Fashola Inspects Azura-edo 2000MW Project - Politics (4) - Nairaland
Nairaland Forum › Nairaland General › Politics › Fashola Inspects Azura-edo 2000MW Project (23824 Views)
| Re: Fashola Inspects Azura-edo 2000MW Project by Sajio(m): 6:39am On Jul 13, 2016 |
APC with propaganda sha....... this is Gejs project, he started and left it in almost completion stage. the pipe where the gas will pass thru to the turbine was laid from calaba thru delta state and was almost in Edo b4 the election. so how come Fashola is now doing site seeing and posing in pics like he initiated the project. And beside the Power station is designed to generate only 450mw and not 2000mw. ENOUGH OF THIS LIES plzzzzzzz! |
| Re: Fashola Inspects Azura-edo 2000MW Project by agitator: 7:17am On Jul 13, 2016 |
VIPERVENOM:APC propaganda machinery is making to it look like FG started a power project in January 2016 and its about to be completed. Stop misinforming the public. ![]() |
| Re: Fashola Inspects Azura-edo 2000MW Project by agitator: 7:33am On Jul 13, 2016 |
KINGinVAHALA:You want to be king and you are telling lies? How much did Edo contribute? |
| Re: Fashola Inspects Azura-edo 2000MW Project by KINGinVAHALA: 7:47am On Jul 13, 2016 |
agitator:Would have given you a reply with facts and pictures but since you have already said I lied, then we should let it remain that way. Good morning bro! |
| Re: Fashola Inspects Azura-edo 2000MW Project by agitator: 8:29am On Jul 13, 2016 |
KINGinVAHALA:I only asked how much Edo government contributed, and you are mentioning pictures. What has that got to do with pictures? ![]() |
Babatunde Fashola Inspects The Dualization Of Lokoja-Benin Road (Photos) • Fashola Inspects 450 MW Azura Independent Power Plant In Benin (Photos) • Century Power Begins 2000mw Power Plant Construction In Anambra • 2 • 3 • 4
Nigeria On The Edge Of Bankruptcy - Punch • OPC Sacks Fasehun, Appoints New Leader • 2016 Budget: Buhari To Spend More Than Jonathan On Presidential Villa - Vanguard
