Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 7:17am On Feb 16, 2020*. Modified: 7:32am On Feb 16, 2020 |
Good morning.Thank you niaraland for the birthday wishes 
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 5:10am On Feb 16, 2020 |
Babs612000: Wow!!! That is 328 feets can you please post here or send the number or contact of the borehole person to babs612000@yahoo.co.uk. Many thanks. Sorry sir,the client was in charge of the borehole and getting such line now might be very hard. |
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 7:22pm On Feb 14, 2020 |
More update as the block work round up under 5daysAbout 98% of the building been cantilever in fight for space. Massive bedrooms, all with Walk-in-closet with a long mirror wall,massive toilet that can take wc,tub,shower,double basin and with free movement within the toilet... Bedrooms with sit-outs, master bedroom with ocean view design style with it's cantilever window and a private sit-out,master bedroom takes both standard bed and sofa arrangements per Client's choice. A library close to the master bedroom and children's bedroom...about 5ft away from the master's we have the children's bedroom for security reasons and convenience,easy movement within the building... upper lounge has a personal sit-out and a shelf wall as well.... He paid for the standard he got what he paid for...As far as the environment entails,this building has become a viewing point of standard,we hope to get one for you followers one day. Thanks for following Peace! 
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 3:41pm On Feb 14, 2020 |
Babs612000: Please what was the final meters that you end up with clean water. Can't recall again big man but seem around 100m or so |
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 3:40pm On Feb 14, 2020 |
|
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 8:50pm On Feb 13, 2020 |
Lintel works in progress A separate ring for the cantilever lintel.
|
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 8:47pm On Feb 13, 2020 |
Progress..3½ days to this level...
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 6:31pm On Feb 13, 2020 |
ikuku: Any more update on this project? The building is well completed...no more update on how it presently looks. As it stands we won't be able to post more than this since it's a personal project and not for sale. Thanks for following |
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 7:19pm On Feb 12, 2020 |
Growing out... watch out for this style of lintel works.
|
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 3:55pm On Feb 12, 2020 |
krissconnect: Nice work.. very clean i must say Thanks big big man  |
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 12:11pm On Feb 12, 2020 |
idefua: Good jobs you're doing, well-done. Please I have a question on the use of membrane on the deck, will under the deck not be too smooth to hold mortar during plastering, especially for those who can't afford POP ceiling? Thanks for following It's possible but with extra effort and the workmanship will charge higher than number plastering charges. Cheers! |
Properties › Re: CONTEMPORARY & AFFORDABLE BUILDING DESIGNS/NIGERIAN HOUSE PLANS STORE by Timtol(op): 7:43pm On Feb 11, 2020 |
Timtol: PROPOSED 4BEDROOM DUPLEX LOCATION: PORT HARCOURT, NIGERIA CLIENT: NAIRALANDER EXTERNAL DIMENSIONS(with the flower base port): 9.3m by 17m AREA OF PLOT ALLOCATED: 450.584QM
FEATURES
GROUND FLOOR
Entrance Anteroom Visitor's WC Guest bedroom ensuit with WIC Main lounge Dining with a winder Stairway of two turns Kitchen Store Landry with two exits at different point
FIRST FLOOR
Family lounge Sit-out Spacious girls bedroom of 5.4m by 4.2m ensuit with big WIC separately with toilet A sit-out for the bedroom Spacious Boy's Bedroom ensuit with separate WIC Library/Office Master bedroom ensuit with separate spacious WIC and a sit-out.
From our archive
|
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 7:40pm On Feb 11, 2020 |
Progress!!!
|
Properties › Re: CONTEMPORARY & AFFORDABLE BUILDING DESIGNS/NIGERIAN HOUSE PLANS STORE by Timtol(op): 1:46am On Feb 11, 2020 |
From our Archive. Passionate about offering the unrivalled quality. For more designs and construction across Nigeria kindly check thru our page. Thanks
|
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 12:54am On Feb 11, 2020 |
Commencement of the first floor block work Thanks for following so far and for those who has taken the opportunity to dial a call and send some messages...very grateful!
|
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 7:13pm On Feb 09, 2020 |
zamirikpo: Nice work bro. Pls Help me with this....
so I see u have 10 couches of blocks before lintel and another 3 Afterwards. Would this new height affect the amount of bamboo sticks u would buy? Cos I hear every bamboo stick is usually cut into two when setting up the frame work for the decking.
