tell me how u would prefer this layout.
Re: Am I Wrong? See Plan O by DREAMHOUSE765(op): 2:00am On Apr 06
I haven't even laid a single block and am being scammed.

How can I pay over 10.5m for building approval?

1, building processing fee..3,115,941.82
2, stage certification
A......1,090,579.46
B.......1, 090,579.46
3, tax 3,000,000 for 2 people.

Total= 8,297,100.74
Then-

Lupar 550
Authorization 1m
Running fee 900
Total 2.450m.

The property is only a semidetached house with 2 floors in AjaH.

Pls can anyone verify these?
Re: Am I Wrong? See Plan O by Stinekprojects: 8:19am On Apr 06
DREAMHOUSE765:
I haven't even laid a single block and am being scammed.

How can I pay over 10.5m for building approval?

1, building processing fee..3,115,941.82
2, stage certification
A......1,090,579.46
B.......1, 090,579.46
3, tax 3,000,000 for 2 people.

Total= 8,297,100.74
Then-

Lupar 550
Authorization 1m
Running fee 900
Total 2.450m.

The property is only a semidetached house with 2 floors in AjaH.

Pls can anyone verify these?
I think it’s on the highside. If you don’t mind we could talk on WhatsApp for proper guidance
Re: Am I Wrong? See Plan O by DREAMHOUSE765(op): 9:23am On Apr 06
Stinekprojects:
I think it’s on the highside. If you don’t mind we could talk on WhatsApp for proper guidance
Which area do u think is exaggerated?

I would appreciate if we can discuss here so others can benefit too.
Re: Am I Wrong? See Plan O by TopeQs: 10:44pm On Apr 07
DREAMHOUSE765:
I haven't even laid a single block and am being scammed.

How can I pay over 10.5m for building approval?

1, building processing fee..3,115,941.82
2, stage certification
A......1,090,579.46
B.......1, 090,579.46
3, tax 3,000,000 for 2 people.

Total= 8,297,100.74
Then-

Lupar 550
Authorization 1m
Running fee 900
Total 2.450m.

The property is only a semidetached house with 2 floors in AjaH.

Pls can anyone verify these?
LABSCA just jacked up their prices these past few weeks and it’s disturbing.

You need to have someone who works in their office directly that you can meet, not people loitering around, real staffs.

That’s the only way you can be sure of what you pay.
Re: Am I Wrong? See Plan O by DREAMHOUSE765(op): 2:39am On Apr 14
I just haveva feeling that the person am using that works in the officehas jackedthese prices ip.
I have no way of confirmingif these are real or not whoch is veryfrustrating
TopeQs:
LABSCA just jacked up their prices these past few weeks and it’s disturbing.

You need to have someone who works in their office directly that you can meet, not people loitering around, real staffs.

That’s the only way you can be sure of what you pay.
Re: Am I Wrong? See Plan O by DREAMHOUSE765(op): 3:03am On Apr 14
Am totally confused pls look at this calculations why am I paying the B part twice? On the certificate it is listed one time. But on the message they send me they said am paying stage certification 2 times. 1090m x 2

Re: Am I Wrong? See Plan O by TopeQs: 8:46am On Apr 14
DREAMHOUSE765:
I just haveva feeling that the person am using that works in the officehas jackedthese prices ip.
I have no way of confirmingif these are real or not whoch is veryfrustrating
It’s correct, for that stage certification, it’s now 70% of the building processing fee and not 35%, 35% x 2 = 70%. that’s they asked you to pay twice. It’s to Lagos state, not to an individual.

That’s part of the hike I am saying, I just found that out this year too.
Re: Am I Wrong? See Plan O by DREAMHOUSE765(op): 11:48am On Apr 14
Okk, atleast u understand i. I have paid it mak3 i get peqce.
TopeQs:
It’s correct, for that stage certification, it’s now 70% of the building processing fee and not 35%, 35% x 2 = 70%. that’s they asked you to pay twice. It’s to Lagos state, not to an individual.

That’s part of the hike I am saying, I just found that out this year too.
Re: Am I Wrong? See Plan O by TopeQs: 4:24am On Apr 15
You need a QS to give you security for your budget and to keep contractors for your building project.

I am still here to give you an accurate cost for your building project, if you want to have a priced bill of quantities to check whatever estimate contractors has sent to you or you want a list of cost of material and labour for your project if you want to take the construction in milestones.
I am here for you.


Contact: 07060515775
Re: Am I Wrong? See Plan O by TopeQs: 7:04am On Apr 19
TopeQs:
You need a QS to give you security for your budget and to keep contractors for your building project.

I am still here to give you an accurate cost for your building project, if you want to have a priced bill of quantities to check whatever estimate contractors has sent to you or you want a list of cost of material and labour for your project if you want to take the construction in milestones.
I am here for you.


Contact: 07060515775
Hi
1 Reply

234

Abuja Properties And Professional Realtors. (Genuine with papers)Geophysical Surveys, Borehole Drilling, Solar Powered Boreholes.4flats Of 3br And 3br Bungalow On Full Plot At Land At Ketu, Title R/c #30m Net