Ayoade333's Posts
Nairaland Forum › Ayoade333's Profile › Ayoade333's Posts
Installation in progress
|
Project on going
|
Updated
|
Updated ,,, Our new project
|
The project is on going
|
Project on going... |
Updated ,Our new project
|
Our new project updated
|
We Cross check possible linkage before putting the unit in action |
We Cross check possible linkage before putting the unit in action |
1, Refrigeration equipment compressor unit assembling and installation-we are professional fabricated compressor rack factory over 20 years. 2, Refrigeration equipment evaporators installation When selecting the hanging point position, firstly consider the best position for the air circulation, and then consider the direction of the cold storage structure. The space between the evaporator and the cold room panel should be bigger than the thickness of the evaporator. All the hangers of the evaporator should be fastened, and the bolts and hanging bolts should be closed with a sealant to prevent air leakage. When the evaporator is too heavy, using a 4 or 5 angle iron to make the beam. The beam should span to another roof and wall panel to reduce the weight.3, Refrigeration equipment piping installation technology The diameter of copper pipe should strictly match with the interface diameter of compressor suction and exhaust valve. When the condenser and compressor are separated more than 3 meters, the pipe diameter should be increased. Keep the distance between the condenser suction air side and the wall over 400mm, and keep the distance between the outlet and the obstacle more than 3 meters. Discharge pipe and return pipe should have a certain slope. When the condenser position is higher than the compressor, the discharge pipe should be sloped to the condenser and a liquid ring should be installed at the compressor discharge mouth to prevent the gas cooling to liquid and returning to the mouth after compressor off. The U-bend should be installed at the exit of the evaporator air return pipe. The air return pipe should be sloped toward the compressor to ensure oil return smoothly. The expansion valve should be installed as close as possible to the evaporator. The solenoid valve should be installed horizontally. The valve body should be vertical and we should notice the direction of the liquid. after the completion of the welding of the entire refrigeration system, to do airtight experiments, high-pressure side of nitrogen filling 1.8MP. The low-pressure side is filled with nitrogen 1.2MP. During filling, soapy water is used for leak detection. Carefully check the welding, flange and valve. The pressure is kept for 24 hours. 4, Electrical system installation The selection of wire must have a safety factor. The temperature of the wire surface must not exceed 4 degrees during the compressor unit operating or evaporator defrosting . 5, Whole refrigeration equipment system commissioning Check all valves in the refrigeration system if it is in the normal open state or not, especially the exhaust stop valve. Do not close it. Open the cooling water valve of the condenser. If it is an air-cooled condenser, turn on the fans. Check that if the amount of water and the air flow rate meet the requirements or not. the electrical control circuit should be tested separately in advance, we should pay attention to whether the power supply voltage is normal before starting. Whether the oil surface of the compressor crankcase is in the normal position or not, it should generally be maintained at the horizontal centerline of the oil monitor. Why choose us? Your Cold Room Expert More than 18 years refrigeration equipment experience From design to installation&maintenance service , we provide one stop cold room solutions for your fresh life. We offer a wide variety of services for your refrigeration needs. Whether you need to have us consult on your plans, design your refrigeration system, supply the materials and equipment, install the equipment, or perform maintenance and repair services, we have the skills, expertise, technology, and tools to make it happen. CONTACT US @ 08037110658 or WHATAPP US WE GET BACK TO YOU.
