Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 12:20pm On Aug 31, 2020 |
eddybongo101: Good afternoon. Ratio: 1bag of cement + 8buckets of sand +12buckets of local stone = the mix we used for the OSC |
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by eddybongo101: 7:37pm On Aug 31, 2020 |
Dubemcapital1: Thanks, i want to use 3/8 sharp sand alone to cast my DPC. what mix ratio should I use? Thanks |
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by eddybongo101: 8:22pm On Aug 31, 2020 |
Dubemcapital1: Thanks, what's d mix ratio for German floor using 8/3 sand alone |
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Godisgreatest1: 7:52am On Sep 01, 2020 |
Good morning, I noticed you used 6" Hole blocks for both internal and external walls. If someone intends to pass all the pipes through the wall can the sewage pipe, which is usually 4", pass through the 6" Hole blocks. Or is there another way of passing the pipes through this size of block?. 1 Like |
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 7:49pm On Sep 01, 2020 |
eddybongo101: Why do you choose 8/3 sand for German floor? Have not used it before. Try 1bag of cement: 6 buckets of sand : 10 buckets of 8/3 sand. 1 Like |
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 8:42pm On Sep 01, 2020 |
Godisgreatest1: Good evening, yeah the 6" hole block means we will install a surface waste pipe or exterior jalousie aluminum window |
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 10:00pm On Sep 01, 2020 |
Day 19 Tuesday 1st Sept 20 Materials 1 trip of sharp sand @13,000 420 pcs of 6" block@130 = 54,600 Total = 67,000 Labour Total block laid from OSC to Lintel is 2005pcs @35 = 70,175 Carpenter for lintel and pillar, 46 opening +13 pillars + 6 arch= 35,000 Mason servants @25000 Cast workers (all lintel and pillars) 14bags @600 =8400 Total = #138,575
|
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Godisgreatest1: 10:15pm On Sep 01, 2020 |
Dubemcapital1: Ok, but what is the best thing to do If you someone wants the pipe to be inside the wall?, can you use 9" Hole for the toilet external walls and 6" Hole in other rooms of same building?. Thank you. |
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by StarMonkey: 10:20pm On Sep 01, 2020 |
Dubemcapital1:Nice one.... following 1 Like |
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 10:25pm On Sep 01, 2020 |
Godisgreatest1: Yes, very well. 1 Like |
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 6:27pm On Sep 02, 2020 |
Day 20 Wednesday 2nd Sept 20 Materials 1 bag of 3" Nail @8500 1000 gallon of water @ 3000 Total =11,500 Labour Will edit all Labour cost at the end of this stage 2 Likes
|
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 6:35pm On Sep 02, 2020 |
1 Like |
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by amalab30(m): 7:24pm On Sep 02, 2020 |
Following. You're a gem. Dubemcapital1: 1 Like |
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 5:53am On Sep 03, 2020 |
Godisgreatest1: Thanks 1 Like |
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 5:55am On Sep 03, 2020 |
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 6:48pm On Sep 04, 2020 |
Day 21 & 22 Thursday and Friday 3rd & 4th Sept. 20 Materials & Details 50pcs of 2x3x12 Purlin @350 =17,500 10kg Binding wire @3,500 Transport = 1,600 30 pcs 6" block added @ 3,900 Total = 26,200 Labour 830 blocks laid @35 =29,030 7Mason servants @2000 =14,000 2bags for remaining lintels @600 = 1,200 Concrete coordinator = 4,000 Parapet wood construction= 45,000 Total= 93,230 2 Likes
|
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 9:14pm On Sep 04, 2020 |
More pics on day 21 & 22
|
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 8:24pm On Sep 08, 2020 |
