Requirement For Processing Building Plan In Lagos State by shams040(op): 10:54pm On Jan 24, 2017
The following are the requirements to get your building plan approval in Lagos state.

1. Proof of land ownership/title document (CTC);
2. Copy of sun printed survey plan (Beacon sheet, in case of of scheme)
3. 4sets of architectural drawings
4. 4Set of structural drawings with calculation sheet
5. 4Set of mechanical and electronic drawings (for commercial, office, residential above 4 floors)
6. Current income tax clearance certificate
7. Current tax clearance certificate of 2 Directors and payee(corporate application)
8. Certificate of incorporation (corporate application)
9. Current special developement levey receipt
10. 3Different photographs of site with current date
11. Other requirements and clearance letter as required
Note all drawings should be in A3.

For more info visit www.egcandassociates.org.ng
Re: Requirement For Processing Building Plan In Lagos State by abbeyboy2o15(m): 4:31am On Jan 25, 2017
shams040:
The following are the requirements to get your building plan approval in Lagos state.

1. Proof of land ownership/title document (CTC);
2. Copy of sun printed survey plan (Beacon sheet, in case of of scheme)
3. 4sets of architectural drawings
4. 4Set of structural drawings with calculation sheet
5. 4Set of mechanical and electronic drawings (for commercial, office, residential above 4 floors)
6. Current income tax clearance certificate
7. Current tax clearance certificate of 2 Directors and payee(corporate application)
8. Certificate of incorporation (corporate application)
9. Current special developement levey receipt
10. 3Different photographs of site with current date
11. Other requirements and clearance letter as required
Note all drawings should be in A3.

For more info visit www.egcandassociates.org.ng
Nice right up
1 Reply

Processing Building Approval Will Only Take 28 Days – LASG • Requirements For Processing Building Plan In Lagos State • Requirement For Processing Building Plan In Lagos State • 2 • 3 • 4

Effective,functional,perfect Building Plan And Construction In Nigeria • For Sale 2acres Of Land Behind Fashola Est.,agbowa Ikorodu Lagos.#1.4m Per Acre • Introduction Of Hi-velm Limited (electrical/mechanical Engineers & Contractor)