₦airaland Forum

Welcome, Guest: Register • Login • With Google • Trending • Recent • New

Stats: 3,346,426 members, 8,523,104 topics. Date: Sunday, 22 November 2026 at 05:43 PM

Toggle theme

Show Nigerians One Completed Project,” Amaechi Challenges Tinubu Govt - Politics - Nairaland

Nairaland Forum › Nairaland General › Politics › Show Nigerians One Completed Project,” Amaechi Challenges Tinubu Govt (183 Views)

1 Reply (Go Down)

Show Nigerians One Completed Project,” Amaechi Challenges Tinubu Govt by WorldPointMedia(op): 3:06pm On Oct 03

Re: Show Nigerians One Completed Project,” Amaechi Challenges Tinubu Govt by plessis: 3:44pm On Oct 03
This host na mumu man.

They asked you to mention one project you are reading presidential speech.
Re: Show Nigerians One Completed Project,” Amaechi Challenges Tinubu Govt by Ofunaofu: 3:54pm On Oct 03
plessis:
This host na mumu man.

They asked you to mention one project you are reading presidential speech.
AI generated presidential speech for that matter
Re: Show Nigerians One Completed Project,” Amaechi Challenges Tinubu Govt by Richtaiwo(m): 3:56pm On Oct 03
As of October 2026, there are a number of projects that the Tinubu administration has completed and commissioned. Some were inherited while others were initiated by the administration. Here are major completed/commissioned projects under the Tinubu administration:

1. Roads, bridges and transport infrastructure
Lagos–Calabar Coastal Highway, Phase I, Section I. The completed 30 km section from Ahmadu Bello Way to the Eleko Village area of Lagos.

Enugu–Port Harcourt Road, Section III (Enugu–Lokpanta) rehabilitated and commissioned.

East–West Road, Eleme Junction–Ahoada section. Completed section commissioned.

15km East–West Road, Eleme Junction–Onne Port Junction. Upgraded and commissioned.

Lagos–Shagamu–Ibadan Dual Carriageway, SectionIII. Rehabilitation construction and expansion.
Ikorodu–Shagamu Road. Rehabilitated section commissioned.

Eko Bridge, Lagos 4.1km comprehensive emergency repair, including ramps, commissioned.

Lekki Deep Sea Port Access Road. commissioned in June 2025.

Shendam Bridge, Plateau State. Completed and commissioned.

Jimeta Bridge, Yola, Adamawa. Completed and commissioned.

Cham–Numan Bridge, Adamawa. Completed and commissioned.

Akpoha Bridge, Ebonyi. New bridge replacing the near-collapsed bridge.

New Artisan Market Bridge, Enugu. Reconstruction of the collapsed bridge.

Yakasai–Badume–Damargu–Marken Zalli roads, Kano. Reconstructed and commissioned.

Kano–Kwanar Danja–Hadejia, Section II (Kano–Tsalle). Reconstructed section commissioned.

Ilobu–Erinle Road, Kwara/Osun. Completed and commissioned.

Calabar–Ugep–Katsina-Ala Road, Section II. Rehabilitated section commissioned.

A2–Pai Town Road, Kwali, FCT, 15 km. Commissioned in June 2025.

Kuje–Gwagwalada Dual Carriageway, Phase I. Commissioned in June 2026.

Arterial Road N5/Obafemi Awolowo Way, Abuja. Full-scope development from Life Camp Junction to Ring Road III commissioned.

Collector Road C01 and bridge, Institution & Research District, Abuja. Newly constructed and commissioned in July 2026.

2. Health infrastructure

Bola Tinubu Specialist Complex, Federal Medical Centre Jabi, Abuja. Newly completed specialist healthcare complex.

Lagos Immunisation Supply Chain Hub, Oshodi. Completed under the World Bank-supported IMPACT programme.

Nearly 3,000 primary healthcare centres reportedly revitalised under the IMPACT programme.

27 Comprehensive Emergency Obstetric and Newborn Care sites established.
1,602 Level-1 and 1,360 Level-2 health facilities reportedly revitalised across the six geopolitical zones.


3. CNG and gas infrastructure

Portland Gas CNG Mother Station, Ojota, Lagos.
IOGC CNG Refuelling Station, Ojota, Lagos.

High-Capacity CNG Daughter Booster Station, Jahi, Abuja.

FEMADEC CNG Daughter Station and Conversion Centre, FUTO, Owerri �
State House Abuja.

The Lagos IOGC project is part of a larger planned network of CNG stations across Lagos.

4. Education

School of Science Complex, Nasarawa State College of Education, Akwanga.

Remodelled Senate Building, Nigerian Defence Academy, Kaduna.

Biodiversity and Conservation Centre, NDA
Classrooms Complex, Hussaini Adamu.

Federal Polytechnic, Kazaure
Students' Hostel, Sa'adu Zungur University, Gadau, Bauchi.

5. FCT infrastructure

Paikon-Kore–Ibwa Road — 9 km.

Gaba–Tokulo Road — 5 km, including a two-span river bridge.

Tipper Garage Junction–LEA Secretariat Road, Kuje — 5 km.

Yangoji–Sukuku–Ebo Road — 11 km
Saburi 1 & 2 Road — 5 km.

Aguma Palace–Radio Nigeria–New Market Road.

There are also the later Kuje–Gwagwalada Dual Carriageway, Obafemi Awolowo Way (N5) and Collector Road C01/Bridge projects mentioned above.