Day 23, 24 & 25 Sunday, Monday and Tuesday 6th,7th&8the Sept Materials & Details 20 diff sizes of window @530,000 10pcs of plank @1200 = 12000 15pcs of 2x3x12@ 300 =1500 15 pcs of 1x6x12 (½plank)@450= 6,750 Transport@1500 Total = #551,750 No Labour 1 Like
|
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 7:35pm On Sep 11, 2020 |
Day 26,27&28 Wednesday to Friday 9th to 11the Sept. Material & details 50 bags supaset cement@2,420 =121,000 1trip of gravel @ 17,000 1 trip of sand @ 13,000 140pcs of 2x4x14 @1100 =154,000 170pcs of 2x3x12 @ 400 = 68,000 1 cartoon of 3" nail @ 10,000 1 cartoon of 2" nail @10,000 Transport= 6000 Loading/off loading = 4100 Total = #404,000 Labour 18bags (Put together for parapet) x 650= 11,700 Coordinating Mason @6,000 Total = #17,700 1 Like
|
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 6:28pm On Sep 12, 2020 |
Day 29 Saturday 12th Sept. Window fabrication. 2 Likes
|
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 8:11pm On Sep 13, 2020 |
Day 30 Sunday 13th Sept. A roof wood structure or timber roof truss is a structural framework of timbers designed to bridge the space above a room, parlour etc. It provides support for the roofing sheet. This can be achieved with purlins of different sizes. Labour Roof wood structure @60,000 3 Likes
|
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 7:03pm On Sep 17, 2020 |
Day 31 - Day34 14th to 17th Sept. Materials & details 60pcs of 2x3x12 @500 =30,000 150 pcs of 2x3x12 @ 400 =60,000 Total = 90,000 2 Likes
|
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Mup4life: 10:16pm On Sep 17, 2020 |
Pls what is the height of this kingpost and the width of the building? |
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by PHIPEX(m): 12:00am On Sep 18, 2020 |
Great job, am observing keenly. Great job with the cost updates. |
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 6:34am On Sep 18, 2020 |
Mup4life: Height of the king post truss is 14ft while the width of the building is 26ft |
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 6:35am On Sep 18, 2020 |
PHIPEX: Thanks |
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by opes: 9:10am On Sep 18, 2020 |
Dubemcapital1: Please how many trip(s)) of gravel, sand and number of bags of cement is needed for OSC of 3 inches thickness for 42ft x 35ft? thanks |
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 4:58pm On Sep 18, 2020 |
opes: 34 or 35bags of cement will take care of that. |
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 5:23pm On Sep 18, 2020 |
Day 35 18th Sept. 2020 Materials &details 4 bundles of 20mm pipe 9300 x4 - 37200 1 pkt Coupling 1200x 1 -1200 4 pkt Male Bush 1200x4 - 4800 2 pkt looping box 1000 x2- 2000 1 pkt u-box 1200 x1 -1200 5 pkt 3x3 Genesis 1100x5 - 5500 2 pkt 3x6 Genesis 1100x2 - 2200 4 pkt adaptable 6x9 700x 4 - 2800 2 cooker boxes 700x2 - 1400 3 pcs union gun 800x3 -2400 Transport - 500 Total 61, 200 Labour Electrical Engrs - 25,000 ( structural) Plaster masons - 120,000 Total - 145,000 2 Likes
|
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by opes: 7:15pm On Sep 18, 2020 |
Dubemcapital1: Thanks. And please the trip of gravel and sand? |
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 8:51pm On Sep 18, 2020 |
opes: Two trips each but both will remain |
Re: Building 2bedroom Semi Detached (2unit in1) Bungalow @Nsukka Enugu by Engr Dubem by Dubemcapital1(m): 8:36pm On Sep 19, 2020 |
Day 36 Sat.19th Sept 2020 Material & details 2 trips of plaster sand@ 17000 =34,000 (bought yesterday though) 1 bundle of 20mm pipe @ 9300 1 pc of 6x6 adoptable box @600 1 Lgt of 2" PVC pipe @850 Total #44,750 2 Likes
|
Stainless Railings / Cost Of Building A Mini Flat / ULTRAMODERN 5 BEDROOM FULLY DETACHED DUPLEX, PEARL GARDENS, SANGOTEDO LEKKI
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 35 |