Properties › Re: Construction Of Duplex And Attached Flats @isheri North GRA Lagos by BOUWEG(op): 8:47am On Dec 12, 2015 |
POP Work in progress
|
Properties › Re: Construction Of Duplex And Attached Flats @isheri North GRA Lagos by BOUWEG(op): 8:35am On Dec 12, 2015 |
princechigzy: The work is Simple and classic. The work is very impressive, keep it up Sir. thanks |
Properties › Re: Construction Of Duplex And Attached Flats @isheri North GRA Lagos by BOUWEG(op): 11:37am On Oct 21, 2015 |
Plastering work
|
Properties › Re: Construction Of Duplex And Attached Flats @isheri North GRA Lagos by BOUWEG(op): 12:09am On Sep 22, 2015 |
goodnews2013: Many thanks for the updates Please on the average, how much have been spent on the Carcass with roofing N2,000,000. |
Properties › Re: Construction Of Duplex And Attached Flats @isheri North GRA Lagos by BOUWEG(op): 4:34pm On Sep 20, 2015 |
Blockwork completed
|
Properties › Re: Construction Of Duplex And Attached Flats @isheri North GRA Lagos by BOUWEG(op): 11:28am On Sep 18, 2015 |
Blockwork in progress
|
Properties › Re: Construction Of Duplex And Attached Flats @isheri North GRA Lagos by BOUWEG(op): 11:13am On Sep 18, 2015 |
kopell: Waooooo, good job bros. Thank u sir |
Properties › Re: Construction Of Duplex And Attached Flats @isheri North GRA Lagos by BOUWEG(op): 2:33pm On Sep 14, 2015 |
Roof-work in progress
|
Properties › Re: Construction Of Duplex And Attached Flats @isheri North GRA Lagos by BOUWEG(op): 10:55am On Sep 11, 2015 |
Facial concrete/ Roof beam in progress
|
Properties › Re: Construction Of Duplex And Attached Flats @isheri North GRA Lagos by BOUWEG(op): 8:25pm On Sep 09, 2015 |
Cast Column
|
Properties › Re: Construction Of Duplex And Attached Flats @isheri North GRA Lagos by BOUWEG(op): 2:21am On Sep 09, 2015 |
Casting of 1st floor slab/ 1st floor column
|
Properties › Re: Construction Of Duplex And Attached Flats @isheri North GRA Lagos by BOUWEG(op): 2:15am On Sep 09, 2015 |
PropTrader: Thats how bad stories start. @PeoplesArmy has asked if there is a soil test report that should be the basis for any building structural design in that Isheri north area and he has not answered. Many houses in that area are tilted to one side or the other due to "settling" and the flooding in some parts can be terrible when it rains. Its better to loose a N100 than a N1000. Pls, help me with the name of that type of foundation beside is there any Raft foundation without ground beam and your so call Raft foundation described is called Cellular Raft. However, if a plot of land or more in dat area have low soil bearing capacity doesn't mean every other places there will and for your information some part of Isheri North GRA are normal stable land. |
Properties › Re: Construction Of Duplex And Attached Flats @isheri North GRA Lagos by BOUWEG(op): 2:11am On Sep 09, 2015 |
PropTrader: Thats how bad stories start. @PeoplesArmy has asked if there is a soil test report that should be the basis for any building structural design in that Isheri north area and he has not answered. Many houses in that area are tilted to one side or the other due to "settling" and the flooding in some parts can be terrible when it rains. Its better to loose a N100 than a N1000. Pls, help me with the name of that type of foundation beside is there any Raft foundation without ground beam and your so call Raft foundation described is called Cellular Raft. However, if a plot of land or more in dat area have low soil bearing capacity doesn't mean every other places there will and for your information some part of Isheri North GRA are normal stable land. |
Properties › Re: Construction Of Duplex And Attached Flats @isheri North GRA Lagos by BOUWEG(op): 2:05am On Sep 09, 2015 |
PeoplesArmy: There were some important questions on a duplicate thread which you didn't bother to answer or provide clarifications? Any reason for this?
https://www.nairaland.com/2569672/construction-duplex-attached-flats-isheri Pls, help me with the name of that type of foundation beside is there any Raft foundation without ground beam and your so call Raft foundation described is called Cellular Raft. However, if a plot of land or more in dat area have low soil bearing capacity doesn't mean every other places there will and for your information some part of Isheri North GRA are normal stable land. |
Properties › Re: Construction Of Duplex And Attached Flats @isheri North GRA Lagos by BOUWEG(op): 11:04am On Sep 05, 2015 |
Ground-Floor Column(Pillar) in progress
|
Properties › Re: Construction Of Duplex And Attached Flats @isheri North GRA Lagos by BOUWEG(op): 2:30pm On Sep 03, 2015 |
tc4official: I DON'T MEAN THE GERMAN FLOOR INCLUSIVE JUST ONLY THE RAFT. Yeah, German floor not included but the cost depends on the length, width and height of the foundation. The picture You saw was a combination of duplex and 3bedroom flat, so say 2.5m for each. |
Properties › Re: Construction Of Duplex And Attached Flats @isheri North GRA Lagos by BOUWEG(op): 7:06pm On Sep 02, 2015 |
|
Properties › Re: Construction Of Duplex And Attached Flats @isheri North GRA Lagos by BOUWEG(op): 6:55pm On Sep 02, 2015 |
Cast ground-floor Slab
|
Properties › Re: Construction Of Duplex And Attached Flats @isheri North GRA Lagos by BOUWEG(op): 6:41pm On Sep 02, 2015 |
smiley001: @BOUWEG sir, Dis project would definitely come out good. starting it qualitatively. Weldone sir.
For ur subsequent material needs (granite and stone dust), We r tested and trusted .
We know u may av someone dat supplies u but a trial may convince. We have our own trucks and we use our own trucks for delivery and dats y r prices are far different from others. We deliver a complete tonnage requested.
NB: If u r not satisfied with d tonnage and d quality of d material at delivery, u av d right not to pay us.
07081961127 for whatsapp and calls. adenijihoo@gmail.com. Bb pin: 7E2B91CE. Ok noted. |
Properties › Re: Construction Of Duplex And Attached Flats @isheri North GRA Lagos by BOUWEG(op): 6:40pm On Sep 02, 2015 |
|
Properties › Re: Construction Of Duplex And Attached Flats @isheri North GRA Lagos by BOUWEG(op): 6:37pm On Sep 02, 2015 |
tc4official: Please can you give me an idea of the amount spent to do just the raft. The cost is about 5million naira Contacts; ibitayofelix@yahoo.com, 09090419109, 08141197327, 08028519032 |
Properties › Construction Of Duplex And Attached Flats @isheri North GRA Lagos by BOUWEG(op): 12:00am On Sep 02, 2015 |
Please, find attached pictures of frame structure construction of Duplex and attached flats during Foundation work. The type of foundation used is called Raft foundation which is suitable in a water lounge area depending on the numbers of storey of the building. By: Bouweg best Nig.ltd. Contacts; 09090419109, 08141197327, 08028519032 |
Properties › Construction Of Duplex And Attached Flats @isheri North GRA Lagos by BOUWEG(op): 11:41pm On Sep 01, 2015 |
Please, find attached picture of Frame structure construction of Duplex and attached flats during the foundation work. This type of foundation is called Raft foundation(its suitable in water lounge area depending on the number of storey of the building.
|