|
1, Refrigeration equipment compressor unit assembling and installation-we are professional fabricated compressor rack factory over 20 years. 2, Refrigeration equipment evaporators installation When selecting the hanging point position, firstly consider the best position for the air circulation, and then consider the direction of the cold storage structure. The space between the evaporator and the cold room panel should be bigger than the thickness of the evaporator. All the hangers of the evaporator should be fastened, and the bolts and hanging bolts should be closed with a sealant to prevent air leakage. When the evaporator is too heavy, using a 4 or 5 angle iron to make the beam. The beam should span to another roof and wall panel to reduce the weight.3, Refrigeration equipment piping installation technology The diameter of copper pipe should strictly match with the interface diameter of compressor suction and exhaust valve. When the condenser and compressor are separated more than 3 meters, the pipe diameter should be increased. Keep the distance between the condenser suction air side and the wall over 400mm, and keep the distance between the outlet and the obstacle more than 3 meters. Discharge pipe and return pipe should have a certain slope. When the condenser position is higher than the compressor, the discharge pipe should be sloped to the condenser and a liquid ring should be installed at the compressor discharge mouth to prevent the gas cooling to liquid and returning to the mouth after compressor off. The U-bend should be installed at the exit of the evaporator air return pipe. The air return pipe should be sloped toward the compressor to ensure oil return smoothly. The expansion valve should be installed as close as possible to the evaporator. The solenoid valve should be installed horizontally. The valve body should be vertical and we should notice the direction of the liquid. after the completion of the welding of the entire refrigeration system, to do airtight experiments, high-pressure side of nitrogen filling 1.8MP. The low-pressure side is filled with nitrogen 1.2MP. During filling, soapy water is used for leak detection. Carefully check the welding, flange and valve. The pressure is kept for 24 hours. 4, Electrical system installation The selection of wire must have a safety factor. The temperature of the wire surface must not exceed 4 degrees during the compressor unit operating or evaporator defrosting . 5, Whole refrigeration equipment system commissioning Check all valves in the refrigeration system if it is in the normal open state or not, especially the exhaust stop valve. Do not close it. Open the cooling water valve of the condenser. If it is an air-cooled condenser, turn on the fans. Check that if the amount of water and the air flow rate meet the requirements or not. the electrical control circuit should be tested separately in advance, we should pay attention to whether the power supply voltage is normal before starting. Whether the oil surface of the compressor crankcase is in the normal position or not, it should generally be maintained at the horizontal centerline of the oil monitor. Why choose us? Your Cold Room Expert More than 18 years refrigeration equipment experience From design to installation&maintenance service , we provide one stop cold room solutions for your fresh life. We offer a wide variety of services for your refrigeration needs. Whether you need to have us consult on your plans, design your refrigeration system, supply the materials and equipment, install the equipment, or perform maintenance and repair services, we have the skills, expertise, technology, and tools to make it happen. CONTACT US @ 08037110658 or WHATAPP 08188892835 WE GET BACK TO YOU.
|
Our project
|
When it comes to manufacturing, supply, and installation of top-quality refrigeration rooms, cold rooms, freezer rooms, and blast freezer rooms, comes out as a clear winner in the race. We also have expertise in catering to the specific refrigeration requirements and applications of our clients in Africa. We take pride in offering the most efficient refrigeration need in Nigeria With our dedication and enthusiasm towards our work, we have achieved several milestones over the years. We have manufactured and installed a wide range of cold rooms throughout Nigeria as well as different other for a wide variety of applications. Contact Us :08037110658 ,,,/Whatapp Us : 08188892835
|
Marktouch Engineering Services specialize in the design and building of modular ambient, chill and cold rooms for many varied applications in Nigeria. We offer a full in-house design and installation service, listening to the requirements and ideas of our customers from the planning stages through to completion. With no restrictions on layout, configuration or size we are able to offer complete flexibility from design to installation, tailoring your cold room to your exact specifications. Our objective is to make the very best use of available space, ensuring the final product meets your exact requirements. We understand that quality and service is everything and we are proud of our reputation for manufacturing products of the highest standard and delivering projects on time. Our cold rooms, chillers the latest insulation materials, and come in various finishes and colors, including stainless steel. We offer bespoke door, floor, shelving and lighting solutions. Hinged and sliding doors can be made to any dimension, configuration or position, while our display coolers offer innovative glazing options. Installation all over Nigeria ,,Contact Us today 08037110658 or chat Us on Whatapp 08188892835 |
markrouch is a professional cold storage manufacturer in Nigeria . Who is mainly specialized in cold storage project and refrigeration equipment, its application range covers , fruit and vegetable storage, meat and seafood freezer, seed storage, drug and serum vaccine storage, red wine storage, tea storage, CA storage, frozen tunnel, blast freezer, etc. While its refrigeration equipments including semi/full-hermetic compressor unit, condensing unit, evaporator, condenser, PLC automatically control cabinet, as well as other items related to cold storage like panel, pipeline, refrigerant, etc. all have received high praise from our clients. Statistically, the cold storage project that marktouch is undertaking has exceeded 2 million tons.contact us 08037110658 |
Its beautiful in the city of Lagos.... |
Be a real estate consultant and make 500k every month ,sell more than 21 company real estate property in Nigeria ,, video lecture is free how to get a client to buy your product, be strong ,be courageous, be your own boss,,, to get started whatapp me on 08037110658 its all free.
|
Be a real estate consultant and make 500k every month ,sell more than 21 company real estate property in Nigeria ,, video lecture is free how to get a client to buy your product, be strong ,be courageous, be your own boss,,, to get started whatapp me on 08037110658 its all free.
|
Be a real estate consultant and make 500k every month ,sell more than 21 company real estate property in Nigeria ,, video lecture is free how to get a client to buy your product, be strong ,be courageous, be your own boss,,, to get started whatapp me on 08037110658 its all free.
|