Power Distribution Firms Reject Supply From Generating Plants by Islie(op): 1:44pm On Mar 16, 2016
https://static.pulse.ng/img/incoming/origs4069601/9845562637-w644-h429/Babatunde-Fashola.jpg
Minister of Power, Works and Housing, Mr. Babtunde Fashola
’Femi Asu

The rejection of load allocations from power generating plants by some electricity distribution companies is one of the factors preventing the country from fully benefitting from the 6,500 megawatts generation capacity of the existing power plants.

Our correspondent gathered that some power plant units were being shut due to high frequency occasioned by the inability of the distribution companies to pick their load allocations.


For instance, the nation lost about 2,821.5MW of electricity generation on Monday partly due to the rejection of loads by the Discos, it was exclusively gathered from top industry sources.

The nation’s electricity generation as of 6.00am on Monday stood at 3,548.7MW, while the combined generation capacity of the power plants was put at 6,370.2MW.
Some of the plants affected by the load rejection or low load demand were Shiroro, Jebba, Egbin, Okpai and Afam VI.
Others are plants under the National Integrated Power Project, including Alaoji, Odukpani and Ihovbor.

Shiroro and Jebba saw their generation levels reduce to 200MW and 260MW, compared to capacities of 300MW and 341MW, respectively. Odukpani generated 60.1MW instead of its capacity of 360MW; Egbin, 820MW (880MW); Alaoji, 51.5MW (117MW); Ihovbor, 78.4Mw (109MW); Okpai, 282MW (366MW); and Afam VI, 378MW (555MW).

The General Secretary, National Union of Electricity Employees, Mr. Joe Ajaero, had claimed in a statement on Monday that the real saboteurs of the power sector were those who refused allocations from the national grid for onward distribution to consumers.

A former top executive in one of the power firms explained to our correspondent that a distribution company could decide to reject load due to low revenue generation from a segment of its customer base.

The Managing Director and Chief Executive Officer, Eko Electricity Distribution Company, Mr. Oladele Amoda, told our correspondent in a telephone interview that load rejection could be as a result of capacity issues between the transmission and distribution networks.

He said, “In some cases, there is no enough transmission equipment capacity to wheel power to the Discos. Sometimes, the Discos also do have issues; that is when there is powerful wind, which, sometimes, leads to tripping of the breaker. But it doesn’t take time before that is restored.
“Everybody knows that the weakest link in the power value chain is transmission. So, the blame cannot be put solely on the Discos.”

According to Amoda, the nation’s transmission network cannot wheel more than 6,000MW, while the distribution networks nationwide can take more than 10,000MW.

“At Eko Disco, we are not rejecting load. We are not even getting up to our allocated percentage because of constraints on the transmission equipment,” he said, adding that the company had spent more than N11bn on network rehabilitation and reinforcement, among others.
Amoda said the government was working on improving the transmission capacity, noting that the Transmission Company of Nigeria had been starved of funds for a very long time.

“The government is looking into how to quickly strengthen it financially and with all the provisions that it will require to quickly ramp up its capacity,” he stated.

The Managing Director/Chief Executive Officer, Nigerian Bulk Electricity Trading Plc, Mr. Rumundaka Wonodi, said, “When the Discos reject load allocation, the question is why are they rejecting it? It could be that their system is weak, which is why we keep talking about the need for investment.
“When this (load rejection) happens, it has an effect all through the value chain because generation companies cannot generate power and maybe they have ‘take or pay’ obligation on their gas supply; so, they have to pay for gas that they did not utilise at that time.”

The Chairman, Egbin Power Plc, Mr. Kola Adesina, said the talk that the Discos were rejecting allocation was an indication that there was a major problem far more significant than frequency and pressure of gas.

“There is no justification for somebody to reject power. You need power to make money. You need money to be able to pay your loan, to be able to continue to service the system. So, nobody will naturally want to do that,” he said.

The spokesperson for the Kano Electricity Distribution Company, Mr. Muhammed Kandi, said, “In Kano Disco, we do not drop load. In fact, we don’t get enough allocation; so why should we even drop load in the first place?”
He explained that the company only received about 260MW on Tuesday morning, compared to a maximum energy demand of 600MW.

The Acting Chief Executive Officer, Nigerian Electricity Regulatory Commission, Mr. Anthony Akah, said, “Clearly, the issue of load rejection has been addressed by the commission. Under the new regime, that is the Transitional Electricity Market, the distribution companies can no longer reject load that is within the allocation level that they are supposed to get.

“If it is due to the constraint of the distribution companies, they will be penalised for that. If it is the transmission company, it will also have to be penalised. That essentially has been taken care of, unless there are other reasons behind why it happened.”

