Pics:Julius Berger At Work On Lagos-Ibadan Expressway On Fashola Directive 2day - Politics - Nairaland
Nairaland Forum › Nairaland General › Politics › Pics:Julius Berger At Work On Lagos-Ibadan Expressway On Fashola Directive 2day (1615 Views)
| Pics:Julius Berger At Work On Lagos-Ibadan Expressway On Fashola Directive 2day by chimere66(op): 5:59pm On Oct 03, 2016 |
PIX ONE & TWO : Personnel of Julius Berger Nigeria Plc at work near the Long Bridge in continuation of the reconstruction, expansion and rehabilitation of the Lagos - Ibadan Expressway on Monday October 3rd, 2016 in fulfilment of the commitment given by the Ministry of Power, Works & Housing that the company would be on site during the Public Holidays in order to speed up work and improve the experience of commuters on the road. PIX THREE : Personnel of Julius Berger Nigeria Plc cleaning and sweeping in preparation for spraying of Tack Coat on Deck on pile (Long Bridge) on Monday October 3rd in fulfilment of the commitment given by the Ministry of Power, Works & Housing that work on the reconstruction and expansion of the Lagos - Ibadan Expressway would continue during the Public Holidays in order to speed up the rehabilitation and improve the experience of commuters on the road. Credit: Segun Odunuyi Source: http://www.trezzyhelm.com/2016/10/pictures-julius-berger-at-work-on-lagos.html
|
| Re: Pics:Julius Berger At Work On Lagos-Ibadan Expressway On Fashola Directive 2day by sarrki(m): 6:01pm On Oct 03, 2016 |
Baba please don't Disappoint us We that voted and believe in you Pls sire God bless you God bless federal republic of Nigeria |
| Re: Pics:Julius Berger At Work On Lagos-Ibadan Expressway On Fashola Directive 2day by babyfaceafrica: 6:07pm On Oct 03, 2016 |
Nigeria will be great |
| Re: Pics:Julius Berger At Work On Lagos-Ibadan Expressway On Fashola Directive 2day by oduastates: 6:30pm On Oct 03, 2016 |
You can see Jonathan's transformation on the cracked road |
| Re: Pics:Julius Berger At Work On Lagos-Ibadan Expressway On Fashola Directive 2day by Nobody: 6:35pm On Oct 03, 2016 |
Which part of Lagos Ibadan Express is this? Were there drains along the road in the past. |
| Re: Pics:Julius Berger At Work On Lagos-Ibadan Expressway On Fashola Directive 2day by Ikwokrikwo: 6:36pm On Oct 03, 2016 |
Yorubas and their stupid propaganda. |
| Re: Pics:Julius Berger At Work On Lagos-Ibadan Expressway On Fashola Directive 2day by donphilopus: 7:14pm On Oct 03, 2016 |
Ikwokrikwo:Your kinsmen and their stupid wailing. |
| Re: Pics:Julius Berger At Work On Lagos-Ibadan Expressway On Fashola Directive 2day by Nobody: 7:38pm On Oct 03, 2016 |
Ok |
| Re: Pics:Julius Berger At Work On Lagos-Ibadan Expressway On Fashola Directive 2day by Osyxcel(m): 8:28pm On Oct 03, 2016*. Modified: 10:11pm On Oct 03, 2016 |
Keneking:There are actually drains at that portion of the road, but they were blocked by sand and overgrown with weeds |
| Re: Pics:Julius Berger At Work On Lagos-Ibadan Expressway On Fashola Directive 2day by Osyxcel(m): 8:32pm On Oct 03, 2016 |
All these still doesn't matter. Julius Berger are not doing what is required of them to decongest that long bridge and reduce the sufferings of people on that road. |
List Of 25 Roads N100bn Sukuk Bond Proceeds Will Be Spent On - Fashola • How Jim Obazee Snubbed Buhari’s Directive- Punch Report • Julius Berger And RCC Have Started Work On Lagos-ibadan Expressway (PHOTO) • 2 • 3 • 4
3 Surprising Things Abubakar Shekau Said In Latest Message • ROCHAS OKOROCHA: Anambra Needs A Digital Governor • Nigerians React To Photos Of Cash Recovered From Former GMD NNPC Andrew Yakubu