Nairaland ForumNairaland GeneralPropertieshi (1903 Views)

1 Reply (Go Down)

hi by lighthousearc(op):
Hi
Re: hi by Fadelex(m): 12:06pm On Oct 12, 2017
send me your email... I have a sample and bill for it
Re: hi by lighthousearc(op):
hi
Re: hi by lighthousearc(op): 3:51pm On Oct 13, 2017
hello house
Re: hi by lighthousearc(op): 6:22am On Oct 15, 2017
good morning house
Re: hi by Fadelex(m): 6:27am On Oct 15, 2017
lighthousearc:
good morning house
sorry I've had a crazy schedule over the weekend. will get in touch asap
Re: hi by Nobody: 7:14am On Oct 15, 2017
Well, budget 27-31 million for everything( longspan aluminium roofing, all rooms ensuite with POP, High quality external security metal doors, quality Turkish internal doors, good quality Italian tiles, all round fence, interlocked compound and borehole) EXCLUDING land...... Don't forget to keep extra of about 1million for everything about processing C of O if u need one......Wish you goodluck......Cheers
Re: hi by lighthousearc(op):
Hi
Re: hi by Yungmilio2(m): 10:52am On Oct 15, 2017
ezesj:
Well, budget 27-31 million for everything( longspan aluminium roofing, all rooms ensuite with POP, High quality external security metal doors, quality Turkish internal doors, good quality Italian tiles, all round fence, interlocked compound and borehole) EXCLUDING land...... Don't forget to keep extra of about 1million for everything about processing C of O if u need one......Wish you goodluck......Cheers
With all that you mentioned above
What about the cost estimate for a 3bedroom bungalow

Thanks
Re: hi by Nobody: 12:37pm On Oct 15, 2017
lighthousearc:
27-31million can you explain further.
Well, about 10-11million will take u from the site preparation, DPC, foundation,first block work, first lintel level, decking, through to the second lintel level. 2.2-2.5 million will finish the roofing, giving you the complete carcass of the building..... the remaining 14-17 million will cover septic tanks, plastering , electrical works, plumbing works, fence, doors, gate, painting, tiles and other finishings to your taste) Note; Mr A can use mere 10million for finishings while Mr B can use up to 35million depending on taste...... Wish you well
Re: hi by Nobody: 12:40pm On Oct 15, 2017
Yungmilio2:
With all that you mentioned above
What about the cost estimate for a 3bedroom bungalow

Thanks
Well, 7.0-9.5million will be good, also depends on the finishing.... but with this you will get an average finishing EXCLUDING land...CHEERS
Re: hi by lighthousearc(op): 12:46pm On Oct 15, 2017
ezesj:
Well, about 10-11million will take u from the site preparation, DPC, foundation,first block work, first lintel level, decking, through to the second lintel level. 2.2-2.5 million will finish the roofing, giving you the complete carcass of the building..... the remaining 14-17 million will cover septic tanks, plastering , electrical works, plumbing works, fence, doors, gate, painting, tiles and other finishings to your taste) Note; Mr A can use mere 10million for finishings while Mr B can use up to 35million depending on taste...... Wish you well
I see. It would be a moderate finishes not very expensive because i build it mainly for commercial purposes. Do you mind giving me an estimate for the decking only.

Thank you.
Re: hi by Nobody: 1:00pm On Oct 15, 2017
lighthousearc:
I see. It would be a moderate finishes not very expensive because i build it mainly for commercial purposes. Do you mind giving me an estimate for the decking only.

Thank you.
From the decking area I can see in your plan you will need about 2.3-2.8million..... Depends largely on your choice of materials and bargaining power.... Can be dangerous to cut corners on rods and beams
Re: hi by Nobody: 1:12pm On Oct 15, 2017
lighthousearc:
Hi builders in the house, I am embarking on a 3 bedroom commercial "4 flat" project in Akure which i expect to start in January 2018. Please can anyone in the house give me rough estimation of how much it will cost me.

Thank you

1. POP finishes for the ceiling.
2. Basic floor tiles for the floors.
You can visit this thread .
https://www.nairaland.com/2910860/construction-process-3-bedroom-block
Re: hi by lighthousearc(op): 2:18pm On Oct 15, 2017
ezesj:
From the decking area I can see in your plan you will need about 2.3-2.8million..... Depends largely on your choice of materials and bargaining power.... Can be dangerous to cut corners on rods and beams
Wow � God have mercy every thing is expensive.
Re: hi by lighthousearc(op): 2:18pm On Oct 15, 2017
Re: hi by princeifynicky(m): 2:26pm On Oct 15, 2017
You can send a mail to us for a detailed Estimate for your proposed Building.

Check my signature.
Re: hi by lighthousearc(op):
princeifynicky:
You can send a mail to us for a detailed Estimate for your proposed Building.

Check my signature.
l
Re: hi by princeifynicky(m): 12:54am On Oct 17, 2017
lighthousearc:
lighthousearc@gmail.com
Please check your mail and acknowledge if seen.
Re: hi by lighthousearc(op):
Thank you , i will go through it and let you know

princeifynicky:
Please check your mail and acknowledge if seen.
I got the email in my spam. So far I think it’s very expensive but i believe it’s open for negotiations. ( “I can’t negotiate with the building materials”
Re: hi by lighthousearc(op): 3:46pm On Nov 22, 2018
q
Re: hi by lighthousearc(op): 1:24am On Aug 26, 2019
hi
Re: hi by lighthousearc(op): 1:24am On Aug 26, 2019
hie
1 Reply

hiHi Nairaland Builders, Do I Need To Do German Floor For My Bungalow?3bedrooms bungalow @ ibafo (Opposite MFM prayer city, beside Hi Impact Park)234

Hotel In Asaba Delta State, NigeriaLetting: 3 B/Rm Executive Bungalow With BQ-OgomboT.A GARDENS: 2 & 3 Bedroom Bungalow At Warewa Lagos Ibadan Expressway At 20m