The Chief Executive Officer, Association of Nigerian Electricity Distributors, Mr. Azu Obiaya, said, “It is irrational that anyone of these Discos will reject load right now because they desperately need the power to, first of all, meet their revenue requirements as well as distribute to their customers.”
www.punchng.com/power-distribution-firms-reject-supply-from-generating-plants/

lalasticlala
Re: Power Distribution Firms Reject Supply From Generating Plants by FOLYKAZE(m): 1:47pm On Mar 16, 2016
Licence of any Power distributors who is not serving Nigerians enough should be withdrawn. They are nothing but saboteurs.

Someone should pls inform Ondo State government that there has been no light in Odigbo LGA, Okitipupa LGA, Ese-odo LGA and Irele LGA for the past two years. Some people were complaining about 4days blackout but here in Ondo state, there is total black out for good two years with no possibility of hope coming our way.
Re: Power Distribution Firms Reject Supply From Generating Plants by Islie(op): 1:48pm On Mar 16, 2016
A former top executive in one of the power firms explained to our correspondent that a distribution company could decide to reject load due to low revenue generation from a segment of its customer base.
The General Secretary, National Union of Electricity Employees, Mr. Joe Ajaero, had claimed in a statement on Monday that the real saboteurs of the power sector were those who refused allocations from the national grid for onward distribution to consumers.
the real saboteur of power will soon reveal themselves
events and happening will unmask their faces........
these saboteur lives among us and they aren't from space be it government, private investors and powerful clique.
Re: Power Distribution Firms Reject Supply From Generating Plants by BeeBeeOoh(m): 1:49pm On Mar 16, 2016
If you want to gain likes on NL, just type "Buhari Is A Dullard or Buhari Is Clueless.. E.g







Buhari Is A Dullard
Re: Power Distribution Firms Reject Supply From Generating Plants by truthalways(m):
This is sabotage

Any disco refusing supply from the generating plants should be fined...shikena

We need companies who can do their jobs.
Re: Power Distribution Firms Reject Supply From Generating Plants by ijustdey: 2:24pm On Mar 16, 2016
if truly some disco are rejecting load capacity that is theirs


why can't it be transfer to those that needs it and do have the capacity to pay
Re: Power Distribution Firms Reject Supply From Generating Plants by mycar:
Hmm, but we are forced to pay for what was not given to us, they should also be made to pay whether they sell or not, with that they would be forced to fix whatever fails in the network.
Re: Power Distribution Firms Reject Supply From Generating Plants by rottennaija(m): 2:34pm On Mar 16, 2016
We will get there. PMB must succeed. I know he can, I believe he will
Re: Power Distribution Firms Reject Supply From Generating Plants by Nobody: 2:35pm On Mar 16, 2016
DP
Re: Power Distribution Firms Reject Supply From Generating Plants by Nobody: 2:35pm On Mar 16, 2016
The government should have broken down the transmission network and sold it to the Gencos. Tribalism and federal xter will not let them unbundle the national grid
Re: Power Distribution Firms Reject Supply From Generating Plants by dunkem21(m): 2:37pm On Mar 16, 2016
Obiagelli:
The government should have broken down the transmission network and sold it to the Gencos. Tribalism and federal xter will not let them unbundle the national grid
Summarily, this government is clueless, incompetent and tribalistic - Obiagelli cheesy
Re: Power Distribution Firms Reject Supply From Generating Plants by stevecantrell: 2:40pm On Mar 16, 2016
The power minister should sanction these saboteurs, unless maybe he's in on the act.
Re: Power Distribution Firms Reject Supply From Generating Plants by magicalx(m): 2:41pm On Mar 16, 2016
No light for Mini Orlu, Location Port Harcourt. abeg phed try oh!
Re: Power Distribution Firms Reject Supply From Generating Plants by sdindan: 2:44pm On Mar 16, 2016
Lies
APC trying to cover their shame.
Re: Power Distribution Firms Reject Supply From Generating Plants by Truckpusher(m): 2:46pm On Mar 16, 2016
FOLYKAZE:
Licence of any Power distributors who is not serving Nigerians enough should be withdrawn. They are nothing but saboteurs.