Then the boards u used for beams and columns , were u able to use them again for decking or the upper floor colums/beams/ lintel.
And lastly for the decking iron mesh, is their a standard pacing requirement. Thanks for following
1. Yes and no depending on region and available materials. For this particular one it is no to a large extent; we were able to get short bamboos(props) Yes in the sense that a place like Lagos is common having 20ft to 22ft/6m to 6.6m which is then cut into two and possibly longer ones.
2.The planks is reusable for columns and lintel only few might not be useful per the level of water absorbed. Marine is best in the situation,from foundation to final stage of the building marine board is ready for such with the essence of too much water.
3. If I get you well in the area of the spacing? Saw "pacing" It's been done to standard at 200C/C. Thanks |
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 10:47am On Feb 09, 2020 |
|
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 10:47am On Feb 09, 2020 |
Up to the next level. 2months hitting shortly tomorrow. 3months more for the roofing and interior works as the case may be. Expect better quality in the next construction.... Stagnancy is a disease
|
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 10:44am On Feb 09, 2020 |
Quality that breeds class. Clearly neat as perfect as you can think. Dioritestructures Limited
"Passionate about offering the unrivalled quality"
|
Properties › Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 5:41pm On Feb 08, 2020 |
|
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 3:57pm On Feb 08, 2020 |
First floor works commence shortly. Thanks for following... |
Properties › Re: CONTEMPORARY & AFFORDABLE BUILDING DESIGNS/NIGERIAN HOUSE PLANS STORE by Timtol(op): 3:56pm On Feb 08, 2020 |
|
Properties › Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 12:53am On Feb 08, 2020 |
Casting of pent floor decking, septic tank and columns for fence done.
|
Properties › Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 11:59pm On Feb 07, 2020 |
More
|
Properties › Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 11:58pm On Feb 07, 2020 |
Septic tank pending the time the estate finish the sewage system,basic provision has been made for that.
|
Properties › Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 11:56pm On Feb 07, 2020 |
More update from this desk
|
Properties › Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 11:54pm On Feb 07, 2020 |
Good evening
|
Properties › Re: CONTEMPORARY & AFFORDABLE BUILDING DESIGNS/NIGERIAN HOUSE PLANS STORE by Timtol(op): 10:16am On Feb 06, 2020 |
|
Properties › Re: Contemporary 3d/interior Works by Timtol(op): 7:19am On Feb 05, 2020 |
Happy New month |
Properties › Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 7:19am On Feb 05, 2020 |
All getting set. Thanks for following |
Properties › Re: CONTEMPORARY & AFFORDABLE BUILDING DESIGNS/NIGERIAN HOUSE PLANS STORE by Timtol(op): 7:18am On Feb 05, 2020 |
Thanks for your patronage and love alongside the trust!  |
Properties › Re: CONTEMPORARY & AFFORDABLE BUILDING DESIGNS/NIGERIAN HOUSE PLANS STORE by Timtol(op): 7:24pm On Feb 02, 2020 |
Timtol: PROPOSED 4BEDROOM DUPLEX LOCATION: PORT HARCOURT, NIGERIA CLIENT: NAIRALANDER EXTERNAL DIMENSIONS(with the flower base port): 9.3m by 17m AREA OF PLOT ALLOCATED: 450.584QM
FEATURES
GROUND FLOOR
Entrance Anteroom Visitor's WC Guest bedroom ensuit with WIC Main lounge Dining with a winder Stairway of two turns Kitchen Store Landry with two exits at different point
FIRST FLOOR
Family lounge Sit-out Spacious girls bedroom of 5.4m by 4.2m ensuit with big WIC separately with toilet A sit-out for the bedroom Spacious Boy's Bedroom ensuit with separate WIC Library/Office Master bedroom ensuit with separate spacious WIC and a sit-out.
|