Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,195,608 members, 7,958,845 topics. Date: Thursday, 26 September 2024 at 05:32 AM |
Nairaland Forum / Nairaland / General / Politics / 10MW Tiga, Kano Hydro Switchyard In Progress. Pix (22140 Views)
Pictures Of Zungeru Hydro Electric Power Project To Be Commissioned This Year / Photos From The Construction Of Zungeru hydro-Power Project / Umahi Completes 5th Flyover In Ebonyi, 4 Others In Progress (Photos) (2) (3) (4)
Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by Jeezuzpick(m): 4:59am On May 25, 2018 |
englishmart: You know those huge 250KVA Generators used to power university campuses? Well, 10MW is like 40 of those, without the noise, the fuel, the fumes. Think about that. 3 Likes 1 Share |
Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by Jeezuzpick(m): 5:06am On May 25, 2018 |
SalamRushdie: I see. Tiga is quite old (I heard of it in the early 90s), and it was not initially intended for power supply. It was meant for irrigation and perhaps drinking water. Someone recently decided to retrofit it to produce a little power, so here we are. The reservoir may actually not be able to produce the peak power rating of the turbines all year long, maybe even never. Well, its better than nothing. 1 Like 1 Share |
Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by Oritsewhandey(m): 6:12am On May 25, 2018 |
SalamRushdie: YES IT DOES HAVE THE CAPACITY. The excess flow of that same rivers gets DAMMED again at Hadeija and Auyo, after Kofar Alhaji, in Jigawa State. 2 Likes |
Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by hisgrace090: 6:23am On May 25, 2018 |
Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by Printerscanner: 6:25am On May 25, 2018 |
hillsiderfak: Dem no dey hear good news or do good things for una family? |
Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by BigBrother9ja: 6:26am On May 25, 2018 |
deji17:Lol Don't mind the senile old bastard thief 1 Like |
Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by miraclejoy: 6:40am On May 25, 2018 |
deji17: are sure you have travel through that road? that's what they have been doing on that road tile some few kilometers, whereas the rest are not even potholes but gp tank hole. As am talking to you now its not yet completed. And for your info the work currently going on that road is Enugu state govt (PDP) intervention on federal road. |
Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by Premiumwriter: 7:02am On May 25, 2018 |
hisgrace090:I've not heard that one before |
Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by hisgrace090: 7:03am On May 25, 2018 |
Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by Oblang(m): 7:29am On May 25, 2018 |
stiyke: Smh..just it is bin done by the one u hate... |
Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by bayori: 9:08am On May 25, 2018 |
LWKMD!!! aking123: |
Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by ANIOMADEI2018: 9:27am On May 25, 2018 |
igahdavid: My brother say it loud. Enugu-onitsha is back to life again. For almost 7 years, i used to go to Enugu through the old road and it takes like 3 hours from Onitsha. Today, it just about 1hour 30min to Enugu. I thank God for this administration.
|
Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by benzion72(m): 10:33am On May 25, 2018 |
deji17: I cannot see the House by the left in the new picture, this part of APC propangada |
Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by fabianjay101(m): 12:33pm On May 25, 2018 |
deji17:have you ever been to Enugu before? |
Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by chukel(m): 12:10pm On May 26, 2018 |
igahdavid:very correct. They are doing tremendous work on Enugu PH Road. I must commend this government. Please they should complete benin/okene/lokoja 1 Like |
Re: 10MW Tiga, Kano Hydro Switchyard In Progress. Pix by Obi1kenobi(m): 2:08pm On May 26, 2018 |
ANIOMADEI2018: I don't know what you've been smoking but I traveled to Nsukka 2 weeks ago to collect my certificate from UNN and we had to follow Old Road to Enugu because an extensive section of the Awka to Enugu road is in a mess. Some long sections of it, the road has been completely washed over by soil and turned to extensions of the bush overgrown by weeds. Also, the journey from Onitsha to Awka, very long stretches of the road are in horrible shape completely covered in red soil until you get close to Amawbia. Who exactly are you feeding these lies to? 1 Like |
Dangote Thanks Tinubu, Nigerians Over Refinery’s Takeoff / What I Know About Boko Haram – Modu Sheriff / Looters’ Special Court: Nominee-judges Fail Integrity Test-tribune
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 25 |