Go and verify.
Re: Show Nigerians One Completed Project,” Amaechi Challenges Tinubu Govt by Kalashnikov49: 4:07pm On Oct 03
You can never be original. Very insecure people.

Questions are now being asked and you are reeling out useless propaganda.

Go and verify (sophisticated cooycats) angry
Richtaiwo:
As of October 2026, there are a number of projects that the Tinubu administration has completed and commissioned. Some were inherited while others were initiated by the administration. Here are major completed/commissioned projects under the Tinubu administration:

1. Roads, bridges and transport infrastructure
Lagos–Calabar Coastal Highway, Phase I, Section I. The completed 30 km section from Ahmadu Bello Way to the Eleko Village area of Lagos.

Enugu–Port Harcourt Road, Section III (Enugu–Lokpanta) rehabilitated and commissioned.

East–West Road, Eleme Junction–Ahoada section. Completed section commissioned.

15km East–West Road, Eleme Junction–Onne Port Junction. Upgraded and commissioned.

Lagos–Shagamu–Ibadan Dual Carriageway, SectionIII. Rehabilitation construction and expansion.
Ikorodu–Shagamu Road. Rehabilitated section commissioned.

Eko Bridge, Lagos 4.1km comprehensive emergency repair, including ramps, commissioned.

Lekki Deep Sea Port Access Road. commissioned in June 2025.

Shendam Bridge, Plateau State. Completed and commissioned.

Jimeta Bridge, Yola, Adamawa. Completed and commissioned.

Cham–Numan Bridge, Adamawa. Completed and commissioned.

Akpoha Bridge, Ebonyi. New bridge replacing the near-collapsed bridge.

New Artisan Market Bridge, Enugu. Reconstruction of the collapsed bridge.

Yakasai–Badume–Damargu–Marken Zalli roads, Kano. Reconstructed and commissioned.

Kano–Kwanar Danja–Hadejia, Section II (Kano–Tsalle). Reconstructed section commissioned.

Ilobu–Erinle Road, Kwara/Osun. Completed and commissioned.

Calabar–Ugep–Katsina-Ala Road, Section II. Rehabilitated section commissioned.

A2–Pai Town Road, Kwali, FCT, 15 km. Commissioned in June 2025.

Kuje–Gwagwalada Dual Carriageway, Phase I. Commissioned in June 2026.

Arterial Road N5/Obafemi Awolowo Way, Abuja. Full-scope development from Life Camp Junction to Ring Road III commissioned.

Collector Road C01 and bridge, Institution & Research District, Abuja. Newly constructed and commissioned in July 2026.

2. Health infrastructure

Bola Tinubu Specialist Complex, Federal Medical Centre Jabi, Abuja. Newly completed specialist healthcare complex.

Lagos Immunisation Supply Chain Hub, Oshodi. Completed under the World Bank-supported IMPACT programme.

Nearly 3,000 primary healthcare centres reportedly revitalised under the IMPACT programme.

27 Comprehensive Emergency Obstetric and Newborn Care sites established.
1,602 Level-1 and 1,360 Level-2 health facilities reportedly revitalised across the six geopolitical zones.


3. CNG and gas infrastructure

Portland Gas CNG Mother Station, Ojota, Lagos.
IOGC CNG Refuelling Station, Ojota, Lagos.

High-Capacity CNG Daughter Booster Station, Jahi, Abuja.

FEMADEC CNG Daughter Station and Conversion Centre, FUTO, Owerri �
State House Abuja.

The Lagos IOGC project is part of a larger planned network of CNG stations across Lagos.

4. Education

School of Science Complex, Nasarawa State College of Education, Akwanga.

Remodelled Senate Building, Nigerian Defence Academy, Kaduna.

Biodiversity and Conservation Centre, NDA
Classrooms Complex, Hussaini Adamu.

Federal Polytechnic, Kazaure
Students' Hostel, Sa'adu Zungur University, Gadau, Bauchi.

5. FCT infrastructure

Paikon-Kore–Ibwa Road — 9 km.

Gaba–Tokulo Road — 5 km, including a two-span river bridge.

Tipper Garage Junction–LEA Secretariat Road, Kuje — 5 km.

Yangoji–Sukuku–Ebo Road — 11 km
Saburi 1 & 2 Road — 5 km.

Aguma Palace–Radio Nigeria–New Market Road.

There are also the later Kuje–Gwagwalada Dual Carriageway, Obafemi Awolowo Way (N5) and Collector Road C01/Bridge projects mentioned above.

Go and verify.
Re: Show Nigerians One Completed Project,” Amaechi Challenges Tinubu Govt by yarimo(m): 4:50pm On Oct 03
Ameachi is looking for media attention by fire by force, nothing to campaign with grin
1 Reply

Umahi Defends East-West Road Commissioning, Says Phase One Completed • 20,000 Nigerians Employed For Lagos-ibadan Rail Project – Amaechi • Coronavirus Outbreak May Delay Lagos-ibadan Rail Project – Amaechi • 2 • 3 • 4

Peter Obi Breaks The Internet! Retired Soldier Speaks On Tiktok Live. • Moment President Tinubu Kisses The Black Stone (hajar Al-aswad) During His Visit • ADC Judgment: If Atiku Decides To Accept It, It's A Done Deal For Peter Obi