Someone should pls inform Ondo State government that there has been no light in Odigbo LGA, Okitipupa LGA, Ese-odo LGA and Irele LGA for the past two years. Some people were complaining about 4days blackout but here in Ondo state, there is total black out for good two years with no possibility of hope coming our way.
You called them saboteurs , how ? What did they sabotage ? What's the main cause of the rejection . This is the only way we can salvage this counrty else we are stuck .
Re: Power Distribution Firms Reject Supply From Generating Plants by Nobody: 2:50pm On Mar 16, 2016
dunkem21:
Summarily, this government is clueless, incompetent and tribalistic - Obiagelli cheesy
Actually the government that did the privatisation
Re: Power Distribution Firms Reject Supply From Generating Plants by chinchum(m): 2:54pm On Mar 16, 2016
ijustdey:
if truly some disco are rejecting load capacity that is theirs



why can't it be transfer to those that needs it and do have the capacity to pay
There is a defined allocation quota to all the 13 discos. Each discos get a defined fraction of what is generated.
Re: Power Distribution Firms Reject Supply From Generating Plants by Pavore9: 2:57pm On Mar 16, 2016
We just want power supply!
Re: Power Distribution Firms Reject Supply From Generating Plants by dunkem21(m): 2:57pm On Mar 16, 2016
Obiagelli:
Actually the government that did the privatisation
Goal post shifted
Re: Power Distribution Firms Reject Supply From Generating Plants by Nobody: 3:09pm On Mar 16, 2016
dunkem21:
Goal post shifted
These ones promised to sell the TCN, lets wait and see. I prefer breakup of the transmission network
Re: Power Distribution Firms Reject Supply From Generating Plants by LadyExcellency: 3:12pm On Mar 16, 2016
The capacity to generate is different from the actual power generated.

The handover document to APC by GEJ's administration contains a paragraph stipulating that we have the capacity to generate 12000Mw already but the gas infrastructure and transmission networks are still inadequate hence the new government should work on them as to deliver the output to the final consumers.
Re: Power Distribution Firms Reject Supply From Generating Plants by dragonking2: 3:16pm On Mar 16, 2016
Sai buhari sai changi

Over 2 weeks no light, no fuel...Exchange rate is high, cost of food and housing is high..No jobs created while the dullard is enjoying himself in mallabu with another bae. angry angry
Re: Power Distribution Firms Reject Supply From Generating Plants by gabp9301(f): 3:16pm On Mar 16, 2016
angry angry
Re: Power Distribution Firms Reject Supply From Generating Plants by 5starmilitant:
Impotent government, nothing seems to be working under their watch.



And the C in C is busy galavanting the streets of Malabo.
Re: Power Distribution Firms Reject Supply From Generating Plants by MadCow1: 3:18pm On Mar 16, 2016
Lol!


Thats not even plausible.
Re: Power Distribution Firms Reject Supply From Generating Plants by Suspect33(m): 3:18pm On Mar 16, 2016
There's constant power supply in the north, whats happening to the east, west and south? undecided
Re: Power Distribution Firms Reject Supply From Generating Plants by DBossNG(m): 3:18pm On Mar 16, 2016
OK
Re: Power Distribution Firms Reject Supply From Generating Plants by henrydadon(m): 3:18pm On Mar 16, 2016
giant of Africa that is incapable of producing stable power supply.. undecided
Re: Power Distribution Firms Reject Supply From Generating Plants by Critiqual(m): 3:18pm On Mar 16, 2016
Na we dey still dey do ourselves.

Wayray ni gbogbo yin
Re: Power Distribution Firms Reject Supply From Generating Plants by Nobody:
?

The Managing Director and Chief Executive Officer, Eko Electricity Distribution Company, Mr. Oladele Amoda, told our correspondent in a telephone interview that load rejection could be as a result of capacity issues between the transmission and distribution networks.

He said, “In some cases, there is no enough transmission equipment capacity to wheel power to the Discos. Sometimes, the Discos also do have issues; that is when there is powerful wind, which, sometimes, leads to tripping of the breaker. But it doesn’t take time before that is restored.
“Everybody knows that the weakest link in the power value chain is transmission. So, the blame cannot be put solely on the Discos.”

According to Amoda, the nation’s transmission network cannot wheel more than 6,000MW, while the distribution networks nationwide can take more than 10,000MW
.

“At Eko Disco, we are not rejecting load. We are not even getting up to our allocated percentage because of constraints on the transmission equipment,” he said, adding that the company had spent more than N11bn on network rehabilitation and reinforcement, among others.
Amoda said the government was working on improving the transmission capacity, noting that the Transmission Company of Nigeria had been starved of funds for a very long time.

“The government is looking into how to quickly strengthen it financially and with all the provisions that it will require to quickly ramp up its capacity,” he stated.
I remember reading an article in the Nigerian Guardian shortly after the DISCOS took over....and they said that they were handed over one big wretched obsolete mess called Nigeria's electricity transmission system,,,,,,,I knew that the problem was serious.

One of the DISCOS's management staff even expressed surprise how the transmission system was able to work despite being so wretched.