Hi, can you help me calculate in details, the cost of fencing a plot of land in lekki phase 2? One side of the land(length) is already fenced and the measurement of the remaining 3 sides are--length-40.14m, front and back-25m each.A guy gave me the following estimates which i think are on the high side. 1.Clearing of site--15,000 2.Formwork to grroundbeam and column-qty=115.10@2100=241,710 3.Blockwork to fence-qty=136.11@2100=285,835 4.supply and install of gate-90,000 5.Reinforcement -qty1512kg @157=237,384 6.Excavation of foundation-20,000 7.Concrete in groundbeam and column-qty=13.1 @26000=340,000. Total==1,230,525 |
| Re: . by Nobody: 3:46am On Aug 18, 2011*. Modified: 11:15am On Dec 24, 2019 |
. |
| Re: . by ekinmogun: 3:36pm On Aug 18, 2011 |
These are the only details given except for the number of blocks and cement. Like front and back 375 blocks each and the side 611 blocks. cement-34 for block and 56 for concrete. |
| Re: . by Nobody: 2:37pm On Aug 19, 2011*. Modified: 11:16am On Dec 24, 2019 |
. |
| Re: . by Nobody: 2:55pm On Aug 28, 2011*. Modified: 11:16am On Dec 24, 2019 |
. |