Cost Of Constructing A 4 Bedroom Bungalow In A Relatively Water Logged Land. by Codename007(op): 4:25pm On Nov 16, 2015
Hi Folks, Please can someone give me a detailed breakdown of the cost of constructing a 4 bedroom bungalow in a relatively water logged land in the Ajah axis.Thanks
Re: Cost Of Constructing A 4 Bedroom Bungalow In A Relatively Water Logged Land. by adebaxton(m):
What's the dimension of the land and other features of the bungalow, Any design for the proposed project yet?

Kindly email me in details.

Reach Us: 08058307787
Email: access2m@yahoo.com
access2m@hotmail.com
Re: Cost Of Constructing A 4 Bedroom Bungalow In A Relatively Water Logged Land. by Xzevian(m): 9:56pm On Nov 16, 2015
following. .......
Re: Cost Of Constructing A 4 Bedroom Bungalow In A Relatively Water Logged Land. by olumide4christ: 1:58am On Nov 17, 2015
Codename007:
Hi Folks, Please can someone give me a detailed breakdown of the cost of constructing a 4 bedroom bungalow in a relatively water logged land in the Ajah axis.Thanks
OP, I don't think anybody on this forum can TRULY give you a detailed breakdown UNTIL you engage a structural engineer to carry out a soil test to determine what sort of foundation would be suitable for that waterlogged land.

Professionally, I advise people not to purchase waterlogged land no matter how cheap because the works that would need to be done in terms of sandfilling, retaining wall, piling in order to SUCCESSFULLY erect a building on it may far outweigh the cost of the land and even the building to be built on it.

However, if you have already purchased the land, let a soil test be carried out first.

BTW - I'm a Quantity Surveyor, so I know this.
Re: Cost Of Constructing A 4 Bedroom Bungalow In A Relatively Water Logged Land. by Codename007(op): 11:24pm On Nov 17, 2015
olumide4christ:
OP, I don't think anybody on this forum can TRULY give you a detailed breakdown UNTIL you engage a structural engineer to carry out a soil test to determine what sort of foundation would be suitable for that waterlogged land.
Professionally, I advise people not to purchase waterlogged land no matter how cheap because the works that would need to be done in terms of sandfilling, retaining wall, piling in order to SUCCESSFULLY erect a building on it may far outweigh the cost of the land and even the building to be built on it.
However, if you have already purchased the land, let a soil test be carried out first.
BTW - I'm a Quantity Surveyor, so I know this.
Thanks guys....The land gets dry during the dry season.I found out raft foundation is usually used for constructing the foundation.I need a rough estimate of the cost for a simple bungalow..Thanks
Re: Cost Of Constructing A 4 Bedroom Bungalow In A Relatively Water Logged Land. by olumide4christ: 12:39am On Nov 18, 2015
Codename007:
Thanks guys....The land gets dry during the dry season.I found out raft foundation is usually used for constructing the foundation.I need a rough estimate of the cost for a simple bungalow..Thanks
Well, like someone said above me, you need at least the floor plan/dimensions of the proposed bungalow to arrive at an estimate which will not be as accurate as you having structural details of the foundation which is obtainable from a structural engineer.

That's what the QS needs to determine the detailed breakdown.
Re: Cost Of Constructing A 4 Bedroom Bungalow In A Relatively Water Logged Land. by eghosajohnny: 4:05am On Nov 18, 2015
The cost breakdown

30 tons of granite 140,000
Cement 150@1500=225,000
Plank 300 1x12x12 @1,100=330,000
12mm 2tons=210,000
2x2 wood 100=35000
Laterite 10 trucks 300,000
Sand 2trucks 90,000
Transportation nail,banding wire=40,000
General labour 500k
Supervision can be discussed

Call 07014709098

I have a good plan I can use for this building
1 Reply