Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem - Properties (2) - Nairaland

Nairaland Forum / Nairaland / General / Properties / Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem (10373 Views)

Building 2bedroom Bungalow With Hidden Flat Roofing System / Lets Build a 2&3 Bedroom of four Flats As One Unit In Enugu State by Engr Dubem / *Let's Build a Sweet 5bedroom Duplex in Abia State, Nigeria by Engr Dubem (2) (3) (4)

(1) (2) (3) (4) (5) (Reply) (Go Down)

Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 12:20pm On Aug 31, 2020
eddybongo101:
Good morning. OP, pls what's the mix ratio that you used for the German floor?
Thanks


Good afternoon.

Ratio: 1bag of cement + 8buckets of sand +12buckets of local stone = the mix we used for the OSC
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by eddybongo101: 7:37pm On Aug 31, 2020
Dubemcapital1:



Good afternoon.

Ratio: 1bag of cement + 8buckets of sand +12buckets of local stone = the mix we used for the OSC

Thanks, i want to use 3/8 sharp sand alone to cast my DPC. what mix ratio should I use?
Thanks
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by eddybongo101: 8:22pm On Aug 31, 2020
Dubemcapital1:



Good afternoon.

Ratio: 1bag of cement + 8buckets of sand +12buckets of local stone = the mix we used for the OSC

Thanks, what's d mix ratio for German floor using 8/3 sand alone
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Godisgreatest1: 7:52am On Sep 01, 2020
Good morning, I noticed you used 6" Hole blocks for both internal and external walls. If someone intends to pass all the pipes through the wall can the sewage pipe, which is usually 4", pass through the 6" Hole blocks. Or is there another way of passing the pipes through this size of block?.

1 Like

Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 7:49pm On Sep 01, 2020
eddybongo101:


Thanks, what's d mix ratio for German floor using 8/3 sand alone

Why do you choose 8/3 sand for German floor? Have not used it before.

Try 1bag of cement: 6 buckets of sand : 10 buckets of 8/3 sand.

1 Like

Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 8:42pm On Sep 01, 2020
Godisgreatest1:
Good morning, I noticed you used 6" Hole blocks for both internal and external walls. If someone intends to pass all the pipes through the wall can the sewage pipe, which is usually 4", pass through the 6" Hole blocks. Or is there another way of passing the pipes through this size of block?.


Good evening, yeah the 6" hole block means we will install a surface waste pipe or exterior jalousie aluminum window
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 10:00pm On Sep 01, 2020
Day 19

Tuesday 1st Sept 20


Materials
1 trip of sharp sand @13,000
420 pcs of 6" block@130 = 54,600
Total = 67,000

Labour
Total block laid from OSC to Lintel is 2005pcs @35 = 70,175
Carpenter for lintel and pillar, 46 opening +13 pillars + 6 arch= 35,000
Mason servants @25000
Cast workers (all lintel and pillars) 14bags @600 =8400

Total = #138,575

Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Godisgreatest1: 10:15pm On Sep 01, 2020
Dubemcapital1:



Good evening, yeah the 6" hole block means we will install a surface waste pipe or exterior jalousie aluminum window

Ok, but what is the best thing to do If you someone wants the pipe to be inside the wall?, can you use 9" Hole for the toilet external walls and 6" Hole in other rooms of same building?. Thank you.
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by StarMonkey: 10:20pm On Sep 01, 2020
Dubemcapital1:
Day 19

Tuesday 1st Sept 20
Nice one.... following

1 Like

Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 10:25pm On Sep 01, 2020
Godisgreatest1:


Ok, but what is the best thing to do If you someone wants the pipe to be inside the wall?, can you use 9" Hole for the toilet external walls and 6" Hole in other rooms of same building?. Thank you.


Yes, very well.

1 Like

Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 6:27pm On Sep 02, 2020
Day 20

Wednesday 2nd Sept 20

Materials
1 bag of 3" Nail @8500
1000 gallon of water @ 3000
Total =11,500


Labour

Will edit all Labour cost at the end of this stage

2 Likes

Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 6:35pm On Sep 02, 2020
StarMonkey:
Nice one.... following


I see you sir, thanks a lot.

1 Like

Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by amalab30(m): 7:24pm On Sep 02, 2020
Following. You're a gem.

Dubemcapital1:
Day 20

Wednesday 2nd Sept 20

Materials
1 bag of 3" Nail @8500
1000 gallon of water @ 3000


Labour

Will edit all Labour cost at the end of this stage

1 Like

Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 5:53am On Sep 03, 2020
Godisgreatest1:
This is beautiful. Your work is neat and precise. The calculations really shows you are well experienced in building. I've only seen few threads that break down cost like this. Most of them are like galleries, they can only show photos, logos and phone numbers. Good job, i'm following this to learn. Thank you.


Thanks

1 Like

Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 5:55am On Sep 03, 2020
amalab30:
Following. You're a gem.



