Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 - Properties (2) - Nairaland
Nairaland Forum › Nairaland General › Properties › Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 (12124 Views)
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:37pm On May 25, 2016 |
Picture showing external wall tiling works...
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:39pm On May 25, 2016 |
Picture showing the Master's Bedroom walk-in closet...
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:40pm On May 25, 2016 |
Picture showing Kitchen...
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:42pm On May 25, 2016 |
Picture showing one of the guest bedrooms...
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:45pm On May 25, 2016 |
Picture showing granite floor tiling works almost completed in Family Lounge...
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:46pm On May 25, 2016 |
Picture showing Staircase almost completed...
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:49pm On May 25, 2016 |
Picture showing Staircase windows...
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by NL1960: 2:52pm On May 25, 2016 |
architectB:Please is it possible you share the number of staircase(upper and lower) and the cost for this stainless steel. |
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:54pm On May 25, 2016 |
Picture showing the main Lounge almost completed with the Glass blocks, Burglaries, granite floor Tiles, etc installed...
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 3:17pm On May 25, 2016 |
Picture showing an almost completed Kitchen...
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 3:21pm On May 25, 2016 |
Picture showing on boing Interlocking stone works...
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 3:26pm On May 25, 2016 |
Picture showing completed Interlocking stone works, completed external screeding works ready to receive Paint...
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 3:30pm On May 25, 2016 |
Picture showing the boy's room...
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 3:34pm On May 25, 2016 |
Picture showing yet to be completed Girl's Room...
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by kino47: 4:07pm On May 25, 2016*. Modified: 1:48am On Aug 15, 2021 |
Nice job |
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 7:41pm On May 25, 2016 |
Picture taken from the Family Lounge showing the staircase area...
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 7:59pm On May 25, 2016 |
Picture showing Family Lounge / Staircase Lobby...
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 8:25pm On May 25, 2016 |
Picture showing the staircase taken from the Main Lounge
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 8:35pm On May 25, 2016 |
Picture showing Ante-room...
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 8:42pm On May 25, 2016 |
Picture showing the Lounge...
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 8:52pm On May 25, 2016 |
Picture showing the Lounge taken from the Dining,,,
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 8:55pm On May 25, 2016 |
Picture showing External Painting in progress...
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 9:01pm On May 25, 2016 |
Picture showing near finished Building after painting works...
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 9:05pm On May 25, 2016 |
Picture of finished Building...
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 9:09pm On May 25, 2016 |
Picture of Left-side of finished building...
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 9:13pm On May 25, 2016 |
Picture of the right side of the finished building...
|
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 9:24pm On May 25, 2016 |
kino47:Thanks a lot... The foundation is fully Raft and we had to dig to about 600mm depth... The height/thickness of the concrete blinding used for this project was 300mm and it was reinforced... Remember that every project is perculiar to itself hence you may not necessarily do exactly what we did. |
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 9:30pm On May 25, 2016 |
NL1960:Good evening, It is just a duplex hence it has just one staircase with about 21 risers/steps. The cost of the stainless steel railings was about 600k. Thanks. |
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by erico2k2(m): 11:26pm On May 25, 2016 |
architectB:nice |
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by mufutau55(m): 2:02am On May 26, 2016 |
What size of iron is used for the burglary, is it 10mm, 12mm or 16mm and is it a solid round iron or square solid type? Good now that you stayed with one thread instead of many... Very nice building indeed. What is the total estimated cost, if you can reveal, if not it's OK. Hajji M. |
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by Nobody: 2:33am On May 26, 2016 |
1) You used some of the best wood that I've seen in the industry on this project. 2) Good lord, if this is a cash-strapped client, I'll like to see what a loaded client would do. 3) The tile selection is impeccable. Not sure why folks just seem to do the humdrum 24X24 only instead of trying new styles. 4) The tileman is a wizard, even the holes in the tiles for pipes is perfect. This is as perfect as a build as I've seen. A tip of my bowler hat to you Sir. Job absolutely well done. |
| Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by msogunro: 3:41am On May 26, 2016 |
architectB: Are you able to share the total cost of the project? |
How Much Will A 5 Bedroom Duplex Cost? • Can I Build A 5-bed Room Bungalow In Half Plot Of Land • Construction Of Six Bedroom Duplex At Enugu • 2 • 3 • 4
How To Obtain Certificate Of Occupancy In Oyo State • Locally Made Furniture Market Place • Zilt Consulting Firm, Ibadan (BUILDINGS, ACRES & PLOTS OF LAND FOR SALE)