Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 5:09am On Dec 27, 2020 |
kopell: That is a lot of investors, I think is better to have few investors that can put better resources together in form of share to the project. That is smart thinking. The investors wont be up to that. Because most of them would invest more than 5m each, some 10m etc |
Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 5:07am On Dec 27, 2020 |
kopell: Are you serious, what part of Lekki will be prefer location for the project, as we speak I have a friend that as about 60 plots for sale in Ibeju before eleko along lekki epe express on that main road. I can send you the video of the location tomorrow if you don't mind Chat me on WhatsApp. Though we prefer a location that is not beyond Sangotedo. |
Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 8:56pm On Dec 26, 2020 |
In 2021 we are putting together a group of investors to build the best Event Centre with some Lodging suites in Lekki. 500 persons. And each person would invest a Minimum of N1m. You get 100% returns and can divest (exit). |
|
Travel › Re: A Tour In The New Lagos To Ibadan Train, So Beautiful by abragr8: 6:29pm On Dec 26, 2020 |
Okay |
|
Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 9:27am On Dec 26, 2020 |
nedekid: Op just give a rough idea of the cost turnkey. Eg +50m, - 100m etc. It will enable some where their power reach and if it is necessary to call. With construction, finishes, Electrical and Digital installations etc it is N350m |
Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 9:19am On Dec 26, 2020 |
Stevengold: Very nice sir. I followed all through. But does is this really 3000 capacity? It looks small in my eyes though. The chairs were arranged with social Distancing so that is why it seems like that. Also the 2nd floor is a whole stretch is another long hall So I made the Structural strength to be so strong that it can even contain 10,000 people standing at worst case scenario |
|
|
Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 6:37am On Dec 26, 2020 |
Sitting on the stage
|
Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 4:22pm On Dec 25, 2020 |
View from the Gallery
|
Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 4:20pm On Dec 25, 2020 |
psychologist: Weldone sir
What is the depth of this 14m span beam? I used 3 and a half FULL 300mm Planks for the Bottom beam. 1100mm for the drop. Then you add the Slab thickness to it which is 200mm you get 1.3m deep beams. And very wide |
Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 4:15pm On Dec 25, 2020 |
Ok
|
Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 4:12pm On Dec 25, 2020 |
Dedication in December 2020
|
Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 4:11pm On Dec 25, 2020 |
DEDICATION OF THE EVENT CENTRE WAS CARRIED OUT BY A PREACHER FROM UYO CALLED DR ABEL DAMINA
Social Distancing didnt allow us to arrange the seats tightly as the capacity can carry
|
Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 4:09pm On Dec 25, 2020*. Modified: 6:35am On Dec 26, 2020 |
Donsheddy: how much will it cost to get this done from scratch to finish? Let's chat. Check my signature |
Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 4:07pm On Dec 25, 2020 |
kopell: The pillar that you're standing next to, is what I'm referring to as a shining pillar. As for the "Shinning Pillars" it's someone who handled that directly. |
Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 4:05pm On Dec 25, 2020 |
kopell: Congratulation Engineer, this is massive project deliver in record time. If I may asked how long the entire project took from foundation to roofing its astonishing to me. I know those government agencies are pain in the butt. I'm going through the same thing. It is never in the best interest of the owner to settle them, paying to government direct, get it well documented otherwise they will keep coming like termite. Can you please post the source of those shining pillars in the hall where it's sold or how it's made there. Here the application is clear, it's made up of paint and other addictive products. I'm trying to get something similar over there but I don't know where. I must commend you, you did a very nice and professional job. Thank you bros. When I said we settled them, it's not just to pay their Agents that come to the site. We settled the statutory fees directly from their head offices. Very many of them including Omonile. |
Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 12:17pm On Dec 25, 2020 |
Not 100% like the Model due to so many adjustments made by client
|
Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 12:16pm On Dec 25, 2020 |
|
Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 8:36am On Dec 25, 2020 |
Glass Curtain walls
|
Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 12:53am On Dec 25, 2020*. Modified: 8:38am On Dec 25, 2020 |
Fence
|
Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 12:43am On Dec 25, 2020 |
Gallery before cleaning
|
Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 12:41am On Dec 25, 2020 |
Finishing touch
|
Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 12:40am On Dec 25, 2020 |
Finishing in top gear for dedication deadline
|
Christianity Etc › Re: Transmission Of COVID-19 At Shiloh 2020 (Winners Chapel) by abragr8: 8:14pm On Dec 24, 2020 |
Story |
Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 8:08pm On Dec 24, 2020 |
POP
|
Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 7:59pm On Dec 24, 2020 |
Plastering finished for inside and bamboo scaffolds removed
|
Properties › Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 7:26pm On Dec 24, 2020*. Modified: 12:51am On Dec 25, 2020 |
Suspended ceiling for wind floor. Handled mainly by my Site Engineer Ola
|