You are welcome
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 6:48pm On Sep 04, 2020
Day 21 & 22

Thursday and Friday 3rd & 4th Sept. 20

Materials & Details

50pcs of 2x3x12 Purlin @350 =17,500
10kg Binding wire @3,500
Transport = 1,600
30 pcs 6" block added @ 3,900
Total = 26,200

Labour
830 blocks laid @35 =29,030
7Mason servants @2000 =14,000
2bags for remaining lintels @600 = 1,200
Concrete coordinator = 4,000
Parapet wood construction= 45,000
Total= 93,230

2 Likes

Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 9:14pm On Sep 04, 2020
More pics on day 21 & 22

Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 8:24pm On Sep 08, 2020
Day 23, 24 & 25

Sunday, Monday and Tuesday 6th,7th&8the Sept

Materials & Details
20 diff sizes of window @530,000
10pcs of plank @1200 = 12000
15pcs of 2x3x12@ 300 =1500
15 pcs of 1x6x12 (½plank)@450= 6,750
Transport@1500
Total = #551,750


No Labour

1 Like

Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 7:35pm On Sep 11, 2020
Day 26,27&28

Wednesday to Friday 9th to 11the Sept.

Material & details

50 bags supaset cement@2,420 =121,000
1trip of gravel @ 17,000
1 trip of sand @ 13,000
140pcs of 2x4x14 @1100 =154,000
170pcs of 2x3x12 @ 400 = 68,000
1 cartoon of 3" nail @ 10,000
1 cartoon of 2" nail @10,000
Transport= 6000
Loading/off loading = 4100
Total = #404,000


Labour
18bags (Put together for parapet) x 650= 11,700
Coordinating Mason @6,000
Total = #17,700

1 Like

Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 6:28pm On Sep 12, 2020
Day 29

Saturday 12th Sept.


Window fabrication.

2 Likes

Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 8:11pm On Sep 13, 2020
Day 30

Sunday 13th Sept.


A roof wood structure or timber roof truss is a structural framework of timbers designed to bridge the space above a room, parlour etc. It provides support for the roofing sheet. This can be achieved with purlins of different sizes.

Labour
Roof wood structure @60,000

3 Likes

Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 7:03pm On Sep 17, 2020
Day 31 - Day34

14th to 17th Sept.

Materials & details
60pcs of 2x3x12 @500 =30,000
150 pcs of 2x3x12 @ 400 =60,000
Total = 90,000

2 Likes

Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Mup4life: 10:16pm On Sep 17, 2020
Pls what is the height of this kingpost and the width of the building?
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by PHIPEX(m): 12:00am On Sep 18, 2020
Great job, am observing keenly. Great job with the cost updates.
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 6:34am On Sep 18, 2020
Mup4life:
Pls what is the height of this kingpost and the width of the building?


Height of the king post truss is 14ft while the width of the building is 26ft
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 6:35am On Sep 18, 2020
PHIPEX:
Great job, am observing keenly. Great job with the cost updates.

Thanks
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by opes: 9:10am On Sep 18, 2020
Dubemcapital1:



Blinding is between 2" & 3" inches thickness

OSC is between 3" & 4" thickness.


Please how many trip(s)) of gravel, sand and number of bags of cement is needed for OSC of 3 inches thickness for 42ft x 35ft? thanks
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 4:58pm On Sep 18, 2020
opes:



Please how many trip(s)) of gravel, sand and number of bags of cement is needed for OSC of 3 inches thickness for 42ft x 35ft? thanks

34 or 35bags of cement will take care of that.
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 5:23pm On Sep 18, 2020
Day 35

18th Sept. 2020

Materials &details
4 bundles of 20mm pipe 9300 x4 - 37200
1 pkt Coupling 1200x 1 -1200
4 pkt Male Bush 1200x4 - 4800
2 pkt looping box 1000 x2- 2000
1 pkt u-box 1200 x1 -1200
5 pkt 3x3 Genesis 1100x5 - 5500
2 pkt 3x6 Genesis 1100x2 - 2200
4 pkt adaptable 6x9 700x 4 - 2800
2 cooker boxes 700x2 - 1400
3 pcs union gun 800x3 -2400
Transport - 500
Total 61, 200


Labour
Electrical Engrs - 25,000 ( structural)
Plaster masons - 120,000
Total - 145,000

2 Likes

Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by opes: 7:15pm On Sep 18, 2020
Dubemcapital1:

34 or 35bags of cement will take care of that.

Thanks. And please the trip of gravel and sand?
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 8:51pm On Sep 18, 2020
opes:



Thanks. And please the trip of gravel and sand?

Two trips each but both will remain
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 8:36pm On Sep 19, 2020
Day 36

Sat.19th Sept 2020

Material & details
2 trips of plaster sand@ 17000 =34,000 (bought yesterday though)
1 bundle of 20mm pipe @ 9300
1 pc of 6x6 adoptable box @600
1 Lgt of 2" PVC pipe @850
Total #44,750

2 Likes

(1) (2) (3) (4) (5) (Reply)

For Wood Laminate Floor,marble And Tiles : Sales And Instalation / Types Of Gutter And Cost / Half Plot @ Alabeko For #3.5m..behind Lekki Gardens 4, Lbs,ajah,lagos

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 39
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.